JScope
Power plantPower & energyOverseas

Yakult to install solar power generation at Philippines Yakult No. 2 factory

Yakult Honsha Co., Ltd.PhilippinesPublished
InvestmentNot disclosed
PhasePlanned
Start—
Completion—

Yakult Honsha will introduce solar power generation at its Philippines Yakult No. 2 factory to promote decarbonization. The project is the Yakult Group's first initiative to use Japan's Joint Crediting Mechanism (JCM).

Project facts

Owner
Yakult Honsha Co., Ltd.
Listing
2267 Tokyo
Facility
Power plant
Sector
Power & energy
Location
Philippines (overseas)
Investment
Not disclosed
Announced
Jun 25, 2026
Themes
renewable-energy

Figures and schedules are as announced by the company or the public body concerned; plans can change. Amounts that were not disclosed are recorded as not disclosed, never estimated.

Also in Philippines2 projectsOn the map →

Latest in Power & energyAll Power & energy →

Keiyo Gas launches 2 MW/8 MWh grid-scale battery storage facility in Isesaki

NewPower & energyGunmaCompleted

Keiyo Gas opened its first domestic grid-scale battery storage facility in Isesaki, Gunma, beginning full-scale operation on October 1, 2026. The 2 MW, 8 MWh high-voltage facility is operated by KG BESS LLC and was developed and constructed by Sun Village; Marubeni New Power handles market transactions as aggregator.

Chubu Electric Power starts commercial operation of Noba Solar Power Plant in Hachinohe

Power & energyAomoriCompleted

KC-22 Investment, jointly funded by Chubu Electric Power and Komata Construction, completed construction of the Noba Solar Power Plant in Hachinohe, Aomori, and began commercial operation on October 1, 2026. The plant has 1,990 kW of generating capacity and is expected to produce approximately 3.4 million kWh annually.

Kawada Industries installs 519.68 kW solar PPA system at Yasui Factory

Power & energyToyamaCompleted

Kawada Industries introduced an on-site solar power purchase agreement system at its Yasui Factory in Nanto, Toyama, starting September 1, 2026. The system is expected to generate 526,900 kWh annually, with surplus electricity supplied to three other Kawada facilities in the Toyama area.