HABIX to install pet-care product manufacturing equipment at Gifu plant

Other ManufacturingGifu

HABIX plans to invest JPY 4.4 billion in pet-care product manufacturing equipment at its Gifu plant in Motosu, Gifu. Construction is scheduled to start in January 2026 and be completed in March 2027, funded through internal funds and borrowings.

Company
HABIX Corporation
Investment
¥4.4B total
Location
Gifu, Motosu
Announced
Jun 22, 2026
Ticker
3895
Phase
planned
Construction start
Jan 1, 2026
Completion
Mar 1, 2027
Want the full picture?See what you get

Fujifilm Business Innovation begins full-scale operation of Circular Manufacturing Center in the Philippines

NewOther ManufacturingLagunaCompleted

Fujifilm Business Innovation began full-scale operation of its Circular Manufacturing Center in Laguna, Philippines, which it opened in July 2025 to refurbish used multifunction printers collected across the Asia-Pacific region. The facility started shipping refurbished ApeosPort-VII C R series machines on July 30 and has an exclusive area of approximately 500 sqm.

Kyowa Industry to build new factory at its Komatsu headquarters

Other ManufacturingIshikawaPlanned¥2B

Kyowa Industry plans to build a new factory at its headquarters site in Komatsu, Ishikawa. The project has a total planned investment of ¥2 billion and is scheduled for completion in October 2027; the disclosure does not specify the production capacity or construction start date.

Astroscale to develop LEXI-P life-extension service satellite in Colorado

Other ManufacturingColoradoUnder construction¥12.1B

Astroscale U.S. Inc. plans to invest JPY 12.095 billion in the LEXI-P life-extension service satellite at its U.S. headquarters and factory in Colorado. The project began in 2025 and is scheduled for completion in 2028, funded with internal resources.

SEMITEC to build new Chiba factory in Hanamigawa, Chiba

Other ManufacturingChibaPlanned¥2.5B

SEMITEC plans to construct a new factory in Hanamigawa Ward, Chiba City, with a total planned investment of ¥2.5 billion. The project is intended to increase production capacity and strengthen business continuity preparedness, with construction scheduled from December 2026 to December 2027.