JScopeJapan Capex

Chuo Malleable Iron Co., Ltd.

TSE 56074 tracked projects¥1.1B disclosed

Sectors

Steel & Non-ferrous Metals

Where it builds

Gifu, Aichi, Kumamoto

Stage

4 planned

Every tracked project

4
PostedProjectSectorLocationInvestmentPhase
2026.08.03Chuo Malleable Iron to install casting equipment at Gifu Kujiri PlantChuo Malleable Iron plans to install casting equipment at its Gifu Kujiri Plant in Toki, Gifu. The equipment is a replacement investment with no increase in production capacity; construction is scheduled from March 2026 to March 2027 and will be funded internally.Steel & Non-ferrous MetalsToki, Gifu¥84.4MPlanned
2026.08.03Chuo Malleable Iron to install casting equipment at Nisshin PlantChuo Malleable Iron plans to invest in casting equipment at its Nisshin Plant in Nisshin, Aichi. The equipment is scheduled for installation from March 2026 through March 2027 and will replace existing equipment without increasing capacity.Steel & Non-ferrous MetalsNisshin, Aichi¥828.8MPlanned
2026.08.03Chuo Malleable Iron to install casting equipment at Toki siteChuo Malleable Iron Co., Ltd. plans to invest JPY 52.018 million in casting equipment at its Toki, Gifu site. The equipment will replace existing assets, so no capacity increase is expected; construction is scheduled from April 2026 through March 2027.Steel & Non-ferrous MetalsToki, Gifu¥52MPlanned
2026.08.03Chuo Malleable Iron to install processing equipment at Kumamoto plantChuo Malleable Iron plans to invest in processing equipment at its Kumamoto plant in Ozu, Kumamoto. The equipment will replace existing equipment, with no increase in production capacity; construction is scheduled from March 2026 to March 2027.Steel & Non-ferrous MetalsOzu, Kumamoto¥123.1MPlanned

Also building in Steel & Non-ferrous Metals

Browse the sector: Steel & Non-ferrous Metals.