JScope
Logistics facilityLogistics & transport services

MonotaRO installs rooftop solar power system at Ibaraki logistics center

MonotaRO Co., Ltd.Ibaraki-machi, IbarakiPublished
InvestmentNot disclosed
PhaseCompleted
Start—
CompletionJul 22, 2026

MonotaRO began operating a self-consumption solar power system at its Ibaraki Chuo Satellite Center in Ibaraki Prefecture, with 531.2kW capacity expected to generate about 534,000 kWh annually, covering roughly 25% of the facility's power consumption. The project supports the company's climate target of cutting CO2 emissions 50% by 2030 versus 2020 levels.

Project facts

Owner
MonotaRO Co., Ltd.
Listing
3064 Tokyo
Facility
Logistics facility
Sector
Logistics & transport services
Location
Ibaraki-machi, Ibaraki, Japan
Investment
Not disclosed
Scale / capacity
531.2 kW solar panel capacity, approx. 534,000 kWh/year generation
Contractor
Looop Inc.
Completion
Jul 22, 2026
Announced
Jul 22, 2026
Themes
renewable-energy

Figures and schedules are as announced by the company or the public body concerned; plans can change. Amounts that were not disclosed are recorded as not disclosed, never estimated.

Also in Ibaraki7 projects · ¥77B disclosedOn the map →

Latest in Logistics & transport servicesAll Logistics & transport services →

Ichigo starts construction of Narita Logistics Center

NewLogistics & transport servicesChibaUnder construction

Ichigo has started construction of the Ichigo Narita Logistics Center in Narita, Chiba, its sixth logistics-facility development project and third in the area. Ichigo Estate, a wholly owned subsidiary, is the project owner, while Takuyo is responsible for design and construction and will master-lease the facility; completion is scheduled for January 2028.

Nissin completes Kobe Chemical Center logistics hub

Logistics & transport servicesHyogoCompleted

Nissin has completed the Kobe Chemical Center in Kobe, Hyogo, and held its completion ceremony on October 8, 2026. The logistics facility addresses growing demand for hazardous-material storage in the Kansai region and includes refrigerated and ambient hazardous-material warehouses, a high-pressure gas warehouse, a general warehouse, outdoor storage, mobile racks, and emergency power generation.

CRE completes Logi Square Tosu II logistics facility

Logistics & transport servicesSagaCompleted

CRE and Fukuoka Jisho jointly developed and completed the Logi Square Tosu II logistics facility in Tosu, Saga, on September 30, 2026. The two-story warehouse provides 36,575.50 sqm of gross floor area, 40 simultaneous truck berths and capacity for up to four tenant subdivisions.

Hankyu Hanshin Properties starts construction of cold-storage logistics facility Logista Naruo-hama

Logistics & transport servicesHyogoUnder construction

Hankyu Hanshin Properties and Hanshin Electric Railway have started construction of Logista Naruo-hama, the first refrigerated and frozen logistics facility in the Logista series, on the former Hanshin Tigers farm facility site in Nishinomiya, Hyogo. All frozen-storage sections will support flexible temperature settings from -25C to +5C, with completion scheduled for the end of October 2028; the facility is also planned to obtain ZEB certification using rooftop solar generation.