Hirose Electric plans a ¥3.16 billion investment in assembly and component-manufacturing equipment and molds at the Miyako plant of Tohoku Hirose Electric in Miyako, Iwate. Construction is scheduled from April 2026 through March 2027, supporting production of multipole and coaxial connectors.