Hirose Electric plans to invest ¥1.45 billion in assembly and component-manufacturing equipment, molds, and testing equipment at its Ichinoseki plant in Ichinoseki, Iwate. The project is scheduled to begin in April 2026 and be completed by March 2027, supporting production of multipole, coaxial, and other connectors.