| Company | Project | Sector | Location | Phase | ||
|---|---|---|---|---|---|---|
| 2026.09.03 | Goyo Foods Industry Co., Ltd. | Goyo Foods completes new Karatsu frozen-cake factoryGoyo Foods has completed a new factory in the Ishishi Industrial Park in Karatsu, Saga Prefecture. The facility is intended to expand production capacity and advance automation for the company's frozen-cake business, serving customers in Japan and overseas. | Food & Beverage | Karatsu, Saga | not disclosed | Completed |
| 2026.09.03 | JFE Engineering Corporation5411 | JFE Engineering launches MOF-based CO2 capture demonstration at Clean Plaza FujimiJFE Engineering will conduct Japan's first demonstration of separating and recovering CO2 from actual waste-incineration flue gas using metal-organic frameworks (MOFs). The pilot will use the Clean Plaza Fujimi waste-treatment plant in Mitaka, Tokyo, and is scheduled to run through the end of FY2026, with recovery of several kilograms of CO2 per day. | R&D Facilities | Chofu, Tokyo | not disclosed | Planned |
| 2026.09.03 | Nippon Shikizai, Inc.4920 | Nippon Shikizai opens Komoro cosmetics factoryNippon Shikizai, a Japanese cosmetics ODM/OEM manufacturer, held the opening ceremony for its newly acquired Komoro factory in Nagano Prefecture. The facility handles filling, packaging and finishing for makeup products such as mascara and eye shadow, and began operations on September 3, 2026. | Other Manufacturing | Komoro, Nagano | not disclosed | Completed |
| 2026.09.01 | CRE, Inc.3458 | CRE completes LogiSquare Kyotanabe B logistics facilityCRE completed the four-story LogiSquare Kyotanabe B multi-tenant logistics facility in Kyotanabe, Kyoto, on August 31, 2026. The 90,660.61 sqm facility can accommodate up to 12 tenants, offers 162 truck berths and 3,000 kW of high-voltage power, and forms a two-building project with adjacent LogiSquare Kyotanabe A totaling more than 240,000 sqm. | Logistics Facilities | Kyotanabe, Kyoto | not disclosed | Completed |
| 2026.09.01 | GS Yuasa Corporation6674 | GS Yuasa to open domestic stationary energy storage system plant in IbarakiGS Yuasa will develop a new manufacturing plant for stationary energy storage systems in Ibaraki Prefecture under its Ministry of Economy, Trade and Industry-approved battery supply security plan. The facility is scheduled to begin supply in October 2028, with production spanning domestically made lithium-ion battery cells through control systems. | Power & Energy | Ibaraki, Ibaraki | not disclosed | Planned |
| 2026.09.01 | Iino Kaiun Kaisha, Ltd.9119 | Iino Kaiun completes dual-fuel Ice Class VLGC LUMI AURORAIino Kaiun completed construction of the 93,000 cubic meter LPG/ammonia Very Large Gas Carrier LUMI AURORA at Hanwha Ocean's Okpo shipyard in South Korea. The LPG dual-fuel vessel is the company's third of its kind and is designed to reduce CO2 emissions while supporting winter navigation in the Baltic Sea. | Automotive & Transport | Geoje, South Korea | not disclosed | Completed |
| 2026.09.01 | INPEX Corporation1605 | INPEX to establish new energy R&D center in KashiwaINPEX will establish a new research and development center in the Kashiwanoha Campus area of Kashiwa, Chiba, to accelerate innovation in energy technologies. The center will include office and research space, an experimental building, and outdoor facilities, with construction planned to start in May 2027 and operations scheduled for April 2029. | R&D Facilities | Kashiwa, Chiba | not disclosed | Planned |
| 2026.09.01 | ITOKI Corporation7972 | ITOKI completes renewal of chair manufacturing hub in ShigaITOKI has renewed its 30-year-old mother factory and chair manufacturing site in Omihachiman, Shiga, reopening it in January 2026 as ITOKI DESIGN HOUSE SHIGA. The four-story, 2,568-sqm facility combines an external co-creation space, internal co-creation areas and a laboratory, employee workspaces, and a cafeteria, serving as a working showroom and development hub. | R&D Facilities | Omihachiman, Shiga | not disclosed | Completed |
| 2026.09.01 | The Kansai Electric Power Company, Incorporated9503 | Kansai Electric starts commercial operation of Borkum Riffgrund 3 offshore wind farm in GermanyKansai Electric has begun commercial operation of the Borkum Riffgrund 3 offshore wind power project in Germany, in which it participates alongside Gremont Partners and other investors. The offshore facility comprises 83 wind turbines located approximately 70 km from the coast, with total capacity of 913 MW. | Power & Energy | Germany | not disclosed | Completed |
| 2026.09.01 | Nippon Yusen Kabushiki Kaisha (NYK Line)9101 | Keihin Dock to establish Yokosuka Constellations Center for marine unmanned vehiclesNYK Line group company Keihin Dock signed a memorandum of cooperation with Oceanic Constellations and Sagami Transport Warehouse to establish the Yokosuka Constellations Center in Taura, Yokosuka. The planned facility will conduct research and development, construction and repair, and operational services for marine unmanned vehicles. | R&D Facilities | Yokosuka, Kanagawa | not disclosed | Planned |
| 2026.09.01 | Kyocera Corporation6971 | Kyocera completes Nagasaki Isahaya plantKyocera opened its Nagasaki Isahaya Plant on September 1, 2026, with an opening ceremony planned for spring 2027. The first building is a six-story steel-frame structure with 80,799 sqm of floor area on a 150,000 sqm site, producing fine ceramic components and semiconductor packages; Kyocera plans approximately JPY 68 billion in investment through fiscal 2028 and targets JPY 25 billion in annual sales from the plant from fiscal 2030. | Other Manufacturing | Isahaya, Nagasaki | ¥68B | Completed |
| 2026.09.01 | Kyushu Electric Power Co., Inc.9508 | Kyushu Electric Power plans new Shimousen-Matsubara pumped-storage power stationKyushu Electric Power has submitted a project-stage environmental consideration document for the planned new Shimousen-Matsubara pumped-storage hydroelectric power station. The submission marks an early planning and environmental-assessment stage; investment cost, capacity and construction schedule were not disclosed in the source. | Power & Energy | Kumamoto | not disclosed | Planned |
| 2026.09.01 | Okumura Corporation1833 | Okumura Corporation and Mitsubishi Corporation Urban Development start logistics facility at Hirano StationOkumura Corporation and Mitsubishi Corporation Urban Development began construction of a new logistics facility in Hirano-kita, Hirano Ward, Osaka City, as part of a mixed-use development near JR Hirano Station. The facility is scheduled for completion in winter 2028 and will benefit from access to central Osaka and Osaka Nanko logistics hubs. | Logistics Facilities | Osaka, Osaka | not disclosed | Building |
| 2026.09.01 | Reene Energy Co., Ltd.3289 | Reene Energy and Appletree to develop grid-scale battery storage facility in KakegawaReene Energy and Appletree will jointly develop a grid-connected battery storage facility in Kakegawa, Shizuoka, to store surplus renewable electricity and discharge it during evening demand peaks. Reene Energy will own and operate the facility, while Appletree will provide EPC services; construction is scheduled to start in October 2026, with operations targeted during FY2027. | Power & Energy | Kakegawa, Shizuoka | not disclosed | Planned |
| 2026.09.01 | Tamagawa Electronics Co., Ltd.6838 | Tamagawa Electronics to build second factory in Ayase, KanagawaTamagawa Electronics, a subsidiary of Tamagawa Holdings, plans to build a second factory near its headquarters in Ayase, Kanagawa, to expand production capacity for telecommunications and electronic equipment serving social infrastructure demand. JFE Conform has been selected as the planned construction contractor, with handover scheduled for December 2027. | Semiconductors & Electronics | Ayase, Kanagawa | ¥1.5B | Planned |
| 2026.08.28 | JFE Steel Corporation | JFE Steel to make large-scale equipment investment in OkayamaJFE Steel will expand surface-processing equipment for high-performance steel sheets at the Kurashiki district of its West Japan Works in Okayama, using Okayama Prefecture large-scale investment and regional hub promotion subsidy support. Construction is scheduled to start in October 2026, with operations beginning in June 2028. | Steel & Non-ferrous Metals | Kurashiki, Okayama | ¥14.8B | Planned |
| 2026.08.28 | Kokusai Kogyo Co., Ltd. | Kokusai Kogyo completes solar installations at two Muko public schoolsKokusai Kogyo, which owns and operates the facilities under an on-site PPA contract with Muko City, completed solar power generation systems designed and installed by SYLA Solar at Muko Municipal Dairoku Koyo Elementary School and Muko Municipal Nishinooka Junior High School in Kyoto. Construction ran from January 19 to February 28, 2026; the project provides renewable electricity and emergency power during outages. | Power & Energy | Muko, Kyoto | not disclosed | Completed |
| 2026.08.27 | Dai Nippon Printing Co., Ltd.7912 | Dai Nippon Printing opens FIO Lab manufacturing technology co-creation center in TsukubaDai Nippon Printing will open the FIO Lab at its Tsukuba Integrated Development Center in August 2026. The R&D facility will provide practical manufacturing-like environments for validating AI, robotics, equipment design, quality control and process-control technologies with corporate, university and research partners, supporting deployment across DNP manufacturing sites. | R&D Facilities | Tsukuba, Ibaraki | not disclosed | Planned |
| 2026.08.27 | Kioxia Corporation285A | Kioxia to build new K3 flash-memory manufacturing building at Kitakami PlantKioxia Corporation plans to construct K3, a new manufacturing building at its Kitakami Plant in Iwate, Japan. The project expands the company's domestic 3D flash-memory manufacturing capacity; the disclosure does not state an investment amount, capacity, contractor, or schedule. | Semiconductors & Electronics | Kitakami, Iwate | not disclosed | Planned |
| 2026.08.27 | Oriental Consultants Holdings Co., Ltd.2498 | OC Global launches shrimp aquaculture facility in Indonesia's Southeast SulawesiOriental Consultants Global (OC Global), through the jointly funded project company PT. Akuakultur Konawe Nusantara, held a groundbreaking ceremony for a whiteleg shrimp aquaculture facility in Polewali Village, Southeast Sulawesi, Indonesia. The facility is scheduled to start construction in August 2026, be completed by the end of May 2027, and begin shipments in July 2027, with planned annual production of approximately 1,300 tonnes and future expansion to approximately 4,000 tonnes. | Food & Beverage | Polewali Village, South Konawe Regency, Southeast Sulawesi | not disclosed | Building |
| 2026.08.27 | Renesas Electronics Corporation6723 | Renesas Electronics opens Physical AI and Robotics Lab in BeijingRenesas Electronics has opened a Physical AI and Robotics Lab in Beijing to support customer demonstrations, validation and co-development of next-generation robotics systems. The R&D facility will integrate hardware, software, AI models, control, power, sensing and system-level validation, serving as a hub from proof of concept through large-scale deployment. | R&D Facilities | Beijing, China | not disclosed | Completed |
| 2026.08.26 | Ishihara Sangyo Kaisha, Ltd.4028 | Ishihara Sangyo completes Blue Gene blue orchid development and production facilityIshihara Sangyo completed and held the ceremony for a new Blue Gene blue orchid development and production facility at its Yokkaichi Plant on August 26, 2026. The facility comprises a sterile culture room for propagating seedlings, a high-temperature greenhouse for cultivation and a low-temperature greenhouse for inducing flowering, enabling integrated in-house development and stable supply of high-quality flask seedlings. | Other Manufacturing | Yokkaichi, Mie | not disclosed | Completed |
| 2026.08.25 | ADEKA Corporation4401 | ADEKA to build TRANSPAREX manufacturing plant in South KoreaADEKA will build a new manufacturing plant for its high-performance TRANSPAREX clarifying agent at the third plant of subsidiary ADEKA KOREA CORPORATION in Wanju County, South Korea. The plant will be built in surplus space at an existing semiconductor-materials facility to secure supply as demand expands; construction is scheduled to run from December 2026 to June 2028, with operations beginning in November 2028. | Materials & Chemicals | Wanju County, South Korea | ¥6.5B | Planned |
| 2026.08.25 | Kawasaki Heavy Industries, Ltd.7012 | Kawasaki Heavy Industries starts construction of hydrogen production plant in KawasakiKawasaki Heavy Industries has begun construction of a steam methane reforming hydrogen production facility in the coastal area of Kawasaki, Kanagawa. Scheduled for completion in spring 2029, the plant will produce approximately 18 tonnes of high-purity hydrogen per day from city gas and supply it via a high-pressure hydrogen pipeline to the Kawasaki LH2 Terminal as part of a commercial liquefied-hydrogen supply-chain demonstration. | Power & Energy | Kawasaki, Kanagawa | not disclosed | Building |
| 2026.08.25 | Suzuki Motor Corporation7269 | Suzuki opens new four-wheel vehicle plant in Kharkoda, IndiaSuzuki Motor Corporation held the opening ceremony for its Indian subsidiary Maruti Suzuki India's newly built four-wheel vehicle plant in Kharkoda, Haryana. The facility currently has annual production capacity of 500,000 vehicles and is planned for expansion to approximately 1 million vehicles; the opening notice documents a completed manufacturing capex project. | Automotive & Transport | Kharkoda, Haryana | not disclosed | Completed |
| 2026.08.25 | Zeon Corporation4205 | ZEON to build new single-wall carbon nanotube plant at TokuyamaZEON has started construction of a new single-wall carbon nanotube (SWCNT) plant at its Tokuyama Factory in Shunan, Yamaguchi. The plant will use an advanced proprietary process based on the Super Growth method and is expected to begin full-scale operations in 2028, expanding production capacity several dozen times from the current level to meet growing lithium-ion battery demand. | Materials & Chemicals | Shunan, Yamaguchi | not disclosed | Building |
| 2026.08.24 | CRE, Inc.3458 | Hankyu Hanshin Properties and CRE complete Sembcorp Logistics Park (Dinh Vu) in VietnamHankyu Hanshin Properties and CRE, together with Singapore's Sembcorp Development, completed five newly constructed logistics buildings at Sembcorp Logistics Park (Dinh Vu) in the Dinh Vu Industrial Park in Hai Phong, Vietnam. The project comprises six buildings including one acquired existing warehouse, with approximately 86,200 sqm of leasable area; construction started in June 2025 and was completed in August 2026. | Logistics Facilities | Hai Phong, Vietnam | not disclosed | Completed |
| 2026.08.24 | Nippon Marine Foods Co., Ltd. | Nippon Marine Foods to build new seafood-processing plant in ShimonosekiNippon Marine Foods has decided to build a new plant on its headquarters factory site in Otsubo-honmachi, Shimonoseki, to expand production of processed seafood products. The project is being advanced under a construction agreement with Shimonoseki City, with a signing ceremony scheduled for August 31, 2026. | Food & Beverage | Shimonoseki, Yamaguchi | not disclosed | Planned |
| 2026.08.24 | Sumitomo Heavy Industries, Ltd.6302 | Sumitomo Heavy Industries begins commissioning Niihama gasification pilot facilitySumitomo Heavy Industries has started commissioning a pilot-test facility for gasification in Niihama, Ehime, Japan. The facility is an R&D and pilot plant for validating gasification technology and related process equipment; no investment amount or capacity is disclosed in the provided text. | R&D Facilities | Niihama, Ehime | not disclosed | Completed |
| 2026.08.24 | TRUSCO NAKAYAMA CORPORATION9830 | TRUSCO Nakayama opens new HC East Japan Logistics Center in SanjoTRUSCO Nakayama began operating a newly relocated logistics center in Sanjo, Niigata, serving home-center distribution routes and consolidating imported products arriving via Niigata Port. The facility expands inventory, shipping and hazardous-material storage capacity, with automated pallet storage and a t-Sort flat sorting robot system. | Logistics Facilities | Sanjo, Niigata | ¥18.6B | Completed |
| 2026.08.24 | Tsuruya Co., Ltd.5386 | Tsuruya starts operating an on-site solar power facility at its Agui plantTsuruya has begun operating a solar power facility at its Agui Plant in Aichi under an on-site power purchase agreement with Toenec and Sumitomo Mitsui Trust Panasonic Finance. The facility began operation on August 1, 2026, with 1,120.9 kW of installed capacity and expected annual generation of 1,414 MWh. | Power & Energy | Agui, Aichi | not disclosed | Completed |
| 2026.08.21 | ADEKA Corporation4401 | ADEKA launches new Semiconductor Innovation Center in KukiADEKA has begun full-scale operations at its new Semiconductor Innovation Center within the ADEKA Technology Center Kuki in Saitama. The facility consolidates and expands semiconductor-materials research, with cleanrooms and evaluation equipment for advanced front-end and back-end semiconductor materials. | R&D Facilities | Kuki, Saitama | ¥12B | Completed |
| 2026.08.21 | ADEKA Corporation4401 | ADEKA to double photo-acid generator capacity at Chiba plantADEKA will expand production equipment for photo-acid generators used in advanced semiconductor photoresists, including EUV lithography, by adding a manufacturing line inside an existing building at its Chiba plant in Sodegaura. The approximately ¥1 billion investment is scheduled to start construction in January 2027, finish in February 2028, and begin commercial operations in September 2028, doubling capacity from the current level. | Materials & Chemicals | Sodegaura, Chiba | ¥1B | Planned |
| 2026.08.21 | FUJIFILM Business Innovation Corp. | Fujifilm Business Innovation begins full-scale operation of Circular Manufacturing Center in the PhilippinesFujifilm Business Innovation began full-scale operation of its Circular Manufacturing Center in Laguna, Philippines, which it opened in July 2025 to refurbish used multifunction printers collected across the Asia-Pacific region. The facility started shipping refurbished ApeosPort-VII C R series machines on July 30 and has an exclusive area of approximately 500 sqm. | Other Manufacturing | Calamba, Laguna | not disclosed | Completed |
| 2026.08.21 | FUJIFILM Electronics Materials Co., Ltd.4901 | Fujifilm completes new advanced semiconductor materials building at Oita plantFujifilm has completed a new building at the Oita plant of Fujifilm Electronics Materials Co., Ltd. and began operations in August 2026. The facility manufactures and tests post-CMP cleaners, adding automated production equipment and quality-evaluation instruments to expand the plant's manufacturing capacity to three times its previous level, supporting growing AI-semiconductor demand. | Materials & Chemicals | Oita, Oita | ¥7B | Completed |
| 2026.08.21 | Electric Power Development Co., Ltd. (J-POWER)9513 | J-POWER to build GPU data center in Kaminokuni, HokkaidoJ-POWER has decided to develop and operate its first data center, the Kaminokuni Data Center project, in Kaminokuni, Hokkaido. The facility will use GPU-equipped servers, cooling systems and 40-foot containers to sell computing capacity for generative AI development and simulations, with service launch planned for summer 2027. | Data Centers | Kaminokuni, Hokkaido | not disclosed | Planned |
| 2026.08.21 | MEGMILK SNOW BRAND Co., Ltd.2270 | Megmilk Snow Brand Vietnam starts operations at new process cheese factoryMegmilk Snow Brand Vietnam, a subsidiary of Japanese dairy company MEGMILK SNOW BRAND Co., Ltd., held an opening ceremony on July 9, 2026, for a newly constructed factory producing processed cheese. The Vietnam manufacturing and sales base is intended to capture growing local demand and support expansion into neighboring Asian markets. | Food & Beverage | Vietnam | not disclosed | Completed |
| 2026.08.21 | Olympus Corporation7733 | Olympus completes new B Building at Nagano site for medical-device component productionOlympus has completed the new B Building at its Nagano site in Tatsuno, Nagano, consolidating development and manufacturing functions and establishing a production base for key medical-device components. Construction began in February 2025, with full operation targeted for FY2026; the building has 17,665 sqm of total floor area and a total construction cost of approximately ¥18 billion. | Pharma & Medical | Tatsuno, Nagano | ¥18B | Completed |
| 2026.08.21 | PlantX | PlantX completes next-generation indoor plant-factory demonstration facility in TokyoPlantX completed the Shinonome Demonstration Base in Koto, Tokyo, and held its opening ceremony on July 8, 2026. The facility is equipped with the company's latest modular cultivation systems and automated equipment to demonstrate labor-saving and resource-efficient indoor farming technologies ahead of mass production. | Food & Beverage | Koto, Tokyo | not disclosed | Completed |
| 2026.08.21 | Sakata Seed Corporation1377 | Sakata Seed Iberica to develop office, warehouse and greenhouse facilities in AndaluciaSakata Seed Iberica S.L., a subsidiary of Japanese seed company Sakata Seed Corporation, plans to develop office, warehouse and greenhouse facilities in Andalucia, Spain. The project has a total planned investment of ¥1.338 billion, with construction scheduled from July 2024 to July 2027. | Food & Beverage | Andalucia, Spain | ¥1.3B | Building |
| 2026.08.21 | Sakata Seed Corporation1377 | Sakata Seed to build research facility in KakegawaSakata Seed Corporation plans to develop a research facility in Kakegawa, Shizuoka. The project has a total planned investment of JPY 2.115 billion, with construction starting in February 2026 and completion scheduled for May 2027. | R&D Facilities | Kakegawa, Shizuoka | ¥2.1B | Building |
| 2026.08.21 | Yukiguni Factory Co., Ltd.1375 | Yukiguni Factory to open Kinoko Mirai Lab R&D facility in KawaguchiYukiguni Factory will open the Kinoko Mirai Lab on July 6, 2026, in Kawaguchi, Saitama. The new R&D hub will combine existing mushroom research with research into functional materials and new technologies, supporting collaboration with customers and universities and the creation of new businesses. | R&D Facilities | Kawaguchi, Saitama | not disclosed | Completed |
| 2026.08.20 | Denco Techno Heat Co., Ltd.6706 | Denco Techno Heat to relocate and build a new Suzuka heat-treatment factoryDenco Techno Heat, a wholly owned subsidiary of DKK Co., Ltd., will relocate its Suzuka factory to a newly acquired site in Kono-cho, Suzuka, Mie. The new facility will use DX, robotics and automated induction-heating equipment to raise production capacity by 30% versus the existing plant, with a planned 244 kW self-consumption solar installation. The factory building is scheduled for completion in March 2027, with all equipment relocation due to finish in January 2028. | Materials & Chemicals | Suzuka, Mie | not disclosed | Planned |
| 2026.08.20 | Tokuyama Corporation4043 | Tokuyama opens new semiconductor polysilicon plant in Ho Chi Minh CityTokuyama held the opening ceremony for a new semiconductor-grade polysilicon plant operated by its wholly owned subsidiary Tokuyama Vietnam in the Phu My 3 Special Industrial Park, Ho Chi Minh City. The facility will crush and wash polysilicon and serve as an overseas supply-chain hub, with trial operations and quality verification to follow. | Materials & Chemicals | Ho Chi Minh City, Vietnam | ¥3.5B | Completed |
| 2026.08.19 | PT Mulya Energi Lestari6092 | MEL starts commercial operation of 3.4 MW Pungga small hydropower plant in North SumatraPT Mulya Energi Lestari has started commercial operation of its 3.4 MW run-of-river Pungga small hydropower plant in North Sumatra, Indonesia. The facility supplies renewable electricity to Indonesia's state-owned utility PLN under a long-term power purchase agreement and is expected to reduce greenhouse-gas emissions by 8,863 tCO2 annually; EnBio Holdings participates through its jointly managed investment vehicle Alamport Renewables. | Power & Energy | North Sumatra, Indonesia | not disclosed | Completed |
| 2026.08.19 | Mitsubishi Chemical Corporation4188 | Mitsubishi Chemical to install ultra-high-purity colloidal silica production equipment in KitakyushuMitsubishi Chemical will commercialize ultra-high-purity colloidal silica for polishing slurries used in advanced semiconductor manufacturing by installing new production equipment at its Kyushu Plant in Kitakyushu, Fukuoka. Commercial operations are scheduled to begin in October 2028, supporting semiconductor materials demand driven by generative AI and data centers. | Materials & Chemicals | Kitakyushu, Fukuoka | not disclosed | Planned |
| 2026.08.19 | NTT West9432 | NTT West to build AI-ready data center in FukuokaNTT West will build a next-generation AI-ready data center in Fukuoka, one of two announced together with a second site, to meet rising demand for AI infrastructure and to strengthen connections with overseas networks. No investment amount, capacity or completion date was disclosed. | Data Centers | Fukuoka, Fukuoka | not disclosed | Planned |
| 2026.08.19 | NTT West9432 | NTT West to build AI-ready data center in OsakaNTT West will build a next-generation AI-ready data center in Osaka, one of two announced together with a second site, to meet rising demand for AI infrastructure and to strengthen connections with overseas networks. No investment amount, capacity or completion date was disclosed. | Data Centers | Osaka, Osaka | not disclosed | Planned |
| 2026.08.19 | Pasona Group Inc.2168 | Pasona Group to open permanent offshore art stage on Awaji IslandPasona Group will open the permanent PASONA HARBOR STAGE offshore on Awaji Island, Hyogo, on July 17, 2026. The multipurpose venue will host concerts and events and includes a 550-seat audience area, a 900 sqm viewing area, a 600 sqm stage, and large-scale projection equipment; it will be operated by Nijigennomori. | Other | Awaji, Hyogo | not disclosed | Planned |
| 2026.08.19 | TOTO Ltd.5332 | TOTO to build ceramic R&D facility at Chigasaki plantTOTO will build a new R&D building within its Chigasaki plant in Kanagawa to accelerate development of next-generation electrostatic chucks and AD components for semiconductor manufacturing equipment. The facility will expand prototype production lines and is scheduled to start construction in December 2026 and be completed in April 2028. | R&D Facilities | Chigasaki, Kanagawa | ¥17B | Planned |
Page 1 of 25
Phase colours run planned → building → completed. Looking for one company's whole footprint? See companies. Narrow by region and prefecture in the filters on the left.