JScope
Power plantPower & energy

Arata installs 589.84 kW solar power system at Kyushu South Center

Arata CorporationKagoshima, KagoshimaPublished
InvestmentNot disclosed
PhaseCompleted
Start—
CompletionFeb 2026

Arata installed a self-consumption solar power generation system under a power purchase agreement at its Kyushu South Center logistics facility in Kagoshima. The system began operating in February 2026, with planned annual generation of 603,707 kWh and surplus electricity supplied to the surrounding area as CO2-free power.

Project facts

Owner
Arata Corporation
Listing
2733 Tokyo
Facility
Power plant
Sector
Power & energy
Location
Kagoshima, Kagoshima, Japan
Investment
Not disclosed
Scale / capacity
589.84 kW installed capacity; 603,707 kWh/year planned generation
Equipment / vendor
I-Grid Solutions
Completion
Feb 2026
Announced
Aug 3, 2026
Themes
renewable-energy

Figures and schedules are as announced by the company or the public body concerned; plans can change. Amounts that were not disclosed are recorded as not disclosed, never estimated.

Also in Kagoshima3 projects · ¥850.7B disclosedOn the map →

Latest in Power & energyAll Power & energy →

Keiyo Gas launches 2 MW/8 MWh grid-scale battery storage facility in Isesaki

NewPower & energyGunmaCompleted

Keiyo Gas opened its first domestic grid-scale battery storage facility in Isesaki, Gunma, beginning full-scale operation on October 1, 2026. The 2 MW, 8 MWh high-voltage facility is operated by KG BESS LLC and was developed and constructed by Sun Village; Marubeni New Power handles market transactions as aggregator.

Chubu Electric Power starts commercial operation of Noba Solar Power Plant in Hachinohe

Power & energyAomoriCompleted

KC-22 Investment, jointly funded by Chubu Electric Power and Komata Construction, completed construction of the Noba Solar Power Plant in Hachinohe, Aomori, and began commercial operation on October 1, 2026. The plant has 1,990 kW of generating capacity and is expected to produce approximately 3.4 million kWh annually.

Kawada Industries installs 519.68 kW solar PPA system at Yasui Factory

Power & energyToyamaCompleted

Kawada Industries introduced an on-site solar power purchase agreement system at its Yasui Factory in Nanto, Toyama, starting September 1, 2026. The system is expected to generate 526,900 kWh annually, with surplus electricity supplied to three other Kawada facilities in the Toyama area.