JScopeJapan Capex

Foster Electric (Bac Ninh) to install production equipment in Vietnam

Other ManufacturingVietnam

Foster Electric (Bac Ninh) plans to invest JPY 1.272 billion in production equipment at its Bac Ninh facility in Vietnam. Construction or installation is scheduled from April 2026 through March 2027; no post-completion capacity increase is disclosed.

Company
Foster Electric (Bac Ninh) Co., Ltd.
Investment
¥1.3B total
Location
Vietnam, Bac Ninh
Announced
Jun 24, 2026
Ticker
6794
Phase
planned
Construction start
Apr 1, 2026
Completion
Mar 1, 2027
Want the full picture?See what you get

Fujifilm Business Innovation begins full-scale operation of Circular Manufacturing Center in the Philippines

NewOther ManufacturingLagunaCompleted

Fujifilm Business Innovation began full-scale operation of its Circular Manufacturing Center in Laguna, Philippines, which it opened in July 2025 to refurbish used multifunction printers collected across the Asia-Pacific region. The facility started shipping refurbished ApeosPort-VII C R series machines on July 30 and has an exclusive area of approximately 500 sqm.

Kyowa Industry to build new factory at its Komatsu headquarters

Other ManufacturingIshikawaPlanned¥2B

Kyowa Industry plans to build a new factory at its headquarters site in Komatsu, Ishikawa. The project has a total planned investment of ¥2 billion and is scheduled for completion in October 2027; the disclosure does not specify the production capacity or construction start date.

Astroscale to develop LEXI-P life-extension service satellite in Colorado

Other ManufacturingColoradoUnder construction¥12.1B

Astroscale U.S. Inc. plans to invest JPY 12.095 billion in the LEXI-P life-extension service satellite at its U.S. headquarters and factory in Colorado. The project began in 2025 and is scheduled for completion in 2028, funded with internal resources.

SEMITEC to build new Chiba factory in Hanamigawa, Chiba

Other ManufacturingChibaPlanned¥2.5B

SEMITEC plans to construct a new factory in Hanamigawa Ward, Chiba City, with a total planned investment of ¥2.5 billion. The project is intended to increase production capacity and strengthen business continuity preparedness, with construction scheduled from December 2026 to December 2027.