JScopeJapan Capex

Screener

1,180 projectsLatest first
1,180
projects
¥16.4T
disclosed capex
665
pre-construction
428
building now
15
sectors
Narrow by phase, size, sector and region — the counts update as you go.1,180 projects
CompanyProjectSectorLocationPhase
2026.08.21ADEKA Corporation4401ADEKA launches new Semiconductor Innovation Center in KukiADEKA has begun full-scale operations at its new Semiconductor Innovation Center within the ADEKA Technology Center Kuki in Saitama. The facility consolidates and expands semiconductor-materials research, with cleanrooms and evaluation equipment for advanced front-end and back-end semiconductor materials.R&D FacilitiesKuki, Saitama¥12BCompleted
2026.08.21ADEKA Corporation4401ADEKA to double photo-acid generator capacity at Chiba plantADEKA will expand production equipment for photo-acid generators used in advanced semiconductor photoresists, including EUV lithography, by adding a manufacturing line inside an existing building at its Chiba plant in Sodegaura. The approximately ¥1 billion investment is scheduled to start construction in January 2027, finish in February 2028, and begin commercial operations in September 2028, doubling capacity from the current level.Materials & ChemicalsSodegaura, Chiba¥1BPlanned
2026.08.21FUJIFILM Business Innovation Corp.Fujifilm Business Innovation begins full-scale operation of Circular Manufacturing Center in the PhilippinesFujifilm Business Innovation began full-scale operation of its Circular Manufacturing Center in Laguna, Philippines, which it opened in July 2025 to refurbish used multifunction printers collected across the Asia-Pacific region. The facility started shipping refurbished ApeosPort-VII C R series machines on July 30 and has an exclusive area of approximately 500 sqm.Other ManufacturingCalamba, Lagunanot disclosedCompleted
2026.08.21FUJIFILM Electronics Materials Co., Ltd.4901Fujifilm completes new advanced semiconductor materials building at Oita plantFujifilm has completed a new building at the Oita plant of Fujifilm Electronics Materials Co., Ltd. and began operations in August 2026. The facility manufactures and tests post-CMP cleaners, adding automated production equipment and quality-evaluation instruments to expand the plant's manufacturing capacity to three times its previous level, supporting growing AI-semiconductor demand.Materials & ChemicalsOita, Oita¥7BCompleted
2026.08.21Electric Power Development Co., Ltd. (J-POWER)9513J-POWER to build GPU data center in Kaminokuni, HokkaidoJ-POWER has decided to develop and operate its first data center, the Kaminokuni Data Center project, in Kaminokuni, Hokkaido. The facility will use GPU-equipped servers, cooling systems and 40-foot containers to sell computing capacity for generative AI development and simulations, with service launch planned for summer 2027.Data CentersKaminokuni, Hokkaidonot disclosedPlanned
2026.08.21MEGMILK SNOW BRAND Co., Ltd.2270Megmilk Snow Brand Vietnam starts operations at new process cheese factoryMegmilk Snow Brand Vietnam, a subsidiary of Japanese dairy company MEGMILK SNOW BRAND Co., Ltd., held an opening ceremony on July 9, 2026, for a newly constructed factory producing processed cheese. The Vietnam manufacturing and sales base is intended to capture growing local demand and support expansion into neighboring Asian markets.Food & BeverageVietnamnot disclosedCompleted
2026.08.21Olympus Corporation7733Olympus completes new B Building at Nagano site for medical-device component productionOlympus has completed the new B Building at its Nagano site in Tatsuno, Nagano, consolidating development and manufacturing functions and establishing a production base for key medical-device components. Construction began in February 2025, with full operation targeted for FY2026; the building has 17,665 sqm of total floor area and a total construction cost of approximately ¥18 billion.Pharma & MedicalTatsuno, Nagano¥18BCompleted
2026.08.21PlantXPlantX completes next-generation indoor plant-factory demonstration facility in TokyoPlantX completed the Shinonome Demonstration Base in Koto, Tokyo, and held its opening ceremony on July 8, 2026. The facility is equipped with the company's latest modular cultivation systems and automated equipment to demonstrate labor-saving and resource-efficient indoor farming technologies ahead of mass production.Food & BeverageKoto, Tokyonot disclosedCompleted
2026.08.21Sakata Seed Corporation1377Sakata Seed Iberica to develop office, warehouse and greenhouse facilities in AndaluciaSakata Seed Iberica S.L., a subsidiary of Japanese seed company Sakata Seed Corporation, plans to develop office, warehouse and greenhouse facilities in Andalucia, Spain. The project has a total planned investment of ¥1.338 billion, with construction scheduled from July 2024 to July 2027.Food & BeverageAndalucia, Spain¥1.3BBuilding
2026.08.21Sakata Seed Corporation1377Sakata Seed to build research facility in KakegawaSakata Seed Corporation plans to develop a research facility in Kakegawa, Shizuoka. The project has a total planned investment of JPY 2.115 billion, with construction starting in February 2026 and completion scheduled for May 2027.R&D FacilitiesKakegawa, Shizuoka¥2.1BBuilding
2026.08.21Yukiguni Factory Co., Ltd.1375Yukiguni Factory to open Kinoko Mirai Lab R&D facility in KawaguchiYukiguni Factory will open the Kinoko Mirai Lab on July 6, 2026, in Kawaguchi, Saitama. The new R&D hub will combine existing mushroom research with research into functional materials and new technologies, supporting collaboration with customers and universities and the creation of new businesses.R&D FacilitiesKawaguchi, Saitamanot disclosedCompleted
2026.08.20Denco Techno Heat Co., Ltd.6706Denco Techno Heat to relocate and build a new Suzuka heat-treatment factoryDenco Techno Heat, a wholly owned subsidiary of DKK Co., Ltd., will relocate its Suzuka factory to a newly acquired site in Kono-cho, Suzuka, Mie. The new facility will use DX, robotics and automated induction-heating equipment to raise production capacity by 30% versus the existing plant, with a planned 244 kW self-consumption solar installation. The factory building is scheduled for completion in March 2027, with all equipment relocation due to finish in January 2028.Materials & ChemicalsSuzuka, Mienot disclosedPlanned
2026.08.20Tokuyama Corporation4043Tokuyama opens new semiconductor polysilicon plant in Ho Chi Minh CityTokuyama held the opening ceremony for a new semiconductor-grade polysilicon plant operated by its wholly owned subsidiary Tokuyama Vietnam in the Phu My 3 Special Industrial Park, Ho Chi Minh City. The facility will crush and wash polysilicon and serve as an overseas supply-chain hub, with trial operations and quality verification to follow.Materials & ChemicalsHo Chi Minh City, Vietnam¥3.5BCompleted
2026.08.19PT Mulya Energi Lestari6092MEL starts commercial operation of 3.4 MW Pungga small hydropower plant in North SumatraPT Mulya Energi Lestari has started commercial operation of its 3.4 MW run-of-river Pungga small hydropower plant in North Sumatra, Indonesia. The facility supplies renewable electricity to Indonesia's state-owned utility PLN under a long-term power purchase agreement and is expected to reduce greenhouse-gas emissions by 8,863 tCO2 annually; EnBio Holdings participates through its jointly managed investment vehicle Alamport Renewables.Power & EnergyNorth Sumatra, Indonesianot disclosedCompleted
2026.08.19Mitsubishi Chemical Corporation4188Mitsubishi Chemical to install ultra-high-purity colloidal silica production equipment in KitakyushuMitsubishi Chemical will commercialize ultra-high-purity colloidal silica for polishing slurries used in advanced semiconductor manufacturing by installing new production equipment at its Kyushu Plant in Kitakyushu, Fukuoka. Commercial operations are scheduled to begin in October 2028, supporting semiconductor materials demand driven by generative AI and data centers.Materials & ChemicalsKitakyushu, Fukuokanot disclosedPlanned
2026.08.19NTT West9432NTT West to build AI-ready data center in FukuokaNTT West will build a next-generation AI-ready data center in Fukuoka, one of two announced together with a second site, to meet rising demand for AI infrastructure and to strengthen connections with overseas networks. No investment amount, capacity or completion date was disclosed.Data CentersFukuoka, Fukuokanot disclosedPlanned
2026.08.19NTT West9432NTT West to build AI-ready data center in OsakaNTT West will build a next-generation AI-ready data center in Osaka, one of two announced together with a second site, to meet rising demand for AI infrastructure and to strengthen connections with overseas networks. No investment amount, capacity or completion date was disclosed.Data CentersOsaka, Osakanot disclosedPlanned
2026.08.19Pasona Group Inc.2168Pasona Group to open permanent offshore art stage on Awaji IslandPasona Group will open the permanent PASONA HARBOR STAGE offshore on Awaji Island, Hyogo, on July 17, 2026. The multipurpose venue will host concerts and events and includes a 550-seat audience area, a 900 sqm viewing area, a 600 sqm stage, and large-scale projection equipment; it will be operated by Nijigennomori.OtherAwaji, Hyogonot disclosedPlanned
2026.08.19TOTO Ltd.5332TOTO to build ceramic R&D facility at Chigasaki plantTOTO will build a new R&D building within its Chigasaki plant in Kanagawa to accelerate development of next-generation electrostatic chucks and AD components for semiconductor manufacturing equipment. The facility will expand prototype production lines and is scheduled to start construction in December 2026 and be completed in April 2028.R&D FacilitiesChigasaki, Kanagawa¥17BPlanned
2026.08.19Yokowo Co., Ltd.6800Yokowo subsidiary opens new automotive antenna anechoic chamber in DongguanYokowo's Chinese subsidiary Dongguan Youhua Communication Parts Co., Ltd. established a new anechoic chamber at the factory site of its affiliated manufacturing company in Dongguan, Guangdong. Test operation began in June 2026, with full operation scheduled for the end of June, enabling local evaluation and analysis of automotive antennas for GNSS, ETC, 4G, 5G and V2X applications.R&D FacilitiesDongguan, Chinanot disclosedCompleted
2026.08.18AGS Corporation3648AGS expands floor space at Saitama iDC data centerAGS is expanding floor space at its Saitama Center data center in Saitama, Japan. The disclosure reports media coverage of the expansion but does not state the investment amount, added capacity, contractor, or schedule.Data CentersSaitama, Saitamanot disclosedPlanned
2026.08.18Hanwa Co., Ltd.8078Hanwa opens Tijuana coil center in Rosarito, Baja CaliforniaHanwa established HANWA STEEL SERVICE TIJUANA, S.A. DE C.V. in Rosarito, Baja California, its second coil centre in Mexico, and began full operations in August 2026. The site covers 38,086 sqm with 9,420 sqm of buildings and cuts and sells thin steel sheet for the Tijuana-Mexicali border region, where manufacturers supplying the United States are concentrated. Coil-centre functions previously run from San Diego Vista Steel Service in the United States transfer to the new operation at the end of August 2026. No investment amount was disclosed.Steel & Non-ferrous MetalsRosarito, Baja California, Mexiconot disclosedCompleted
2026.08.18Local Energy System Co., Ltd.Local Energy System completes Japan's first bark-based black pellet plant in SaijoLocal Energy System, backed by Kumagai Gumi, Kiyomoto Iron Works and Shinsho Corporation, completed a black bark pellet manufacturing plant in Saijo, Ehime. The plant uses bark from sawmills to produce wood pellets and thermally processes them into black bark pellets for power-generation and industrial applications; trial operations will continue through September 2026, with commercial operations planned from October 2026.Power & EnergySaijo, Ehimenot disclosedCompleted
2026.08.18Vital-Net, Inc.3151Vital-Net launches Isehara Logistics Center for contract logisticsVital-Net began contract logistics operations at the Isehara Logistics Center in Isehara, Kanagawa, on August 3, 2026. The 7,706 sqm facility provides GMP/GDP-compliant storage and manufacturing-related logistics for pharmaceuticals, chemicals and precision equipment, with temperature control, backup power and enhanced security.Logistics FacilitiesIsehara, Kanagawanot disclosedCompleted
2026.08.17Arata Corporation2733Arata installs 589.84 kW solar power system at Kyushu South CenterArata installed a self-consumption solar power generation system under a power purchase agreement at its Kyushu South Center logistics facility in Kagoshima. The system began operating in February 2026, with planned annual generation of 603,707 kWh and surplus electricity supplied to the surrounding area as CO2-free power.Power & EnergyKagoshima, Kagoshimanot disclosedCompleted
2026.08.17Dynapac Co., Ltd.3947Dynapac commissions 100 kW rooftop solar system at Toki facilityDynapac installed an owner-operated rooftop solar power system at Toki Dynapac in Toki, Gifu, which began operation on July 10, 2026. The 215-panel system has 100 kW output and is expected to generate approximately 100,000 kWh annually, covering about 4% of the facility's electricity demand.Power & EnergyToki, Gifunot disclosedCompleted
2026.08.17Intellect Co., Ltd.Intellect starts construction of Togusa Solar Power Plant in Kikuyo, KumamotoIntellect is responsible for the design and construction of the Togusa Solar Power Plant in Kikuyo, Kumamoto. A safety prayer ceremony was held on July 3, 2026, marking the start of construction; the project's capacity and investment amount were not disclosed.Power & EnergyKikuyo, Kumamotonot disclosedBuilding
2026.08.17JGC Holdings Corporation1963JGC completes Chugai Pharma's UT3 biopharmaceutical API facility in UtsunomiyaJGC Holdings completed the UT3 biopharmaceutical active pharmaceutical ingredient facility for Chugai Pharmaceutical Industry at its Utsunomiya plant in May 2026. The four-story facility supports clinical-trial manufacturing through initial commercial production and includes continuous-production capabilities, solar panels and other environmental features; it was handed over on May 14, 2026.Pharma & MedicalUtsunomiya, Tochiginot disclosedCompleted
2026.08.17Karitsu Co., Ltd.Karitsu opens Higashi-Hiroshima Logistics CenterKaritsu opened the Higashi-Hiroshima Logistics Center on August 17, 2026, consolidating logistics functions previously dispersed across the Hiroshima area. The center is intended to improve the efficiency of storage, transportation, and logistics administration; no investment amount or facility scale was disclosed.Logistics FacilitiesHigashihiroshima, Hiroshimanot disclosedCompleted
2026.08.17Lion Corporation4912Lion to build new pharmaceutical plant in Hung Yen, VietnamLion has approved construction of a new pharmaceutical plant through its wholly owned Vietnamese subsidiary Merap Lion. The facility will produce prescription and over-the-counter solid-dose medicines, including tablets and granules, with operations planned to begin in the second half of 2030.Pharma & MedicalHung Yen¥1.5BPlanned
2026.08.17Mitsui Kinzoku Co., Ltd.5706Mitsui Kinzoku to establish new copper foil production site in MalaysiaMitsui Kinzoku plans to acquire land near its existing Malaysian plant and establish a new site from 2031 onward to expand production of VSP high-frequency printed-circuit-board copper foil and MicroThin carrier-supported ultra-thin copper foil. The new site is planned to add monthly capacity of 1,200 tonnes of VSP foil and 4 million sqm of MicroThin foil, supporting rising AI, semiconductor and data-center demand.Materials & ChemicalsMalaysianot disclosedPlanned
2026.08.17Okazaki Express Co., Ltd.Okazaki Express to build Tahara Loginet Center logistics facilityOkazaki Express will build the Tahara Loginet Center, its first logistics center in eastern Mikawa, Aichi Prefecture. The facility is intended to strengthen storage and transport operations for automotive-parts customers and is scheduled for completion in 2027.Logistics FacilitiesTahara, Aichinot disclosedPlanned
2026.08.17SAKATA SEED CORPORATION1377Sakata Seed opens Ishigaki Research Farm in OkinawaSakata Seed Corporation opened the Ishigaki Research Farm in Ishigaki, Okinawa, on June 21, 2026. The facility will research vegetable and flower varieties under subtropical conditions, accelerating development of heat- and weather-resistant varieties for tropical markets.R&D FacilitiesIshigaki, Okinawanot disclosedCompleted
2026.08.17Sekisui Chemical Co., Ltd.4204Sekisui Chemical opens laminated-glass interlayer design center in ShanghaiSekisui Chemical opened a design center in Shanghai in July 2026, operated by Sekisui Interlayer (Suzhou) Co., Ltd., to support automotive manufacturers with CMF design, simulations, sample production and prototype evaluation. The center combines the group's laminated-glass interlayer technology with Chinese mobility design trends and is intended to support development from concept through mass-production studies.R&D FacilitiesShanghai, Chinanot disclosedCompleted
2026.08.17Tadano Ltd.6395Tadano Utility starts operations at new Yawata aerial work platform factoryTadano Utility, Tadano's wholly owned subsidiary, began operating its newly built Yawata Factory in Chikuma, Nagano Prefecture, in July 2026. The facility is a new manufacturing base for aerial work platforms.Machinery & RoboticsChikuma, Naganonot disclosedCompleted
2026.08.17Tokyo Tatemono Co., Ltd.8804Tokyo Tatemono completes T-LOGI Sendai multi-tenant logistics facilityTokyo Tatemono completed T-LOGI Sendai in Sendai, Miyagi, on June 26, 2026. The four-story ramp-style logistics facility has 42,269.71 sqm of gross floor area, 40 truck berths and rooftop solar power for on-site consumption and surplus transmission to Tokyo Tatemono Sendai Building.Logistics FacilitiesSendai, Miyaginot disclosedCompleted
2026.08.17Yakult Honsha Co., Ltd.2267Yakult to install solar power generation at Philippines Yakult No. 2 factoryYakult Honsha will introduce solar power generation at its Philippines Yakult No. 2 factory to promote decarbonization. The project is the Yakult Group's first initiative to use Japan's Joint Crediting Mechanism (JCM).Power & EnergyPhilippinesnot disclosedPlanned
2026.08.15Hokkaido Electric Power Company9509Hokkaido Electric Power begins construction of Ishikariwan Shinko Power Station Unit 2Hokkaido Electric Power has filed the construction plan for Unit 2 of the Ishikariwan Shinko Power Station and considers the project started under Japan's Electricity Business Act. Building construction and installation of power-generation equipment will proceed, with commercial operation targeted for fiscal 2030.Power & EnergyIshikari, Hokkaidonot disclosedBuilding
2026.08.15Mitsui Fudosan8801Mitsui Fudosan completes Toyocho 1 lab and starts development of Toyocho 2Mitsui Fudosan completed Mitsui Link Lab Toyocho 1 on July 31, 2026, a leasable wet-lab and office facility in Tokyo's Koto Ward with BSL2-capable specifications and hazardous-material storage. The company also began development of the planned Mitsui Link Lab Toyocho 2, expanding its Kanto-area life-science lab network to 10 sites including planned properties.R&D FacilitiesKoto, Tokyonot disclosedCompleted
2026.08.15Ohishi Sangyo Co., Ltd.3943Ohishi Sangyo starts new molding machine at Ibaraki pulp-mold plantOhishi Sangyo held a start-up ceremony for a new molding machine at its Ibaraki Plant on June 2, 2026. The equipment is intended to strengthen the company's supply system for pulp-mold products and support further business expansion.Paper & PulpIbarakinot disclosedCompleted
2026.08.14Aichi Steel Corporation5482Aichi Steel starts construction of new forging plant at Vardhman Special Steels in IndiaAichi Steel held the groundbreaking ceremony for a new forging plant at partner Vardhman Special Steels in Ludhiana, Punjab, India. The plant will add a hot rolling mill line, with mass production targeted for FY2028; the investment amount was not disclosed.Steel & Non-ferrous MetalsLudhiana, Punjabnot disclosedBuilding
2026.08.14Chubu Nippon PlasticChubu Nippon Plastic adds two tent warehouses at its headquarters factoryChubu Nippon Plastic installed two new tent warehouses at its Kamii-shida factory headquarters site to store materials and products more efficiently. The facilities provide approximately 600 tonnes of combined storage capacity and are intended to reduce internal transport and improve production workflow.Logistics FacilitiesHamamatsu, Shizuokanot disclosedCompleted
2026.08.14CRE, Inc.3458CRE begins construction of LogiSquare Asaka B logistics facilityCRE has started construction of LogiSquare Asaka B, a large-scale logistics facility in Asaka, Saitama. The disclosure confirms a new logistics-capacity project, but the available source text does not provide the investment amount, facility scale, contractor, or completion schedule.Logistics FacilitiesAsaka, Saitamanot disclosedBuilding
2026.08.14Hankyu Hanshin PropertiesHankyu Hanshin Properties completes LogiSTA Kita-Itami logistics facility in Kawanishi, HyogoHankyu Hanshin Properties completed the LogiSTA Kita-Itami logistics facility in Kawanishi, Hyogo, on June 30, 2026. The facility incorporates LED lighting and high-efficiency air conditioning and has received ZEB Ready certification.Logistics FacilitiesKawanishi, Hyogonot disclosedCompleted
2026.08.14Hankyu Hanshin PropertiesHankyu Hanshin Properties completes LogiSTA Kyoto Fushimi logistics facility in KyotoHankyu Hanshin Properties completed the LogiSTA Kyoto Fushimi logistics facility in Fushimi Ward, Kyoto, on July 31, 2026. The facility incorporates LED lighting and high-efficiency air conditioning and has received ZEB Ready certification.Logistics FacilitiesKyoto, Kyotonot disclosedCompleted
2026.08.14Hankyu Hanshin Properties Corp.Hankyu Hanshin Properties to procure power from new solar plants under an off-site corporate PPAHankyu Hanshin Properties will begin using renewable electricity generated by newly developed solar power facilities to supply three properties it operates in Osaka Umeda from late August 2026. The solar plants will be opened progressively, reaching a combined generation capacity of 10 MW by the end of FY2027, with expected annual generation of approximately 19 million kWh.Power & EnergyOsaka, Osakanot disclosedPlanned
2026.08.14HOYA Electronics Singapore Pte. Ltd.7741HOYA Electronics Singapore to rationalize and expand electronics manufacturing equipment in TampinesHOYA Electronics Singapore plans to rationalize and expand its electronics product manufacturing equipment at its Tampines Industrial Crescent facility in Singapore. The project has a total planned investment of JPY 10.89 billion, funded internally; no construction schedule or added capacity was disclosed.Semiconductors & ElectronicsTampines, Singapore¥10.9BPlanned
2026.08.14HOYA Glass Disk Vietnam II Ltd.7741HOYA Glass Disk Vietnam II to rationalize and expand electronics manufacturing equipment in Hung YenHOYA Glass Disk Vietnam II plans to rationalize and expand its electronics product manufacturing equipment at its facility in Hung Yen, Vietnam. The project has a total planned investment of ¥7.631 billion, funded internally; no construction schedule or added capacity is disclosed.Semiconductors & ElectronicsHung Yen, Vietnam¥7.6BPlanned
2026.08.14HOYA Lens Brazil Fabricacao de Artigos Opticos Ltda7741HOYA Lens Brazil to rationalize and expand healthcare product manufacturing equipment in Rio de JaneiroHOYA Lens Brazil plans to rationalize and expand manufacturing equipment for healthcare-related products at its Rio de Janeiro facility. The project is funded internally, with a total planned investment of JPY 1.027 billion; no construction schedule or capacity increase is disclosed.Pharma & MedicalRio de Janeiro, Brazil¥1BPlanned
2026.08.14HOYA Corporation7741HOYA to expand and rationalize medical-product manufacturing facilitiesHOYA plans total investment of ¥2.311 billion in new healthcare-related outlets, relocations and renovations, as well as rationalization and expansion of manufacturing equipment for medical products. The planned projects are located in Nakano and Akishima, Tokyo, and other locations; no construction schedule or capacity increase is disclosed.Pharma & MedicalTokyo¥2.3BPlanned
2026.08.14HOYA Corporation7741HOYA to rationalize and expand electronics manufacturing equipment at three Japanese factoriesHOYA plans a ¥5.695 billion investment to rationalize and expand electronics-related product manufacturing equipment at its Nagasaka, Hachioji, and Akishima factories. The projects are located in Hokuto, Yamanashi, and Hachioji and Akishima, Tokyo; no construction schedule or post-investment capacity is disclosed.Semiconductors & ElectronicsHokuto; Hachioji; Akishima, Yamanashi; Tokyo¥5.7BPlanned
2026.08.14HOYA Inc.7741HOYA to rationalize and expand electronics manufacturing equipment in VientianeHOYALaos Co., Ltd plans to rationalize and expand electronics-product manufacturing equipment at its Vientiane facility in Laos. The project has a planned total investment of ¥8.168 billion, funded internally; no construction schedule or capacity increase is disclosed.Semiconductors & ElectronicsVientiane, Laos¥8.2BPlanned
2026.08.14HOYA Corporation7741HOYA to rationalize and expand healthcare products manufacturing equipment in LamphunHOYA plans to rationalize and expand manufacturing equipment for healthcare-related products at its Lamphun facility in Thailand. The project has a planned total investment of ¥2.704 billion, funded internally; construction timing and added capacity were not disclosed.Pharma & MedicalLamphun, Thailand¥2.7BPlanned
2026.08.14Kansai Electric Power Company9503Kansai Electric Power starts commercial operation at Kotori River Power StationKansai Electric Power started commercial operation of the Kotori River Power Station, a 510kW run-of-river hydro plant in Hida, Gifu, that uses maintained flow from the Shimo-Kotori Dam on the Jinzu River system. Construction began in November 2019; the disclosure does not state the investment amount.Power & EnergyHida, Gifunot disclosedCompleted
2026.08.14Kyowa Industry Co., Ltd.5971Kyowa Industry to build new factory at its Komatsu headquartersKyowa Industry plans to build a new factory at its headquarters site in Komatsu, Ishikawa. The project has a total planned investment of ¥2 billion and is scheduled for completion in October 2027; the disclosure does not specify the production capacity or construction start date.Other ManufacturingKomatsu, Ishikawa¥2BPlanned
2026.08.14Riken Tecnose Corporation4220Riken Tecnose to expand synthetic resin processing capacity in Mie and SaitamaRiken Tecnose plans to invest in synthetic resin processing equipment at its facilities in Kameyama, Mie and Fukaya, Saitama. The project began in November 2024 and is scheduled for completion in March 2027, increasing production capacity by 10%.Materials & ChemicalsFukaya, Saitama¥4BBuilding
2026.08.14Riken Vitamin Co., Ltd.4526Riken Vitamin to build Material Nexus Lab R&D center at Tokyo PlantRiken Vitamin will build the Material Nexus Lab, a new R&D facility for chemical-product additives at its Tokyo Plant in Itabashi, Tokyo. The facility will consolidate R&D functions from the Osaka Plant and subsidiary Kenseido, with completion planned for March 2028 and operations beginning in April 2028.R&D FacilitiesItabashi, Tokyo¥1.6BPlanned
2026.08.14Sato Foods Co., Ltd.2923Sato Foods to build second factory at Seiro for aseptic packaged riceSato Foods is investing approximately ¥8 billion to build its second Seiro Factory in Niigata, an aseptic packaged-rice manufacturing plant. Construction began in February 2025 and is scheduled for completion in December 2026, increasing packaged-rice production capacity by approximately 16%.Food & BeverageSeiro, Niigata¥8BBuilding
2026.08.14Super Tool Co., Ltd.5990Super Tool to invest ¥1.4 billion in manufacturing facilities at Sakai head factorySuper Tool plans a total investment of ¥1.4 billion in manufacturing facilities and equipment at its head factory in Naka Ward, Sakai, Osaka. Construction began in June 2024 and is scheduled for completion in October 2026; no post-investment capacity increase is disclosed.Machinery & RoboticsSakai, Osaka¥1.4BBuilding
2026.08.14T.RAD Co., Ltd.7236T.RAD Nagoya Plant to expand radiator production equipment in HigashiuraT.RAD Nagoya Plant plans to invest JPY 1.582 billion in new production equipment for radiators and related products at its facility in Higashiura, Aichi. Construction began in April 2024 and is scheduled for completion in March 2027; the disclosure does not state the resulting capacity increase.Automotive & TransportHigashiura, Aichi¥1.6BBuilding
2026.08.14T. RAD North America, Inc.7236T. RAD North America to install radiator production equipment in KentuckyT. RAD North America plans to invest ¥3.739 billion in radiator and related production equipment at its Kentucky facility. Construction or installation is scheduled to begin in January 2026 and be completed in December 2026, funded through internal funds and borrowings.Automotive & TransportKentucky¥3.7BPlanned
2026.08.14T.RAD Co., Ltd.7236T.RAD Shiga Manufacturing to expand radiator production equipment in HigashiomiT.RAD Shiga Manufacturing is investing in radiator and related-product production equipment at its facility in Higashiomi, Shiga. The project began in January 2019 and is scheduled for completion in March 2027, funded through internal funds and borrowings.Automotive & TransportHigashiomi, Shiga¥2BBuilding
2026.08.14Tatsuta Electric Wire Co., Ltd.5016Tatsuta Electric Wire expands leakage detection system capacity at Kyoto FactoryTatsuta Electric Wire, a JX Advanced Metals group company, is investing at its Kyoto Factory in Fukuchiyama to expand production capacity for water leakage detection systems used in AI data centers. The project includes additional manufacturing equipment and optimization of the existing building layout and workflow, with full-scale operation scheduled to begin at the end of August 2026.TelecomFukuchiyama, Kyotonot disclosedCompleted
2026.08.14Tokai Rika Co., Ltd.6995Tokai Rika to install HMI parts manufacturing and assembly equipment at Oguchi plantTokai Rika plans to invest ¥8.285 billion in parts manufacturing, assembly and inspection equipment for HMI products and related components at its headquarters plant in Oguchi, Aichi. Construction is scheduled to run from April 2026 through March 2027, funded with internal resources.Automotive & TransportOguchi, Aichi¥8.3BPlanned
2026.08.14Tokai Rika Co., Ltd.6995Tokai Rika to invest ¥1.884 billion in seatbelt and component equipment at Toyota plantTokai Rika plans to invest ¥1.884 billion in manufacturing, assembly, and inspection equipment for seatbelts and related components at its Toyota plant in Aichi. Construction is scheduled from April 2026 through March 2027, funded with internal resources.Automotive & TransportToyota, Aichi¥1.9BPlanned
2026.08.14Tokai Rika Co., Ltd.6995Tokai Rika to invest ¥3.351 billion in manufacturing equipment at Otowa and Hagi plantsTokai Rika plans to invest ¥3.351 billion in manufacturing, assembly and inspection equipment for shift levers, steering wheels and related components at its Otowa and Hagi plants in Toyokawa, Aichi. Construction is scheduled from April 2026 through March 2027, funded internally.Automotive & TransportToyokawa, Aichi¥3.4BPlanned
2026.08.14Toyota Boshoku Corporation3116Toyota Boshoku to build new logistics facility in Toyota, AichiToyota Boshoku plans to establish a new logistics facility in Toyota, Aichi, Japan. The project has a total planned investment of JPY 14.488 billion, with construction scheduled to start in April 2026 and completion planned for May 2028.Logistics FacilitiesToyota, Aichi¥14.5BPlanned
2026.08.14Toyota Boshoku Corporation3116Toyota Boshoku to upgrade equipment for new seat and door-trim products at Toyohashi-Kita PlantToyota Boshoku plans to invest ¥3.018 billion at its Toyohashi-Kita Plant in Toyohashi, Aichi, to support new seat and door-trim products and maintain and renew production equipment. The project is scheduled to run from April 2026 through March 2027 and is funded through internal funds and borrowings.Automotive & TransportToyohashi, Aichi¥3BPlanned
2026.08.14Toyota Boshoku Corporation3116Toyota Boshoku to upgrade Kariya Plant for new air-filter productsToyota Boshoku plans to invest JPY 4.553 billion at its Kariya Plant in Kariya, Aichi, to support new products including air filters and to maintain and renew equipment. The project is scheduled to run from April 2026 through March 2027, with no increase in post-completion capacity disclosed.Automotive & TransportKariya, Aichi¥4.6BPlanned
2026.08.14Toyota Boshoku Corporation3116Toyota Boshoku to upgrade Oguchi Plant for new molded-ceiling productsToyota Boshoku plans to invest ¥2.016 billion at its Oguchi Plant in Oguchi, Aichi, to support new products such as molded ceilings and renew production equipment. Construction is scheduled from April 2026 through March 2027, funded by internal funds and borrowings.Automotive & TransportOguchi, Aichi¥2BPlanned
2026.08.14Toyota Boshoku Corporation3116Toyota Boshoku to upgrade Sanage Plant for new seat and door-trim productsToyota Boshoku plans to invest ¥17.054 billion at its Sanage Plant in Toyota, Aichi, to support new seat and door-trim products and renew existing equipment. Construction is scheduled from April 2026 through March 2027, funded by internal funds and borrowings.Automotive & TransportToyota, Aichi¥17.1BPlanned
2026.08.14Toyota Boshoku Corporation3116Toyota Boshoku to upgrade Toyohashi-Minami plant for new seat and door-trim productsToyota Boshoku plans to invest in equipment at its Toyohashi-Minami Plant in Toyohashi, Aichi, to support new seat and door-trim products and maintain and renew existing facilities. The project is scheduled to run from April 2026 through March 2027 and will be funded through internal funds and borrowings.Automotive & TransportToyohashi, Aichi¥1.5BPlanned
2026.08.14Toyota Kirloskar Motor7203Toyota Kirloskar Motor plans production-equipment investment in BangaloreToyota Kirloskar Motor plans a total investment of ¥128.9 billion in production equipment and related facilities at its Bangalore, India site. The disclosure does not specify the construction schedule or added production capacity.Automotive & TransportBangalore, India¥128.9BPlanned
2026.08.14Toyota Motor Europe7203Toyota Motor Europe plans production equipment investment in BrusselsToyota Motor Europe plans to invest in production equipment at its Brussels, Belgium facility. The securities report lists a total planned investment of ¥107.5 billion, funded with the company's own funds; no construction schedule or capacity increase is disclosed.Automotive & TransportBrussels, Belgium¥107.5BPlanned
2026.08.14Toyota Motor Manufacturing Canada, Inc.7203Toyota Motor Manufacturing Canada to invest in production equipment at Cambridge plantToyota Motor Manufacturing Canada plans to invest in production equipment and related assets at its Cambridge, Ontario facility. The disclosure reports a total planned investment of ¥70.8 billion, funded internally; no construction schedule or capacity increase is provided.Automotive & TransportCambridge, Ontario¥70.8BPlanned
2026.08.14Toyota Motor Corporation7203Toyota plans ¥850 billion investment in production equipment in Toyota CityToyota Motor Corporation plans to invest ¥850 billion in production equipment and related facilities at its operations in Toyota City, Aichi. The securities report does not specify the individual facilities, construction schedule, or added production capacity.Automotive & TransportToyota, Aichi¥850BPlanned
2026.08.14Toyota Motor Manufacturing Kentucky, Inc.7203Toyota to invest ¥260.9 billion in production equipment at Kentucky plantToyota Motor Manufacturing Kentucky plans a ¥260.9 billion investment in production equipment at its Georgetown, Kentucky facility. The disclosure does not specify the equipment type, construction schedule, or additional production capacity.Automotive & TransportGeorgetown, Kentucky¥260.9BPlanned
2026.08.14Toyota Motor Corporation7203Toyota to invest in production equipment at Princeton, Indiana plantToyota Motor Manufacturing Indiana plans a total investment of ¥119.1 billion in production equipment and related assets at its Princeton, Indiana site. The disclosure does not specify the equipment scope, added capacity, or construction schedule.Automotive & TransportPrinceton, United States¥119.1BPlanned
2026.08.14Tsumura & Co.4540Tsumura to build new quality-control facility to support stable supplyTsumura will build a new QC building and hazardous-materials warehouse at its Ibaraki Plant in Ami, Ibaraki, to strengthen quality-testing capacity and business continuity for its kampo pharmaceutical products. Construction costs approximately ¥7 billion, designed and built by Kajima Corporation, with completion planned for mid-April 2028.Pharma & MedicalAmi, Ibaraki¥7BPlanned
2026.08.14T.RAD Co., Ltd.7236T.RAD Hadano Plant to expand radiator production equipmentTyrad Hadano Manufacturing plans a ¥2.672 billion investment in radiator and related-product production equipment at its Hadano, Kanagawa site. Construction began in January 2024 and completion is scheduled for March 2027, funded through internal funds and borrowings.Automotive & TransportHadano, Kanagawa¥2.7BBuilding
2026.08.14Yokohama Reito Co., Ltd.2874Yokohama Reito completes Nagaoka CONNECT refrigerated logistics centerYokohama Reito completed the Nagaoka CONNECT Logistics Center in Nagaoka, Niigata, its first logistics base on Japan's Sea of Japan side and a strategic cold-chain hub for the Joetsu and Shinetsu regions. The three-story facility has 27,272 tonnes of storage capacity and includes automated material-handling systems, natural-refrigerant refrigeration, EV charging and a 173 kWh lithium-ion battery system to strengthen logistics resilience and disaster-response alternatives.Logistics FacilitiesNagaoka, Niigatanot disclosedCompleted
2026.08.13Aisan Industry Co., Ltd.7283Aisan Industry to build IMI plant at its Obu headquarters factoryAisan Industry plans to build the IMI plant at its headquarters factory in Obu, Aichi. The project has a total planned investment of ¥2.106 billion, with construction scheduled from December 2025 to January 2027, funded by internal funds and borrowings.Automotive & TransportObu, Aichi¥2.1BBuilding
2026.08.13Astroscale U.S. Inc.186AAstroscale to develop LEXI-P life-extension service satellite in ColoradoAstroscale U.S. Inc. plans to invest JPY 12.095 billion in the LEXI-P life-extension service satellite at its U.S. headquarters and factory in Colorado. The project began in 2025 and is scheduled for completion in 2028, funded with internal resources.Other ManufacturingColorado¥12.1BBuilding
2026.08.13EA Pharma Co., Ltd.4523EA Pharma to expand manufacturing equipment at Fukushima Facility in ShirakawaEA Pharma plans to invest approximately ¥6.4 billion in manufacturing equipment at its Fukushima Facility in Shirakawa, Fukushima. Construction began in October 2025 and is scheduled for completion in March 2029, funded through internal resources.Pharma & MedicalShirakawa, Fukushima¥6.4BPlanned
2026.08.13Eisai Manufacturing Ltd.4523Eisai Manufacturing to install manufacturing equipment at European Knowledge Centre in HertfordshireEisai Manufacturing Ltd. plans to install manufacturing equipment at its European Knowledge Centre in Hertfordshire, United Kingdom. The investment is expected to total approximately GBP 50 million, with work scheduled from November 2025 through March 2030.Pharma & MedicalHertfordshire, United KingdomGBP 50MPlanned
2026.08.13Infini VAN, Inc.4390Infini VAN to build an international submarine cable landing station in Taguig, PhilippinesInfini VAN, Inc. plans to construct a submarine cable landing station in Taguig, Philippines, to expand the international communications capacity it can provide in the country. The project is scheduled to start in July 2025 and be completed in December 2026, with total planned investment of ¥3 billion.TelecomTaguig, Philippines¥3BBuilding
2026.08.13Infini VAN, Inc.4390Infini VAN to strengthen Philippine nationwide backbone networkInfini VAN, Inc. plans to invest JPY 2.5 billion to strengthen its backbone communications network across the Philippines, with work scheduled during FY2026. The project is funded through internal funds and loans from its parent company, IPS.TelecomTaguig, Philippines¥2.5BPlanned
2026.08.13IPS Co., Ltd.4390IPS to jointly build Candle international submarine cableIPS plans to jointly build the Candle international submarine cable to expand its capacity to provide international communications circuits. The project is funded through internal funds and bank borrowing, with construction underway from 2025 and completion scheduled during 2028.TelecomChuo, Tokyo¥19BBuilding
2026.08.13Sekisui Chemical Co., Ltd.4204Sekisui Chemical to install semiconductor production equipment at Musashi PlantSekisui Chemical plans to invest JPY 3.158 billion in new semiconductor product production equipment at its Musashi Plant in Hasuda, Saitama. Construction started in February 2024 and is scheduled for completion in September 2029, funded by internal funds and borrowings.Semiconductors & ElectronicsHasuda, Saitama¥3.2BBuilding
2026.08.13Sekisui Diagnostics (UK) Ltd.4204Sekisui Diagnostics to expand pharmaceutical manufacturing equipment at Kent headquarters plantSekisui Diagnostics (UK) Ltd. is investing JPY 2.638 billion in pharmaceutical manufacturing equipment at its headquarters plant in Kent, United Kingdom. Construction began in July 2020 and completion is scheduled for October 2027; no post-completion capacity increase is disclosed.Pharma & MedicalKent, United Kingdom¥2.6BBuilding
2026.08.13Sekisui Medical Co., Ltd.4204Sekisui Medical to build clinical trial drug manufacturing building at Iwate PlantSekisui Medical plans to construct a clinical trial drug building at its Iwate Plant in Hachimantai, Iwate. The project has a total planned investment of ¥3.942 billion, with construction scheduled from September 2025 to June 2028 and funded through internal funds and borrowings.Pharma & MedicalHachimantai, Iwate¥3.9BPlanned
2026.08.13Sekisui Medical Co., Ltd.4204Sekisui Medical to install pharmaceutical production equipment at Iwate PlantSekisui Medical plans to install pharmaceutical manufacturing equipment at its Iwate Plant in Hachimantai, Iwate. The project has a total planned investment of ¥3.574 billion, with work scheduled from October 2025 to September 2028 and funded through internal funds and borrowings. It is separate from the clinical trial drug building the company is putting up at the same plant.Pharma & MedicalHachimantai, Iwate¥3.6BPlanned
2026.08.13Sekisui Chemical Co., Ltd.4204Sekisui Polymatech to build a new office and development building at Musashi PlantSekisui Chemical plans a ¥3.12 billion new office and development building for its subsidiary Sekisui Polymatech at the Musashi Plant in Hasuda, Saitama. Construction is scheduled from January 2025 to September 2027, funded through internal funds and borrowings.R&D FacilitiesHasuda, Saitama¥3.1BBuilding
2026.08.13Sekisui S-Lec (Thailand) Co., Ltd.4204Sekisui S-Lec to install intermediate-film production equipment at Rayong plantSekisui S-Lec (Thailand) Co., Ltd., a subsidiary of Japanese listed company Sekisui Chemical, plans to install intermediate-film production equipment at its head plant in Rayong, Thailand. The project has a total planned investment of ¥8.5 billion, with construction starting in May 2024 and scheduled for completion in September 2027.Materials & ChemicalsRayong, Thailand¥8.5BBuilding
2026.08.13Sekisui Chemical Co., Ltd.4204Sekisui Solar Film to build perovskite solar cell manufacturing facility at Sakai PlantSekisui Solar Film plans to install perovskite solar cell manufacturing equipment at its Sakai Plant in Sakai, Osaka. The project has a total planned investment of ¥90 billion, with construction scheduled from January 2025 through March 2028 and funding from internal funds, subsidies and borrowings.Power & EnergySakai, Osaka¥90BBuilding
2026.08.13Sekisui Specialty Chemicals America, LLC.4204Sekisui Specialty Chemicals America to expand PVA production equipment at Pasadena plantSekisui Specialty Chemicals America plans to invest ¥2.838 billion in PVA production equipment at its Pasadena plant in Texas, United States. Construction began in December 2025 and is scheduled for completion in December 2027; the disclosure does not state the resulting capacity increase.Materials & ChemicalsPasadena, Texas¥2.8BBuilding
2026.08.12ACHILLESUSA,INC.5142AchillesUSA to expand film-manufacturing capacity at Washington State plantAchillesUSA, Inc. plans to install film-manufacturing equipment at its headquarters factory in Washington State, expanding production capacity. Construction began in August 2023 and completion is scheduled for June 2026; the investment is funded by internal funds and borrowings.Materials & ChemicalsWashingtonnot disclosedBuilding
2026.08.12Ahresty India Private Limited5852Ahresty India to install die-casting production equipment in HaryanaAhresty India Private Limited plans to invest JPY 1.23 billion in die-casting production equipment and related facilities in Haryana, India. Construction is scheduled from April 2026 through March 2027, funded by internal resources and borrowings.Automotive & TransportHaryana¥1.2BPlanned
2026.08.12Ahresty Corporation5852Ahresty to install die-casting production equipment in Zacatecas, MexicoAhresty Mexicana S.A. de C.V., a subsidiary of Japan's Ahresty Corporation, plans to invest ¥1.52 billion in die-casting production equipment and related assets in Zacatecas, Mexico. Construction or installation is scheduled to begin in January 2026 and be completed in December 2027; the disclosure does not specify the resulting capacity increase.Automotive & TransportZacatecas¥1.5BPlanned
2026.08.12Ahresty Wilmington Corp.5852Ahresty Wilmington to install new die-casting production equipment in OhioAhresty Wilmington Corp. plans to invest in die-casting production equipment and related facilities at its Ohio site in the United States. The project is scheduled to begin in April 2026 and be completed by March 2027, funded through internal funds and borrowings.Automotive & TransportOhio¥1BPlanned
2026.08.12Aichi Steel Corporation5482Aichi Steel plans electrical and rolling equipment investment at Chita WorksAichi Steel plans new electrical and rolling equipment and related facilities at its Chita Works in Tokai, Aichi, with total planned investment of JPY 11.623 billion. Construction is scheduled to run from March 2022 to March 2030.Steel & Non-ferrous MetalsTokai, Aichi¥11.6BBuilding
2026.08.12Aichi Steel Corporation5482Aichi Steel plans forging equipment investment at Tokai forging plantAichi Steel plans new forged-product manufacturing equipment and related facilities at its forging plant in Tokai, Aichi, under its Forge Company segment, with total planned investment of JPY 6.859 billion. Construction is scheduled to run from December 2023 to March 2030.Steel & Non-ferrous MetalsTokai, Aichi¥6.9BBuilding
2026.08.12Aichi Steel Corporation5482Aichi Steel plans new rolling equipment at Kariya plantAichi Steel plans to install rolling equipment and other facilities at its Kariya plant in Aichi, supporting its Stainless Steel Company segment, with total planned investment of JPY 1.278 billion. Construction is scheduled to run from July 2024 to October 2028.Steel & Non-ferrous MetalsKariya, Aichi¥1.3BBuilding
2026.08.12Aichi Tokei Denki Co., Ltd.7723Aichi Tokei Denki to renew its head office factory in NagoyaAichi Tokei Denki plans to renew its head office factory in Atsuta Ward, Nagoya, to support its measuring-instrument business. The project is scheduled to start in March 2027 and be completed in FY2028, with total planned investment of JPY 7.78 billion.Other ManufacturingNagoya, Aichi¥7.8BPlanned
2026.08.12Alps Alpine North America, Inc.6770Alps Alpine North America to install manufacturing and R&D equipment in Santa ClaraAlps Alpine North America plans to invest ¥5.957 billion in manufacturing and R&D equipment at its headquarters and other facilities in Santa Clara, California. The investment is scheduled to begin in April 2026 and be completed by March 2027, funded internally.Semiconductors & ElectronicsSanta Clara, United States¥6BPlanned
2026.08.12Alps Alpine Co., Ltd.6770Alps Alpine to install manufacturing equipment at Ningbo headquarters factoryNINGBO ALPSELECTRONICS CO., LTD. plans a ¥5.483 billion investment in manufacturing equipment at its headquarters factory in Ningbo, Zhejiang, China. Construction or installation is scheduled to run from April 2026 through March 2027 and will be funded internally; no post-investment capacity increase is disclosed.Semiconductors & ElectronicsNingbo, Zhejiang¥5.5BPlanned
2026.08.12Arata Corporation2733Arata plans new Kansai logistics centerArata plans to develop a new logistics center in the Kansai region, with total planned investment of JPY 10 billion. The facility is scheduled for completion in fiscal 2028; the specific prefecture and construction start date have not been disclosed.Logistics FacilitiesKansai region¥10BPlanned
2026.08.12AS ONE Corporation7476AS ONE to expand rental and calibration center in OsakaAS ONE is investing ¥2.838 billion to establish a storage facility and calibration equipment at its Rental & Calibration Center in Konohana Ward, Osaka. Construction began in June 2025 and is scheduled for completion in November 2026, increasing rental-equipment holding capacity by 230%.Logistics FacilitiesOsaka, Osaka¥2.8BBuilding
2026.08.12Aseed Brew Co., Ltd.9959Aseed Brew to build beverage plant and soft-pouch production line in HigashihiroshimaAseed Brew is investing JPY 3.629 billion in a beverage manufacturing plant and soft-pouch beverage production line at its Higashihiroshima Beverage Factory. Construction began in January 2026 and is scheduled for completion in December 2026, funded through internal resources and borrowings.Food & BeverageHigashihiroshima, Hiroshima¥3.6BBuilding
2026.08.12ASTI Electronics India Private Limited6899ASTI Electronics India to build automotive wiring harness factory in HaryanaASTI Electronics India Private Limited is building a factory in Haryana, India, to produce automotive electrical wiring harnesses. The project has a total planned investment of ¥1.354 billion, with construction started in February 2025 and completion scheduled for July 2026.Automotive & TransportHaryana¥1.4BBuilding
2026.08.12Autocare Services Pty Ltd9268Autocare Services to invest in road-transport vehicles in Victoria, AustraliaAutocare Services plans to invest JPY 2.1 billion in road-transport vehicles and related assets for its logistics operations in Victoria, Australia. The investment is scheduled to begin in April 2026 and be completed by March 2027.Logistics FacilitiesVictoria¥2.1BPlanned
2026.08.12Bourbon Corporation2208Bourbon to install confectionery production equipment at Niigata FactoryBourbon plans to invest in confectionery manufacturing equipment at its Niigata Factory in Nishikan Ward, Niigata City. The project started in November 2025 and is scheduled for completion in July 2026, with total planned investment of ¥1.296 billion.Food & BeverageNiigata, Niigata¥1.3BBuilding
2026.08.12Chi-Vai International Port Co., Ltd.5440Chi-Vai International Port to develop port facilities in Ho Chi Minh CityChi-Vai International Port plans to invest JPY 5.429 billion in port facilities in Ho Chi Minh City, Vietnam. Construction began in February 2022 and completion is scheduled for January 2028; no additional capacity is disclosed.Logistics FacilitiesHo Chi Minh City, Vietnam¥5.4BBuilding
2026.08.12Chubu Steel Plate Co., Ltd.5461Chubu Steel Plate to install an electric arc furnace at its Nagoya plantChubu Steel Plate plans to install an electric arc furnace and related works at its headquarters and plant in Nakagawa Ward, Nagoya. The project is scheduled to be completed in March 2027 and is intended to reduce the furnace's electricity consumption per unit of output.Steel & Non-ferrous MetalsNagoya, Aichi¥9.5BBuilding
2026.08.12CKD Corporation6407CKD to build production plant in Malaysia's Kedah StateCKD's Malaysian subsidiary plans to build a production plant in Kedah State to meet growing demand in the Asian region. Construction is scheduled to start in July 2026 and finish in March 2027, funded with internal resources.Machinery & RoboticsMalaysia¥1.2BPlanned
2026.08.12D.F. Stauffer Biscuit Co., Inc.2269D.F. Stauffer Biscuit Co. to install confectionery production equipment in PennsylvaniaD.F. Stauffer Biscuit Co. plans to invest ¥10.328 billion in confectionery production equipment at its Pennsylvania, United States site. Construction is scheduled to begin in August 2026 and be completed in June 2028, funded through internal funds and borrowings.Food & BeveragePennsylvania¥10.3BPlanned
2026.08.12Daido Metal Co., Ltd.7245Daido Metal Czech to build wind-turbine bearing manufacturing facility in BrnoDaido Metal Czech s.r.o., a subsidiary of Daido Metal Co., Ltd., is investing in a factory building and manufacturing equipment for wind-turbine bearings in Brno, Czech Republic. The project has a total planned investment of ¥5.824 billion, began in August 2022, and is scheduled for completion in January 2027.Materials & ChemicalsBrno, Czech Republic¥5.8BBuilding
2026.08.12Daiichi Sankyo Europe GmbH4568Daiichi Sankyo Europe to install manufacturing equipment at Pfaffenhofen plantDaiichi Sankyo Europe GmbH, a subsidiary of Japanese pharmaceutical company Daiichi Sankyo, plans to install manufacturing equipment at its Pfaffenhofen plant in Bavaria, Germany. The total planned investment is ¥43.575 billion, with work scheduled from July 2023 through March 2027.Pharma & MedicalPfaffenhofen, Bavaria¥43.6BBuilding
2026.08.12Daiichi Sankyo Europe GmbH4568Daiichi Sankyo Europe to install new manufacturing equipment at Pfaffenhofen plantDaiichi Sankyo Europe GmbH plans to install new pharmaceutical manufacturing equipment at its Pfaffenhofen plant in Bavaria, Germany. The project has a total planned investment of ¥92.82 billion, with construction running from June 2024 through December 2028 and capacity increasing after completion.Pharma & MedicalPfaffenhofen, Bavaria¥92.8BPlanned
2026.08.12Daiichi Sankyo Europe GmbH4568Daiichi Sankyo Europe to install pharmaceutical manufacturing equipment at Pfaffenhofen plantDaiichi Sankyo Europe GmbH plans a 31.368 billion yen investment in new manufacturing equipment at its Pfaffenhofen plant in Bavaria, Germany. Construction began in June 2021 and completion is scheduled for November 2026; the disclosure states that capacity will increase after completion but does not quantify the increase.Pharma & MedicalPfaffenhofen, Bavaria¥31.4BBuilding
2026.08.12Daiichi Sankyo4568Daiichi Sankyo to expand manufacturing equipment at Alphaville plant in Sao Paulo, BrazilDaiichi Sankyo Brazil Ltda. plans to expand manufacturing equipment at its Alphaville plant in Sao Paulo, Brazil. The project has a total planned investment of ¥10.512 billion, with construction scheduled from June 2023 through April 2027; production capacity will be expanded after completion.Pharma & MedicalSao Paulo, Brazil¥10.5BBuilding
2026.08.12Daiichi Sankyo Company, Limited4568Daiichi Sankyo to expand manufacturing equipment at American Regent's New Albany plantDaiichi Sankyo plans to invest in expanded pharmaceutical manufacturing equipment at its American Regent facility in New Albany, Ohio. The project began in April 2024 and is scheduled for completion in October 2027, with funding from internal resources.Pharma & MedicalNew Albany, United States¥59.7BBuilding
2026.08.12Daiichi Sankyo4568Daiichi Sankyo to install new manufacturing equipment at Shanghai plantDaiichi Sankyo plans to invest JPY 27.189 billion in new manufacturing equipment at its Shanghai plant in China. Construction began in July 2024, with completion scheduled for May 2030; the disclosure identifies the post-completion increase in capacity as new capacity.Pharma & MedicalShanghai, China¥27.2BBuilding
2026.08.12DALIAN ALPS ELECTRONICS CO., LTD.6770Dalian Alps Electronics to install manufacturing equipment at Dalian headquarters factoryDALIAN ALPS ELECTRONICS CO., LTD. plans to invest JPY 1.984 billion in manufacturing equipment at its headquarters factory in Dalian, Liaoning, China. Construction or installation is scheduled to run from April 2026 through March 2027, funded internally; no capacity increase is disclosed.Semiconductors & ElectronicsDalian, Liaoning¥2BPlanned
2026.08.12Datasection Inc.3905Datasection plans data center facilities in AustraliaData Section Inc. plans to invest JPY 97 billion in data center facilities and equipment in Australia. Construction is scheduled to start in March 2026 and be completed in August 2026, funded by cash on hand and borrowings.Data CentersAustralia¥97BPlanned
2026.08.12Datasection Inc.3905Datasection to develop data center facilities and equipment in ThailandData Section plans to invest in data center facilities and related equipment in Thailand as part of its overseas business. The project is scheduled to start in March 2026 and be completed in August 2026, funded through cash on hand and borrowings.Data CentersThailand¥48BPlanned
2026.08.12Datasection Inc.3905Datasection to develop data center facilities in ChibaData Section plans to invest JPY 65 billion in data center facilities and related equipment in Chiba, Japan. Construction began in July 2025 and completion is scheduled for August 2026; the filing does not disclose the resulting capacity.Data CentersChiba¥65BBuilding
2026.08.12Datasection Inc.3905Datasection to develop large-scale GPU cluster infrastructure for AI applicationsData Section plans a ¥1.5 billion investment in a large-scale GPU cluster and related operational optimization algorithms for its domestic business. The project began in August 2024 and is scheduled for completion in December 2026; no additional capacity is disclosed.Data CentersShinagawa, Tokyo¥1.5BBuilding
2026.08.12DISCO Corporation6146DISCO to expand precision processing equipment and tool production capacity at Gohara PlantDISCO plans a ¥35.9 billion investment to install production equipment for precision processing systems and precision processing tools at its Gohara Plant in Kure, Hiroshima. Construction began in February 2026, with completion scheduled for April 2028; the project will be funded internally.Machinery & RoboticsKure, Hiroshima¥35.9BBuilding
2026.08.12DISCO Corporation6146DISCO to expand R&D facilities at Haneda R&D CenterDISCO plans a ¥12.8 billion investment in R&D and related equipment at its Haneda R&D Center in Ota, Tokyo. Construction began in September 2025 and completion is scheduled for December 2027, funded internally.R&D FacilitiesOta, Tokyo¥12.8BBuilding
2026.08.12Eagle Industry France S.A.S.6486Eagle Industry France to install production equipment in FranceEagle Industry France S.A.S., a subsidiary of Eagle Industry Co., Ltd., plans to invest JPY 1.09 billion in production equipment in France for its automotive and construction machinery business. The investment is scheduled from April 2026 through March 2027 and will be funded through internal resources and borrowings; no capacity increase is disclosed.Automotive & TransportFrance¥1.1BPlanned
2026.08.12EKK Eagle (Thailand) Co., Ltd.6486EKK Eagle (Thailand) to invest in production equipment in ThailandEKK Eagle (Thailand) plans to invest ¥1.064 billion in production equipment and other assets in Thailand for its automotive and construction machinery business. Construction is scheduled from April 2026 through March 2027, funded by internal funds and borrowings; no post-investment capacity increase is disclosed.Automotive & TransportThailand¥1.1BPlanned
2026.08.12EREX Tuyen Quang Biomass Power Co., Ltd.9517EREX to build 50 MW biomass power plant in Tuyen Quang, VietnamEREX Tuyen Quang Biomass Power Co., Ltd. is developing a biomass power plant at the Xuan Van Industrial Cluster in Tuyen Quang Province, Vietnam. The project has a total planned investment of ¥19.268 billion and is scheduled for completion in FY2027, adding 50 MW of generation capacity.Power & EnergyTuyen Quang, Vietnam¥19.3BBuilding
2026.08.12EREXYENBAIBIOMASSPOWERCO.,LTD.9517EREXYEN Biomass Power to build 50 MW biomass power plant in Lao CaiEREXYENBAIBIOMASSPOWERCO.,LTD. is developing a biomass power plant at the Bac Van Yen Industrial Cluster in Dong Cuong Commune, Lao Cai Province, Vietnam. The project has a total planned investment of ¥19.268 billion and is scheduled for completion in FY2027, adding 50 MW of generation capacity.Power & EnergyDong Cuong Commune, Lao Cai¥19.3BBuilding
2026.08.12F&P America Manufacturing, Inc.7212F&P America Manufacturing to expand automotive parts equipment in OhioF&P America Manufacturing plans to invest in automotive parts-related equipment at its Ohio, United States facility. The ¥4.233 billion project will start in April 2026 and is scheduled for completion in March 2027, supporting equipment expansion for new model launches.Automotive & TransportUnited States¥4.2BPlanned
2026.08.12F&P Manufacturing, Inc.7212F&P Manufacturing to expand automotive parts equipment in Ontario, CanadaF&P Manufacturing plans to invest JPY 1.552 billion in automotive-parts-related equipment at its Ontario, Canada facility. The investment will support the launch of new vehicle models and is scheduled for completion in March 2027.Automotive & TransportOntario¥1.6BPlanned
2026.08.12FCTI, Inc.8410FCTI to deploy ATMs and related equipment in Texas and other U.S. locationsFCTI, Inc., a subsidiary of Seven Bank, plans an investment in ATMs and related equipment in Texas and other locations in the United States. The project is scheduled to start in July 2025 and be completed in December 2026, funded through internal resources and borrowings.OtherUnited States¥7.1BPlanned
2026.08.12Feed One Co., Ltd.2060Feed One to build new Toyokawa feed plant in AichiFeed One plans to build the Toyokawa Plant, a new feed manufacturing facility including land, in Toyokawa, Aichi. The project will expand production capacity for the company's aquaculture feed business, with construction scheduled from October 2025 to April 2028.Food & BeverageToyokawa, Aichi¥13BBuilding
2026.08.12Foster Electric (Bac Ninh) Co., Ltd.6794Foster Electric (Bac Ninh) to install production equipment in VietnamFoster Electric (Bac Ninh) plans to invest JPY 1.272 billion in production equipment at its Bac Ninh facility in Vietnam. Construction or installation is scheduled from April 2026 through March 2027; no post-completion capacity increase is disclosed.Other ManufacturingBac Ninh, Vietnam¥1.3BPlanned
2026.08.12Foster Electric Company, Limited6794Foster Electric (Da Nang) to install production equipment in Da Nang, VietnamFoster Electric (Da Nang) Co., Ltd. plans to install production equipment at its Da Nang site for its speaker and mobile audio businesses. The project has a total planned investment of ¥1.084 billion, with work scheduled from April 2026 through March 2027.Semiconductors & ElectronicsDa Nang, Vietnam¥1.1BPlanned
2026.08.12Foster Electric Company, Limited6794Foster Electric to install production equipment at Illinois siteFoster Electric (U.S.A.), Inc. plans a ¥1.41 billion investment in production equipment at its Illinois, United States facility for its speaker business. Installation is scheduled to begin in April 2026 and finish in March 2027; no capacity increase is disclosed.Semiconductors & ElectronicsIllinois¥1.4BPlanned
2026.08.12Fuji Seal International7864Fuji Seal International to install production equipment at Tendo plantFuji Seal International plans to invest ¥12.5 billion in production equipment and related facilities at its Tendo plant. Construction began in December 2023 and completion is scheduled for June 2026; the disclosure does not state the resulting capacity increase.Other ManufacturingTendo, Yamagata¥12.5BBuilding
2026.08.12Fuji Seal International, Inc.7864Fuji Seal International to install shrink-label production equipment in OsakaFuji Seal International plans to invest in shrink-label production equipment and related facilities at its site in Yodogawa Ward, Osaka. The project is scheduled to begin in April 2026 and be completed by March 2027, with a total planned investment of JPY 1.721 billion.Materials & ChemicalsOsaka, Osaka¥1.7BPlanned
2026.08.12Fuji Seal Packaging (Thailand) Co., Ltd.7864Fuji Seal Packaging (Thailand) to build new factory in Samut PrakanFuji Seal Packaging (Thailand) Co., Ltd. plans to build a new factory and install production equipment in Samut Prakan, Thailand. The project has a total planned investment of ¥7.338 billion, with construction scheduled from June 2025 to August 2027 and funded through internal resources and borrowings.Paper & PulpSamut Prakan¥7.3BBuilding
2026.08.12Fukoku Co., Ltd.5185Fukoku to build manufacturing facility in Virginia, United StatesFukoku plans to invest ¥2.757 billion in land, a factory building and production equipment for FKC America Inc. in Virginia, United States. Construction is scheduled to start in January 2026 and be completed in March 2027, funded through internal resources and borrowings.Automotive & TransportVirginia¥2.8BPlanned
2026.08.12Fukushima Galilei Co., Ltd.6420Fukushima Galilei to expand manufacturing facilities at Shiga PlantFukushima Galilei plans a ¥10 billion investment to expand manufacturing facilities at its Shiga Plant in Konan, increasing production capacity by 30%. Construction began in October 2024 and is scheduled for completion in December 2026.Other ManufacturingKonan, Shiga¥10BBuilding
2026.08.12Fukuvi Chemical Industry Co., Ltd.7871Fukuvi Okayama to install phenolic foam insulation board production equipment in OkayamaFukuvi Okayama plans to invest ¥1.391 billion in phenolic foam insulation board manufacturing equipment at its Okayama facility. Construction is scheduled to run from April 2026 through March 2027, with production capacity increased and maintained through the renewal project.Materials & ChemicalsOkayama, Okayama¥1.4BPlanned
2026.08.12G-Tekt Corporation5970G-Tekt to expand automotive-parts production equipment in Sao Paulo stateG-Tekt plans to invest JPY 1.936 billion in automotive-parts manufacturing equipment at its Brazilian subsidiary in Sao Paulo state. Construction began in June 2025 and is scheduled for completion in February 2027, with production capacity expected to increase.Automotive & TransportSao Paulo State¥1.9BBuilding
2026.08.12G-TEKT Europe Manufacturing Ltd.5970G-TEKT to install automotive-parts manufacturing equipment at its Gloucestershire facilityG-TEKT Europe Manufacturing Ltd. plans to install automotive-parts manufacturing equipment in Gloucestershire, United Kingdom, to support production of a new vehicle model. The project has a total planned investment of ¥3.459 billion, with work scheduled from May 2024 through December 2026.Automotive & TransportGloucestershire¥3.5BBuilding
2026.08.12G-Tekt Corporation5970G-Tekt to install automotive parts production equipment in Sao Paulo StateG-Tekt plans to invest in automotive parts manufacturing equipment at its Brazilian subsidiary G-KT do Brasil Ltda. in Sao Paulo State. The project will support production for new vehicle models, with construction or installation scheduled from February 2026 through March 2027.Automotive & TransportSao Paulo State¥1.2BPlanned
2026.08.12Guangzhou Nansha Auto Parts Alliance (China) Ltd.5970Guangzhou Nansha Auto Parts Alliance to install auto-parts production equipment in GuangzhouGuangzhou Nansha Auto Parts Alliance (China) Ltd. plans to install equipment for manufacturing automotive parts in Guangzhou, Guangdong, China. The project is scheduled to start in May 2025 and be completed in January 2027, adding production equipment for new vehicle models.Automotive & TransportGuangzhou, Guangdong¥2.2BBuilding
2026.08.12Gun Ei Chemical Industry Co., Ltd.4229Gun Ei Chemical Industry to install synthetic resin production equipment at Gunma PlantGun Ei Chemical Industry plans a ¥3.251 billion investment in synthetic resin production equipment at its Gunma Plant in Takasaki. Construction began in August 2024 and is scheduled for completion in February 2027, funded internally.Materials & ChemicalsTakasaki, Gunma¥3.3BBuilding
2026.08.12Hamakyorex Co., Ltd.9037Hamakyorex to build Narita logistics center in ChibaHamakyorex subsidiary Logi-Rex plans to build the Narita Center logistics facility in Narita, Chiba, with a total planned investment of ¥4 billion. Construction is scheduled to start in December 2026 and finish in March 2028, adding 12,018 sqm of capacity.Logistics FacilitiesNarita, Chiba¥4BPlanned
2026.08.12Hamakyorex Co., Ltd.9037Hamakyorex to build new Komaki logistics branch facilityHamakyorex plans to invest ¥3.4 billion in a new building for the Komaki Branch of subsidiary Kintetsu Rex in Komaki, Aichi. Construction is scheduled to begin in April 2026 and finish in November 2028, adding 18,278 sqm of floor area for its freight trucking operations.Logistics FacilitiesKomaki, Aichi¥3.4BPlanned
2026.08.12HaTay Pharmaceutical Joint Stock Company4886HaTay Pharmaceutical to renew manufacturing equipment at Hanoi headquarters and factoryHaTay Pharmaceutical Joint Stock Company plans to invest JPY 4.992 billion in manufacturing equipment and related assets at its headquarters and factory in Hanoi, Vietnam. The project is scheduled to start in January 2026 and be completed in December 2026; the disclosure describes the post-investment capacity increase as renewal and other improvements.Pharma & MedicalHanoi, Vietnam¥5BBuilding
2026.08.12Hirose Electric6806Hirose Electric to expand assembly and component manufacturing equipment in Gyeonggi-do, South KoreaHirose Korea plans to invest JPY 5.825 billion in assembly and component manufacturing equipment and molds in Gyeonggi-do, South Korea. Construction is scheduled from April 2026 through March 2027, with no post-completion capacity increase disclosed.Semiconductors & ElectronicsGyeonggi-do¥5.8BPlanned
2026.08.12Hirose Electric Co., Ltd.6806Hirose Korea to expand factory in South Korea's Gyeonggi ProvinceHirose Korea, a subsidiary of Japanese connector manufacturer Hirose Electric, plans to expand its factory in Gyeonggi Province, South Korea. The project has a total planned investment of ¥2.462 billion, with construction scheduled from October 2025 to November 2027.Semiconductors & ElectronicsGyeonggi Province¥2.5BBuilding
2026.08.12House Foods Group Inc.2810House Foods Indonesia to install curry production equipment in Bekasi, West JavaPT. House Foods Indonesia plans to invest JPY 3.238 billion in curry production equipment and related facilities at its headquarters and other sites in Bekasi Regency, West Java, Indonesia. Construction began in July 2025 and is scheduled for completion in December 2026, funded by contributions from the parent company and consolidated subsidiaries.Food & BeverageBekasi, West Java¥3.2BBuilding
2026.08.12Ibiden Electronics Malaysia Sdn. Bhd.4062Ibiden Electronics Malaysia to install production equipment at Penang factoryIbiden Electronics Malaysia, a subsidiary of Japanese electronics manufacturer Ibiden, plans to invest in production equipment at its Malaysia factory in Penang. The project is scheduled to begin in February 2026 and be completed in June 2029, with a total planned investment of JPY 122.7 billion; no capacity increase is disclosed.Semiconductors & ElectronicsPenang, Malaysia¥122.7BPlanned
2026.08.12Ichinen Chemicals Co., Ltd.9619Ichinen Chemicals to install production equipment in KogaIchinen Chemicals plans production equipment investment at its facility in Koga, Ibaraki. The project started in June 2024 and is scheduled for completion in October 2027, with planned investment of ¥7.374 billion funded through internal funds and borrowings.Materials & ChemicalsKoga, Ibaraki¥7.4BBuilding
2026.08.12IDEC Corporation6652IDEC to invest in its California headquarters and factoryIDEC plans to invest in buildings and related assets at the headquarters and factory of its U.S. subsidiary IDEC CORPORATION in California. The filing discloses a total planned investment of ¥1.6 billion, but does not provide a construction schedule or capacity increase.Other ManufacturingUnited States¥1.6BPlanned
2026.08.12Imuraya Co., Ltd.2209Imuraya to upgrade confectionery and frozen dessert production equipment in TsuImuraya Co., Ltd., a consolidated subsidiary of Imuraya Group, plans to invest in confectionery, food and frozen dessert manufacturing equipment at its facilities in Tsu, Mie. The project is intended to improve productivity, increase production capacity and enhance the working environment, with construction scheduled from April 2026 through March 2027.Food & BeverageTsu, Mie¥1.3BPlanned
2026.08.12India GCI Resitop Private Limited4229India GCI Resitop to install synthetic resin production equipment at Tamil Nadu plantIndia GCI Resitop Private Limited plans to invest JPY 1.152 billion in synthetic resin production equipment at its plant in Tamil Nadu, India. Construction began in June 2025 and completion is scheduled for July 2027; the disclosure does not state the resulting capacity increase.Materials & ChemicalsTamil Nadu¥1.2BBuilding
2026.08.12Intercontinental Specialty Fats Sdn. Bhd.2602Intercontinental Specialty Fats to expand processed fats production equipment in Selangor, MalaysiaIntercontinental Specialty Fats Sdn. Bhd. is investing in processed fats manufacturing equipment at its headquarters and factory in Selangor, Malaysia. The project started in February 2024 and is scheduled for completion in November 2026, increasing production capacity.Food & BeverageSelangor¥5.8BBuilding
2026.08.12Isewan Kaiun Co., Ltd.9359Isewan Kaiun to renovate pier and install crane at Tomei Port facilityIsewan Kaiun plans to renovate a pier and install a crane at its Tomei Port facility in Nagoya's Minato Ward. The project has a total planned investment of JPY 1.7 billion, with construction scheduled from April 2025 through May 2027.Logistics FacilitiesNagoya, Aichi¥1.7BBuilding
2026.08.12Isuzu Motors Limited7202Isuzu North America to develop production facility in South CarolinaIsuzu North America Corporation is developing production facilities and production equipment at a production base in Greenville County, South Carolina, United States. Construction began in January 2025 and is scheduled for completion in December 2026; the disclosure does not state the investment amount or added capacity.Automotive & TransportGreenville County, South Carolinanot disclosedBuilding
2026.08.12Isuzu Motors7202Isuzu Thailand to install vehicle assembly equipment at Samut Prakan headquartersIsuzu Motors' Thai subsidiary plans to install vehicle assembly equipment and related facilities at its headquarters in Phra Pradaeng, Samut Prakan, Thailand. Work is scheduled from April 2026 through March 2027; the disclosure does not state an investment amount or added capacity.Automotive & TransportPhra Pradaeng, Thailandnot disclosedPlanned
2026.08.12J-OIL MILLS, Inc.2613J-OIL MILLS to build new R&D facility in KawasakiJ-OIL MILLS plans to construct a new research and development facility in Kawasaki, Kanagawa. The project has a total planned investment of ¥2.65 billion, with construction scheduled from October 2025 to January 2027 and funded through internal resources.R&D FacilitiesKawasaki, Kanagawa¥2.7BBuilding
2026.08.12Japan Petroleum Exploration Co., Ltd.1662Japex U.S. to develop wells and production facilities in Colorado and WyomingJapex(U.S.)Corp., a subsidiary of Japan Petroleum Exploration, plans to develop wells and related production facilities in the U.S. states of Colorado and Wyoming. The project is scheduled to proceed from March through December 2026 and is expected to add approximately 5,800 barrels per day of oil-equivalent production capacity.Power & EnergyColorado and Wyomingnot disclosedPlanned
2026.08.12JCR Pharmaceuticals Co., Ltd.4552JCR Pharmaceuticals to build new formulation plant at Kobe Science ParkJCR Pharmaceuticals is investing ¥25.0 billion in a new pharmaceutical formulation manufacturing plant at Kobe Science Park in Nishi Ward, Kobe. Construction began in February 2025 and completion is scheduled for September 2026, with the project intended to increase pharmaceutical production capacity.Pharma & MedicalKobe, Hyogo¥25BBuilding
2026.08.12JCU Corporation4975JCU (Thailand) to build new factory in ThailandJCU (Thailand) plans to build a new factory in Thailand with a total planned investment of ¥3.3 billion. Construction began in July 2024 and is scheduled for completion in February 2027, funded with the company's own resources.Materials & ChemicalsThailand¥3.3BBuilding
2026.08.12Jefferson Elora Corporation5970Jefferson Elora Corporation to expand automotive-parts manufacturing capacity in OntarioJefferson Elora Corporation plans to invest JPY 4.002 billion in automotive-parts manufacturing equipment at its Ontario, Canada facility. Construction began in January 2025, with completion scheduled for August 2026; the project will increase production capacity.Automotive & TransportOntario¥4BBuilding
2026.08.12Jefferson Industries Corporation5970Jefferson Industries to expand automotive-parts production equipment in OhioJefferson Industries Corporation plans to invest in equipment to expand automotive-parts production capacity at its Ohio, United States operation. Construction began in September 2025, with completion scheduled for October 2026; total planned investment is ¥2.301 billion.Automotive & TransportOhio¥2.3BBuilding
2026.08.12Jefferson Southern Corporation5970Jefferson Southern Corporation to install automotive-parts manufacturing equipment in GeorgiaJefferson Southern Corporation plans to invest ¥1.487 billion in automotive-parts manufacturing equipment at its Georgia, United States facility. Construction began in March 2024, with completion scheduled for September 2026; the equipment will add production capability for a new vehicle model.Automotive & TransportGeorgia¥1.5BBuilding
2026.08.12JGC Catalysts and Chemicals Co., Ltd.1963JGC Catalysts & Chemicals to expand catalyst, chemicals manufacturing and R&D facilities in KitakyushuJGC Catalysts & Chemicals plans a ¥4.31 billion investment in catalyst and chemicals manufacturing and research and development facilities at its Kitakyushu office in Wakamatsu-ku. Construction is scheduled to start in April 2026 and be completed in March 2028.Materials & ChemicalsKitakyushu, Fukuoka¥4.3BPlanned
2026.08.12JSAT Beyond Innovation LLC9412JSAT Beyond Innovation to deploy Pelican optical observation satellite in low Earth orbitJSAT Beyond Innovation plans to invest JPY 37 billion in the Pelican optical observation satellite and related equipment, operating in low Earth orbit at an altitude of 350-500 km outside Japan. Construction or deployment began in April 2025, with completion planned from the first half of 2027 onward.OtherOuter space¥37BPlanned
2026.08.12JTEKT Corporation6473JTEKT to install automotive product manufacturing equipment in Haryana, IndiaJTEKT plans to invest ¥5.6 billion in automotive product manufacturing equipment and related facilities in Haryana, India. Construction is scheduled to start in April 2026 and be completed by March 2027, funded internally.Automotive & TransportHaryana¥5.6BPlanned
2026.08.12Kameda Seika Co., Ltd.2220Kameda Seika plans confectionery production equipment investment at THFOODS in the United StatesKameda Seika plans to invest in confectionery production equipment and related facilities at its U.S. subsidiary, THFOODS, INC. The investment is scheduled to begin in April 2026 and be completed by March 2027, funded through internal resources and borrowings.Food & BeverageUnited States¥4.6BPlanned
2026.08.12Kameda Seika Co., Ltd.2220Kameda Seika to install confectionery production equipment at Kameda PlantKameda Seika plans to invest JPY 1.429 billion in new confectionery production equipment and related facilities at its Kameda Plant in Konan Ward, Niigata City. Construction is scheduled to start in April 2026 and be completed in March 2027, funded through internal funds and borrowings.Food & BeverageNiigata, Niigata¥1.4BPlanned
2026.08.12Kameda Seika Co., Ltd.2220Kameda Seika to install confectionery production equipment at Shirone FactoryKameda Seika plans to invest JPY 1.131 billion in confectionery production equipment and related facilities at its Shirone Factory in Minami Ward, Niigata City. Construction is scheduled to begin in April 2026 and finish in March 2027, funded by internal funds and borrowings.Food & BeverageNiigata, Niigata¥1.1BPlanned
2026.08.12Kanadevia Corporation7004Kanadevia to install pilot solar-cell manufacturing equipment at Chikko PlantKanadevia plans to install pilot equipment for solar-cell manufacturing at its Chikko Plant in Taisho Ward, Osaka City. The project is scheduled to start in August 2025 and be completed in March 2027, with total planned investment of JPY 1.2 billion.Semiconductors & ElectronicsOsaka, Osaka¥1.2BBuilding
2026.08.12Kanadevia Corporation7004Kanadevia to invest in water-electrolysis press line at Chikko FactoryKanadevia plans to invest JPY 1.525 billion in water-electrolysis press-line equipment at its Chikko Factory in Taisho-ku, Osaka. Construction started in September 2025 and is scheduled for completion in March 2027; the disclosure does not state the resulting capacity.Machinery & RoboticsOsaka, Osaka¥1.5BBuilding
2026.08.12KIKKOMANFOODS,INC.2801Kikkoman Foods to expand soy sauce production equipment at Jefferson plant in WisconsinKikkoman Foods plans to install production equipment for soy sauce and related seasonings at its Jefferson plant in Wisconsin. The project has a total planned investment of ¥79.889 billion, with construction starting in April 2024 and completion scheduled for September 2026.Food & BeverageJefferson, Wisconsin¥79.9BBuilding
2026.08.12Kimura Kohki Co., Ltd.6231Kimura Kohki to expand Kawage Plant in Tsu, MieKimura Kohki plans a building and equipment investment at its Kawage Plant in Tsu, Mie Prefecture. The project has a total planned investment of ¥4 billion, with construction scheduled to start in February 2026 and finish in April 2028.Other ManufacturingTsu, Mie¥4BBuilding
2026.08.12Kintetsu Rex Co., Ltd.9037Kintetsu Rex to build new Atsugi Branch facilityKintetsu Rex plans to construct a new building for its Atsugi Branch in Atsugi, Kanagawa, supporting its freight trucking business. The project is scheduled to start in April 2026 and be completed in September 2027, adding 6,311 sqm of capacity.Logistics FacilitiesAtsugi, Kanagawa¥1.6BPlanned
2026.08.12Kokusai Semiconductor Equipment Corporation6525Kokusai Semiconductor Equipment to develop semiconductor equipment evaluation facilities in OregonKokusai Semiconductor Equipment Corporation is investing ¥18.702 billion in development and evaluation facilities in Oregon, United States, for batch deposition equipment and single-wafer plasma treatment equipment. Construction began in November 2024 and completion is scheduled for December 2026.Semiconductors & ElectronicsOregon¥18.7BBuilding
2026.08.12Konoike Transport Co., Ltd.9025Konoike-General to acquire land and warehouse in Los AngelesKonoike-General plans a logistics investment comprising land and a warehouse in Los Angeles, California, for its international logistics business. The project began in December 2024 and is scheduled for completion in September 2027; the total planned investment is $55.0 million.Logistics FacilitiesLos Angeles, California$55MBuilding
2026.08.12Konoike-PacificCalifornia, Inc.9025Konoike-PacificCalifornia to develop warehouse in Los AngelesKonoike-PacificCalifornia, Inc. is developing a warehouse in Los Angeles, California, as part of its international logistics business. Construction began in October 2022 and completion is scheduled for September 2027; the disclosed investment is $37.5 million in total, with $9.7 million already paid.Logistics FacilitiesLos Angeles, California$37.5MBuilding
2026.08.12Konoike Transport Co., Ltd.9025Konoike Transport plans warehouse and vehicle investment in Chiba CityKonoike Transport plans new logistics facilities and vehicles at or around its Kanto Branch in Chuo Ward, Chiba City. The filing does not disclose the investment amount, schedule, capacity, or contractors.Logistics FacilitiesChiba, Chibanot disclosedPlanned
2026.08.12Konoike Transport9025Konoike Transport plans warehouse and vehicle investments at its Kitakyushu engineering branchKonoike Transport lists planned new equipment, including warehouses and vehicles, at its Engineering Branch in Kokurakita Ward, Kitakyushu. The filing does not disclose the investment amount, schedule, or post-completion capacity increase.Logistics FacilitiesKitakyushu, Fukuokanot disclosedPlanned
2026.08.12Konoike Transport Co., Ltd.9025Konoike Transport plans warehouse and vehicle investments at Osaka Port logistics siteKonoike Transport plans new warehouse, vehicle and related facilities for its International Logistics Kansai Branch in Osaka's Minato Ward and other locations. The filing does not disclose the investment amount, schedule or post-completion capacity increase.Logistics FacilitiesOsaka, Osakanot disclosedPlanned
2026.08.12Konoike Transport Co., Ltd.9025Konoike Transport plans warehouse and vehicle investments at Tokai Branch in NagoyaKonoike Transport lists planned investments in warehouses, vehicles and related assets at its Tokai Branch and other locations in Atsuta Ward, Nagoya. The filing does not disclose the investment amount, schedule, or added capacity.Logistics FacilitiesNagoya, Aichinot disclosedPlanned
2026.08.12Konoike Transport Co., Ltd.9025Konoike Transport plans warehouse and vehicle investments in OsakaKonoike Transport lists planned investment in warehouses and vehicles at its West Japan Branch in Kita Ward, Osaka, and other locations. The filing does not disclose the investment amount, schedule, or added capacity.Logistics FacilitiesOsaka, Osakanot disclosedPlanned
2026.08.12Kurimoto, Ltd.5602Kurimoto to install ductile iron pipe manufacturing equipment at Kagaya PlantKurimoto plans to invest JPY 4.781 billion in ductile iron pipe manufacturing equipment at its Kagaya Plant in Suminoe-ku, Osaka. Construction began in April 2024 and is scheduled for completion in March 2027; the disclosure does not state the resulting capacity increase.Steel & Non-ferrous MetalsOsaka, Osaka¥4.8BBuilding
2026.08.12Kurimoto, Ltd.5602Kurimoto to upgrade ductile iron pipe production equipment at Sakai PlantKurimoto is investing in ductile iron pipe manufacturing equipment at its Sakai Plant in Sakai's Nishi Ward. The project began in April 2024 and is scheduled for completion in March 2027, funded with the company's own resources.Steel & Non-ferrous MetalsSakai, Osaka¥1.2BBuilding
2026.08.12Kurimoto, Ltd.5602Kurimoto to upgrade machinery and valve production facilities at Sumiyoshi PlantKurimoto Iron Works plans a ¥5.403 billion investment in machinery and valve manufacturing facilities at its Sumiyoshi Plant in Suminoe-ku, Osaka. Construction began in April 2024 and is scheduled for completion in March 2027, funded with the company's own funds.Machinery & RoboticsOsaka, Osaka¥5.4BBuilding
2026.08.12Kuroda Group Co., Ltd.287AKuroda Group to build new factory in Anhui, ChinaKuroda Group plans to build a new manufacturing plant through its Chinese subsidiary Akimura Technology (Hefei) Co., Ltd. in Anhui, China. The project is scheduled to start in February 2025 and be completed in January 2027, with total planned investment of ¥1.5 billion.Other ManufacturingChina¥1.5BBuilding
2026.08.12Kyoei Steel Ltd.5440Kyoei Steel to expand Vinton Steel manufacturing facilities in TexasKyoei Steel plans a ¥50.685 billion investment in manufacturing facilities at its Vinton Steel subsidiary in Texas, United States. Construction began in August 2025 and is scheduled for completion in September 2027; the disclosure does not specify added capacity.Steel & Non-ferrous MetalsTexas¥50.7BBuilding
2026.08.12Kyokuto Kaihatsu Kogyo Co., Ltd.7226Kyokuto Kaihatsu Kogyo to expand trailer production equipment in West Java, IndonesiaPT. Kyokuto Indomobil Manufacturing Indonesia is investing in trailer and other special-purpose vehicle production equipment at its factory in West Java, Indonesia. The project started in September 2024 and is scheduled for completion in July 2026, with total planned investment of ¥1.738 billion funded through a capital increase.Automotive & TransportWest Java¥1.7BBuilding
2026.08.12Lapis Semiconductor Co., Ltd.6963Lapis Semiconductor to install production equipment in YokohamaLapis Semiconductor, a ROHM subsidiary, plans to invest ¥21.519 billion in production equipment and related facilities at sites including Kohoku Ward, Yokohama. The project is scheduled to begin in April 2026 and be completed by March 2027, funded with internal resources; no capacity increase is disclosed.Semiconductors & ElectronicsYokohama, Kanagawa¥21.5BPlanned
2026.08.12MechTech Manufacturing Corp. Zhuhai Ltd.7240MechTech Manufacturing Zhuhai to install flexible printed circuit board production equipmentMechTech Manufacturing Corp. Zhuhai Ltd., a subsidiary of Japanese company MechTech Manufacturing, plans to invest JPY 3.44 billion in flexible printed circuit board manufacturing equipment at its Zhuhai facility in China. Construction or installation is scheduled to begin in April 2026 and be completed in September 2026; no post-investment capacity increase is disclosed.Semiconductors & ElectronicsZhuhai, China¥3.4BPlanned
2026.08.12Megmilk Snow Brand Co., Ltd.2270Megmilk Snow Brand to upgrade cheese and milk-powder facilities in Hokkaido and IbarakiMegmilk Snow Brand will invest in new technology to enable production of higher-value-added cheese at its Nakashibetsu Plant in Hokkaido and expand milk-powder equipment capacity at its Ami Plant in Ibaraki. Construction began in July 2025, with completion scheduled for November 2029; the investment will also powder whey generated during cheese production.Food & BeverageNakashibetsu; Ami, Hokkaido; Ibaraki¥47.5BBuilding
2026.08.12Meiko Electronics Co., Ltd.6787Meiko Electronics to expand production capacity at Yen Quang factory in VietnamMeiko Electronics plans to invest ¥6 billion in production equipment at its Yen Quang factory in Phu Tho Province, Vietnam. Construction or installation is scheduled to begin in April 2026 and finish in March 2027, with production capacity expected to increase.Semiconductors & ElectronicsPhu Tho Province¥6BPlanned
2026.08.12Meiko Electronics Co., Ltd.6787Meiko Electronics to expand production equipment at Hai Duong factory in VietnamMeiko Electronics Hai Duong Vietnam Co., Ltd. plans to invest in production equipment at its Hai Duong factory in Hai Phong, Vietnam. The ¥1.3 billion project is intended to increase production capacity and improve operational efficiency, with work scheduled from April 2026 through March 2027.Semiconductors & ElectronicsHai Phong, Vietnam¥1.3BPlanned
2026.08.12Meiko Electronics Hoa Binh Co., Ltd.6787Meiko Electronics to expand production equipment at Hoa Binh Factory in VietnamMeiko Electronics Hoa Binh Co., Ltd. plans to invest JPY 13.3 billion in production equipment at its Hoa Binh Factory in Vietnam. Construction is scheduled to run from April 2026 through March 2027, with the project intended to increase production capacity.Semiconductors & ElectronicsPhu Tho¥13.3BPlanned
2026.08.12Meiko Electronics Co., Ltd.6787Meiko Electronics to expand production equipment at Quang Minh factory in Hanoi, VietnamMeiko Electronics Quang Minh Co., Ltd. plans to invest JPY 8.4 billion in production equipment at its Quang Minh factory in Hanoi, Vietnam. Construction is scheduled from April 2026 through March 2027, with the project intended to increase production capacity.Semiconductors & ElectronicsHanoi, Vietnam¥8.4BPlanned
2026.08.12Meiko Electronics Co., Ltd.6787Meiko Electronics to install production equipment at Guangzhou Nansha factoryMeiko Electronics plans to invest JPY 1.8 billion in production equipment at its Guangzhou factory in Guangdong, China. The investment is scheduled to begin in April 2026 and be completed by March 2027, with the project aimed at improving quality and production efficiency.Semiconductors & ElectronicsGuangzhou, Guangdong¥1.8BPlanned
2026.08.12Meiko Electronics Co., Ltd.6787Meiko Electronics to install production equipment at Wuhan factoryMeiko Electronics plans to invest in production equipment at its Wuhan factory in Wuhan, Hubei, China. The project is intended to improve quality and streamline production, with construction planned from April 2026 through March 2027.Semiconductors & ElectronicsWuhan, Hubei¥1.4BPlanned
2026.08.12Meiko Electronics Co., Ltd.6787Meiko Electronics Vietnam to install production equipment at Hanoi factoryMeiko Electronics Vietnam Co., Ltd. plans a ¥24.6 billion investment in production equipment at its factory in Hanoi, Vietnam. The project is intended to expand production capacity and improve operational efficiency, with construction scheduled from April 2026 to March 2027.Semiconductors & ElectronicsHanoi, Vietnam¥24.6BPlanned
2026.08.12Meiko Trans Polska Sp. z o.o.9357Meiko Trans Polska to build its third warehouse in Dabrowa, PolandMeiko Trans Polska is investing ¥2.984 billion to build its third warehouse in Dabrowa, Poland. Construction began in May 2025 and is scheduled for completion in May 2027; the disclosure does not state the warehouse's capacity.Logistics FacilitiesDabrowa, Poland¥3BBuilding
2026.08.12Mektec Manufacturing Corporation Suzhou7240Mektec Manufacturing Corporation Suzhou to install flexible printed circuit board production equipmentMektec Manufacturing Corporation Suzhou plans to invest JPY 3.025 billion in flexible printed circuit board manufacturing equipment at its Suzhou, China facility. Construction or installation is scheduled to start in April 2026 and be completed in January 2027, with funding provided through borrowings.Semiconductors & ElectronicsSuzhou, China¥3BPlanned
2026.08.12Menicon Co., Ltd.7780Menicon to add eight daily disposable contact lens production lines at its Malaysia factoryMeniconMalaysia Sdn. Bhd. is investing in new production lines and molds at its factory in Kedah, Malaysia. The project will add eight production lines for daily disposable contact lenses, with completion scheduled for December 2027.Pharma & MedicalKedah¥48.1BBuilding
2026.08.12Midac Holdings Co., Ltd.6564Midac Holdings plans waste incineration facility in KumagayaMidac Holdings is developing a waste incineration facility in Kumagaya, Saitama, covering land and other related facilities. Construction started in November 2021; the total planned investment and completion date have not been disclosed, and funding is planned from capital-raising proceeds and borrowings.OtherKumagaya, Saitamanot disclosedBuilding
2026.08.12Midac Co., Ltd.6564Midac to develop Okuyama-no-Mori Clean Center landfill in HamamatsuMidac Co., Ltd., a subsidiary of Midac Holdings, is developing the Okuyama-no-Mori Clean Center final disposal facility in Hamamatsu, Shizuoka, in four phases. The project began in December 2008 and is scheduled for completion in December 2026, with total planned investment of ¥12.005 billion.OtherHamamatsu, Shizuoka¥12BBuilding
2026.08.12Mikuni India Private Limited7247Mikuni India to install production equipment at Rajasthan headquarters plantMikuni India Private Limited plans to install production equipment at its headquarters plant in Rajasthan, India, for its mobility business. The project has a total planned investment of JPY 1.108 billion, with work scheduled from April 2026 through March 2027.Automotive & TransportRajasthan¥1.1BPlanned
2026.08.12Mirai Industry Co., Ltd.7931Mirai Industry to expand electrical-materials and piping-materials production equipment at Ogaki plantMirai Industry is investing in new production equipment for electrical materials and piping materials at its Ogaki plant in Wanouchi, Gifu. The project began in November 2020 and is scheduled for completion in March 2027, with post-completion capacity expected to increase by 3%.Other ManufacturingWanouchi, Gifu¥1.8BBuilding
2026.08.12Mitsuba Co., Ltd.7280Mitsuba India to install production equipment for new productsMitsuba India Private Limited plans to install production equipment and related facilities for new products. The project is scheduled to begin in April 2026 and finish in March 2027, with a planned investment of ¥4.958 billion funded through internal funds and borrowings.Automotive & TransportIndia¥5BPlanned
2026.08.12Mitsuba Corporation7280Mitsuba to install new-product production equipment at Brazilian subsidiaryMitsuba plans to invest JPY 1.233 billion in production equipment and related assets for new products at Mitsuba do Brasil Limitada. Work is scheduled from April 2026 through March 2027 and will be funded internally; the disclosure does not state the resulting capacity increase.Automotive & TransportBrazil¥1.2BPlanned
2026.08.12Mitsuba Corporation7280Mitsuba to install new-product production equipment at its Mexican subsidiaryMitsuba plans to invest in production equipment and related assets for new products at Corporacion Mitsuba de Mexico, S.A. de C.V. The project is scheduled to begin in April 2026 and be completed by March 2027, funded internally.Automotive & TransportMexico¥1.1BPlanned
2026.08.12Mitsui-Soko Co., Ltd.9302Mitsui-Soko (Korea) to expand general and hazardous-material warehouses in ChangwonMitsui-Soko (Korea) is expanding general and hazardous-material warehouse facilities in Changwon, South Korea. The project has a total planned investment of JPY 5.071 billion, with construction underway from May 2025 and scheduled for completion in October 2026.Logistics FacilitiesChangwon, South Korea¥5.1BBuilding
2026.08.12Morinaga & Co., Ltd.2201Morinaga America Foods to expand buildings and production equipment at North Carolina plantMorinaga America Foods, a subsidiary of Morinaga & Co., plans investment in buildings and production equipment at its headquarters plant in North Carolina, United States. Construction began in November 2024, with the project intended to strengthen the supply structure and improve production efficiency; the disclosed investment amount is not specified in the source.Food & BeverageNorth Carolinanot disclosedBuilding
2026.08.12Moriroku Technology Co., Ltd.4249Moriroku Technology India to renew resin molding equipment in Andhra PradeshMoriroku Technology India plans to renew resin molding and processing equipment at its facility in Andhra Pradesh, India. The project has a total planned investment of ¥1.139 billion, with work scheduled from April 2026 through March 2027 and funded internally.Materials & ChemicalsAndhra Pradesh¥1.1BPlanned
2026.08.12Moriroku Technology North America Inc.4249Moriroku Technology North America to renew resin molding equipment in OhioMoriroku Technology North America plans to renew resin molding and processing equipment at its operations in Ohio and elsewhere in the United States. The project has a total planned investment of JPY 2.048 billion, with work scheduled from April 2026 through March 2027; no post-project capacity increase is disclosed.Other ManufacturingOhio¥2BPlanned
2026.08.12Moriroku Technology (Thailand) Co., Ltd.4249Moriroku Technology Thailand to renew resin molding equipment in ChonburiMoriroku Technology Thailand Co., Ltd. plans to renew resin molding and processing equipment at its facility in Chonburi Province, Thailand. The project has a total planned investment of ¥1.297 billion, with construction scheduled from April 2026 through March 2027; no post-completion capacity increase is disclosed.Materials & ChemicalsChonburi¥1.3BPlanned
2026.08.12Mos Food Services8153Mos Food Services to build new factory in Pingtung, TaiwanMos Food Services plans to establish a new factory at its Pingtung site in Taiwan for its overseas business. The project is scheduled to start in May 2025 and be completed in July 2026, with total planned investment of ¥1.646 billion funded by capital increases and borrowings.Food & BeveragePingtung, Taiwan¥1.6BPlanned
2026.08.12Murata Manufacturing Co., Ltd.6981Murata Electronics (Thailand) to install component and device/module production equipmentMurata Electronics (Thailand) plans a ¥20.0 billion investment in component and device/module production equipment at its Thailand operations. Construction is scheduled from March 2026 through March 2027, funded by cash on hand and intra-group borrowings; no capacity increase is disclosed.Semiconductors & ElectronicsThailand¥20BPlanned
2026.08.12Murata Manufacturing Co., Ltd.6981Murata Manufacturing to expand component production equipment in the PhilippinesMurata Manufacturing's Philippine subsidiary plans to invest ¥8.0 billion in component production equipment. Construction is scheduled to run from March 2026 through March 2027, funded by cash on hand and intra-group borrowings; no incremental production capacity is disclosed.Semiconductors & ElectronicsPhilippines¥8BPlanned
2026.08.12Wuxi Murata Electronics Co., Ltd.6981Murata to expand component and device-module production equipment in ChinaWuxi Murata Electronics Co., Ltd., a Murata Manufacturing group company, plans to invest in component and device-module production equipment in China. The project is scheduled to begin in March 2026 and be completed in March 2027, funded through cash on hand and intra-group borrowing.Semiconductors & ElectronicsChina¥12BPlanned
2026.08.12Nagase & Co., Ltd.8012Nagase to develop R&D facility in Kobe Port IslandNagase Corporation plans to develop research and development facilities at its Kobe Port Island research site in Kobe, Hyogo. Construction began in March 2026, with completion planned for FY2028; the total planned investment amount is not disclosed.R&D FacilitiesKobe, Hyogonot disclosedBuilding
2026.08.12Nakayama Steel Works, Ltd.5408Nakayama Steel to build electric arc furnace and building at Funamachi plantNakayama Steel plans to install electric arc furnace equipment and construct a building at its head office Funamachi plant in Taisho-ku, Osaka. The project has a planned total investment of ¥95 billion, with construction starting in May 2025 and completion scheduled for 2030 or later.Steel & Non-ferrous MetalsOsaka, Osaka¥95BPlanned
2026.08.12NICHIDEN Corporation9902NICHIDEN to expand logistics functions at Hasuda Distribution CenterNICHIDEN Corporation plans a ¥5 billion investment to strengthen logistics functions at its Hasuda Distribution Center in Hasuda, Saitama. Construction began in January 2025 and is scheduled for completion in August 2026, funded internally.Logistics FacilitiesHasuda, Saitama¥5BBuilding
2026.08.12Nifco India Private Ltd.7988Nifco India to build new synthetic resin molding plant in HaryanaNifco India Private Ltd. is building a new factory in Haryana, India for its synthetic resin molded products business. Construction started in May 2025 and is scheduled for completion in July 2027, with total planned investment of ¥4.3 billion.Materials & ChemicalsHaryana¥4.3BBuilding
2026.08.12Nippon Chuzo5609Nippon Chuzo plans new equipment at Fukuyama Manufacturing FacilityNippon Chuzo discloses a planned major equipment investment at its Fukuyama Manufacturing Facility in Fukuyama, Hiroshima. The filing does not disclose the investment amount, schedule, capacity increase, contractor, or equipment vendor.Steel & Non-ferrous MetalsFukuyama, Hiroshimanot disclosedPlanned
2026.08.12Nippon Gases Norge AS4091Nippon Gases Norge to install new air separation unit at Viganeset plantNippon Gases Norge AS is installing a new air separation unit at its Viganeset plant in Hjelmeland Municipality, Norway. The project has a total planned investment of ¥6.672 billion, with construction scheduled from July 2025 through August 2027.Materials & ChemicalsHjelmeland, Norway¥6.7BBuilding
2026.08.12Nippon Gear Co., Ltd.6356Nippon Gear to invest in production equipment at Fujisawa plantNippon Gear plans to invest in production equipment at its Fujisawa plant in Fujisawa, Kanagawa. The total planned investment is approximately JPY 1.054 billion, with work scheduled from April 2026 through March 2027 and funded through internal funds and borrowings.Machinery & RoboticsFujisawa, Kanagawa¥1.1BPlanned
2026.08.12Nippon Parkerizing Co., Ltd.4095Nippon Parkerizing India to build new chemical plant in ChennaiNippon Parkerizing India plans to build a new chemical plant in Chennai, India, for its chemicals business. Construction started in September 2025 and is scheduled for completion in December 2026, with total planned investment of JPY 5.814 billion.Materials & ChemicalsChennai, India¥5.8BBuilding
2026.08.12Nipro Medical Corporation8086Nipro Medical Corporation to build injection-needle plant in North CarolinaNipro Medical Corporation plans to build an injection-needle factory and install manufacturing equipment in North Carolina, United States. The project has a total planned investment of ¥18.447 billion and is scheduled to be completed in July 2027, adding annual capacity of 945 million needles.Pharma & MedicalNorth Carolina¥18.4BBuilding
2026.08.12Nipro Pharma Packaging France S.A.S.8086Nipro Pharma Packaging France to build glass tubing plant in AumaleNipro Pharma Packaging France S.A.S., a subsidiary of Japanese company Nipro Corporation, is constructing a glass tubing manufacturing plant in Aumale, France. The project has a total planned investment of ¥10.991 billion and is scheduled for completion in September 2027, adding 14,600 tonnes per year of capacity.Materials & ChemicalsAumale, France¥11BBuilding
2026.08.12Nipro Pharma Packaging Germany GmbH8086Nipro Pharma Packaging Germany to add sterilized glass syringe washing line in MunnerstadtNipro Pharma Packaging Germany GmbH is investing JPY 16.739 billion to install a D2F washing line for sterilized glass syringes at its site in Munnerstadt, Germany. Construction began in April 2021 and is scheduled for completion in June 2027, adding annual capacity of 415 million units.Pharma & MedicalMunnerstadt, Germany¥16.7BBuilding
2026.08.12Nipro Corporation8086Nipro Vietnam to build new dialyzer factory in Ho Chi Minh CityNipro Vietnam Company Limited is constructing a new factory and manufacturing equipment for dialyzer production in Ho Chi Minh City, Vietnam. The project has a total planned investment of ¥43.264 billion, with construction scheduled from December 2020 through December 2031 and planned capacity of 30 million dialyzers per year.Pharma & MedicalHo Chi Minh City, Vietnam¥43.3BBuilding
2026.08.12Nishikawa Rubber Co., Ltd.5161Nishikawa Rubber to install automotive seal production equipment at its Delaware subsidiaryNishikawa Rubber plans to install production equipment for automotive sealing products at Nishikawa-Cooper LLC in Wilmington, Delaware. The project is scheduled to begin in January 2026 and be completed in December 2026, with total planned investment of ¥1.181 billion funded partly through borrowings.Automotive & TransportWilmington, United States¥1.2BPlanned
2026.08.12Nisshin Logistics Co., Ltd.2602Nisshin Logistics to expand raw-material handling facilities at Isogo siteNisshin Logistics plans to invest in expanded raw-material handling facilities at its Isogo business site in Yokohama, Kanagawa. The project is intended to increase raw-material handling capacity and is scheduled to start in December 2027 and be completed in January 2029.Food & BeverageYokohama, Kanagawa¥4.3BPlanned
2026.08.12The Nisshin OilliO Group, Ltd.2602Nisshin OilliO Group to expand oil and fat production equipment at Nagoya PlantNisshin OilliO Group plans to expand oil and fat production equipment at its Nagoya Plant in Nagoya, Aichi. The project has a total planned investment of ¥2.5 billion, with construction scheduled from April 2025 through January 2029; production capacity will increase after completion.Food & BeverageNagoya, Aichi¥2.5BBuilding
2026.08.12The Nisshin OilliO Group, Ltd.2602Nisshin OilliO Group to expand oil and fat production equipment at Sakai PlantNisshin Oillio Group plans to invest JPY 2.9 billion in oil and fat production equipment at its Sakai Plant in Sakai, Osaka. Construction began in March 2025 and is scheduled for completion in September 2028, with production capacity to increase after completion.Food & BeverageSakai, Osaka¥2.9BBuilding
2026.08.12The Nisshin OilliO Group, Ltd.2602Nisshin OilliO Group to expand oil and fat production facilities at MizushimaNisshin OilliO Group plans to expand oil and fat production facilities at its Mizushima Business Site in Kurashiki, Okayama. The project has a total planned investment of ¥2.2 billion, started in November 2023 and is scheduled for completion in May 2027, increasing production capacity.Food & BeverageKurashiki, Okayama¥2.2BBuilding
2026.08.12The Nisshin OilliO Group, Ltd.2602Nisshin OilliO Group to expand oil and fat production facilities at Yokohama Isogo siteThe Nisshin OilliO Group plans a JPY 3.2 billion investment in oil and fat production facilities at its Yokohama Isogo site in Yokohama, Kanagawa. Work began in November 2023 and is scheduled for completion in May 2027, funded from internal reserves and borrowings, and is intended to raise production capacity.Food & BeverageYokohama, Kanagawa¥3.2BBuilding
2026.08.12The Nisshin OilliO Group, Ltd.2602Nisshin OilliO Group to expand shipping facilities at Mizushima siteNisshin OilliO Group plans to invest ¥1.35 billion in shipping facilities at its Mizushima business site in Kurashiki, Okayama. Construction is scheduled to begin in January 2026 and finish in April 2027, increasing shipping capacity.Food & BeverageKurashiki, Okayama¥1.4BPlanned
2026.08.12The Nisshin OilliO Group, Ltd.2602Nisshin OilliO Group to upgrade oil and fat production equipment at Nagoya PlantThe Nisshin OilliO Group plans a JPY 1.6 billion investment in oil and fat production equipment at its Nagoya Plant in Nagoya, Aichi. Work began in March 2024 and is scheduled for completion in October 2026, funded from internal reserves and borrowings, and is intended to raise production capacity. It is one of two separate equipment plans the company lists for the Nagoya Plant.Food & BeverageNagoya, Aichi¥1.6BBuilding
2026.08.12Nitta Corporation5186Nitta Corporation India to build new factory in Pune, IndiaNitta Corporation India Pvt Ltd is constructing a new factory building in Pune, India, for its belts, rubber products, hose and tube products, and other industrial products businesses. The project has a total planned investment of ¥1.453 billion, with construction scheduled from March 2024 to June 2026.Other ManufacturingPune, India¥1.5BBuilding
2026.08.12Nitta Gelatin Inc.4977Nitta Gelatin to expand gelatin production equipment at Kerala plantNitta Gelatin plans to expand gelatin manufacturing equipment at its Nitta Gelatin India plant in Kerala, India. The project is scheduled to start in January 2025 and be completed in July 2027, increasing production capacity by 3,000 tonnes per year.Food & BeverageKerala¥2.3BBuilding
2026.08.12Nittan India Tech Pvt. Ltd.6493Nittan India Tech to expand and renew engine-valve production equipment in IndiaNittan India Tech plans to invest JPY 3.907 billion in engine-valve production equipment at its headquarters factory in India. Construction is scheduled from April 2026 through March 2027, with the project focused on production expansion and equipment renewal.Automotive & TransportIndia¥3.9BPlanned
2026.08.12Nittetsu Mining Co., Ltd.1515Nittetsu Mining to develop copper ore mining facilities at Arqueros Mine in ChileNittetsu Mining is developing copper ore and related mining facilities at its Arqueros Mine in La Serena, Coquimbo, Chile. The project has a total planned investment of ¥72.9 billion, started in April 2023, and is scheduled for completion in September 2026.Steel & Non-ferrous MetalsLa Serena, Coquimbo¥72.9BBuilding
2026.08.12NK Parts Industries, Inc.9072NK Parts Industries to build new warehouse at East Liberty, OhioNK Parts Industries plans to construct a new warehouse at its East Liberty branch in Ohio, United States. The project has a total planned investment of ¥3.35 billion and is scheduled to begin in April 2026 and finish in March 2027, adding 18,000 sqm of floor area.Logistics FacilitiesEast Liberty, Ohio¥3.4BPlanned
2026.08.12NOF Corporation4403NOF Metal Coatings Europe to install logistics equipment in BelgiumNOF Metal Coatings Europe plans to invest in logistics equipment at its Belgium operation. The project is scheduled to start in July 2025 and be completed by June 2027, with total planned investment of ¥1.112 billion.Materials & ChemicalsBelgium¥1.1BBuilding
2026.08.12OHASHI TECHNICA U.S.A. Manufacturing, Inc.7628OHASHI TECHNICA U.S.A. Manufacturing to expand Ohio factory and add production equipmentOHASHI TECHNICA U.S.A. Manufacturing, Inc. plans to expand its factory and install production equipment in Sunbury, Ohio. The project has a total planned investment of ¥1.657242 billion, with construction beginning in December 2024 and completion scheduled for January 2027.Automotive & TransportSunbury, Ohio¥1.7BBuilding
2026.08.12Osaka Gas9532Osaka Gas plans oil and gas production facilities in TexasOsaka Gas discloses planned investment in oil and gas production facilities in Texas through Sabine Energy Inc. The filing provides no investment amount, construction schedule, or capacity.Power & EnergyTexasnot disclosedPlanned
2026.08.12Press Kogyo Co., Ltd.7246Press Kogyo to install panel production equipment at Indiana factoryPress Kogyo plans to install panel production equipment at its PKU.S.A.,INC. headquarters and Indiana factory in Indiana, United States. The project has a planned investment of JPY 2.066 billion, with work scheduled from May 2025 through December 2026, to support its automotive-related business.Automotive & TransportIndiana¥2.1BBuilding
2026.08.12ProtecArisawaAmerica,Inc.5208ProtecArisawaAmerica to install industrial structural-material manufacturing equipment in CaliforniaProtecArisawaAmerica plans to install manufacturing equipment for industrial structural materials at its California, United States operation. Construction began in May 2026 and is scheduled for completion in March 2027; the disclosure does not state the equipment's added capacity.Materials & ChemicalsCalifornia$10MPlanned
2026.08.12Tokyo Radiator Mfg. Co., Ltd.7235PT. Tokyo Radiator Selamat Sempurna to install heat-exchanger manufacturing equipment in TangerangPT. Tokyo Radiator Selamat Sempurna plans to install heat-exchanger manufacturing equipment at its facility in Tangerang, Banten, Indonesia. Work is scheduled to begin in April 2026 and finish in March 2027; the disclosure does not state the investment amount or additional capacity.Automotive & TransportTangerang, Bantennot disclosedPlanned
2026.08.12QD Laser, Inc.6613QD Laser to install manufacturing equipment at its Yokohama headquartersQD Laser plans a ¥1.473 billion manufacturing-equipment investment at its Yokohama headquarters for its laser-device business. The project began in April 2025 and is scheduled for completion in March 2029, supporting relocation and mass-production capabilities for silicon photonics.Semiconductors & ElectronicsYokohama, Kanagawa¥1.5BBuilding
2026.08.12Rakus Co., Ltd.3923Rakus to invest in server equipment for data centers in OsakaRakus plans to invest in server equipment and related assets for its data center business at sites including Nishi Ward, Osaka. The investment is scheduled to begin in April 2026 and be completed by March 2029, funded with internal resources.Data CentersOsaka, Osaka¥2BPlanned
2026.08.12Resona Bank8308Resona Bank to invest ¥42 billion in computer systems and related equipmentResona Bank plans to invest ¥42 billion in computer systems and related equipment at facilities in Chuo Ward, Osaka, and elsewhere. The project is scheduled to start in April 2026, with no completion date disclosed.OtherOsaka, Osaka¥42BPlanned
2026.08.12Riken Vitamin Co., Ltd.4526Riken Vitamin to expand production capacity at Oklahoma facilityRiken Vitamin plans production-capacity expansion work at its Guymon Extracts facility in Oklahoma, United States. The project is scheduled to start in December 2023 and be completed in August 2027, adding 500 tonnes of capacity; the total planned investment is JPY 1.54 billion funded internally.Food & BeverageOklahoma¥1.5BBuilding
2026.08.12ROHM Integrated Systems (Thailand) Co., Ltd.6963ROHM Integrated Systems Thailand to install production equipment at Tak Krong NuengROHM Integrated Systems (Thailand) plans to invest in production equipment and related assets at its Tak Krong Nueng facility. The project is budgeted at JPY 5.695 billion, funded internally, with work scheduled from April 2026 through March 2027.Semiconductors & ElectronicsTak Krong Nueng, Thailand¥5.7BPlanned
2026.08.12ROHM Co., Ltd.6963ROHM to install production equipment at facilities in Ukyo-ku, KyotoROHM plans to invest in production equipment and related facilities at sites in Ukyo-ku, Kyoto, and elsewhere. The project is scheduled to begin in April 2026 and be completed by March 2027, funded internally; no post-completion capacity increase is disclosed.Semiconductors & ElectronicsKyoto, Kyoto¥13.7BPlanned
2026.08.12Saibu Gas Corporation9536Saibu Gas to expand LNG tank facilities in Hakata, FukuokaSaibu Gas plans to invest ¥50 billion in LNG tanks and related facilities in Hakata Ward and other locations in Fukuoka City. Construction began in September 2025, with completion planned for the first half of fiscal 2029; the project will add one 230,000-kiloliter LNG tank and other capacity.Power & EnergyFukuoka, Fukuoka¥50BPlanned
2026.08.12Sakura Internet Inc.3778Sakura Internet to build container-type data center at IshikariSakura Internet is investing JPY 17.0 billion in a container-type data center at its Ishikari Data Center in Ishikari, Hokkaido. Work began in June 2024 and is funded by subsidies, borrowings and internal resources; JPY 7.965 billion had been paid as of the filing and the completion date is undisclosed.Data CentersIshikari, Hokkaido¥17BBuilding
2026.08.12Sakura Internet Inc.3778Sakura Internet to fit out Ishikari Building 3 zones C and D and a Building 2 generatorSakura Internet plans a JPY 5.3 billion investment in zones C and D of Building 3 and a generator for Building 2 at its Ishikari Data Center in Ishikari, Hokkaido. Work began in March 2025 and is scheduled for completion in April 2027, financed by lease.Data CentersIshikari, Hokkaido¥5.3BBuilding
2026.08.12Sakura Internet Inc.3778Sakura Internet to install GPU, networking and storage equipment at Ishikari data centerSakura Internet plans to invest in GPU equipment, networking equipment, storage equipment and related assets at its Ishikari Data Center in Ishikari, Hokkaido. The investment is scheduled to begin from June 2026, funded by subsidies and internal resources; the total investment amount and completion date are undisclosed.Data CentersIshikari, Hokkaidonot disclosedPlanned
2026.08.12Santen Pharmaceutical Co., Ltd.4536Santen Pharmaceutical to expand pharmaceutical manufacturing facilities in Suzhou, ChinaSanten Pharmaceutical is investing ¥27.5 billion in pharmaceutical manufacturing facilities at its Suzhou plant in China. Construction began in April 2021 and completion is scheduled for January 2027; the disclosure does not state the added production capacity.Pharma & MedicalSuzhou, China¥27.5BPlanned
2026.08.12Sanyo Chemical Industries, Ltd.4471Sanyo Chemical Industries to build microbial fermentation and purification facilities at Kyoto plantSanyo Chemical Industry plans to install new microbial fermentation and purification facilities at its Kyoto plant in Higashiyama, Kyoto. The project has a total planned investment of JPY 1.057 billion, with construction scheduled to begin in April 2026 and completion planned for January 2028.Materials & ChemicalsKyoto, Kyoto¥1.1BPlanned
2026.08.12Seibu Gas Corporation9536Seibu Gas to expand gas trunk and branch pipelines in FukuokaSeibu Gas plans a total investment of JPY 6.147 billion in gas trunk and branch pipelines in Hakata Ward and other areas of Fukuoka City. The project is expected to add 75 km of gas pipeline capacity in fiscal 2026.Power & EnergyFukuoka, Fukuoka¥6.1BPlanned
2026.08.12Seiren Co., Ltd.3569Seiren to build automotive materials factory in Sao Paulo State, BrazilSeiren Produtos Automotivos Ltda. plans to build a new automotive materials factory in Sao Paulo State, Brazil. The project has a total planned investment of ¥1.026 billion, with construction scheduled to start in July 2026 and finish in August 2027; the completed facility will have 7,125 sqm of floor area.Automotive & TransportSao Paulo¥1BPlanned
2026.08.12SEMITEC Corporation6626SEMITEC to build new Chiba factory in Hanamigawa, ChibaSEMITEC plans to construct a new factory in Hanamigawa Ward, Chiba City, with a total planned investment of ¥2.5 billion. The project is intended to increase production capacity and strengthen business continuity preparedness, with construction scheduled from December 2026 to December 2027.Other ManufacturingChiba, Chiba¥2.5BPlanned
2026.08.12Shibaura Mechatronics Corporation6590Shibaura Mechatronics to expand production and R&D facilities at Sagamino siteShibaura Mechatronics plans to invest ¥2.582 billion in new and expanded production and R&D facilities at its Sagamino business site in Ebina, Kanagawa. Construction is scheduled from April 2026 through March 2027 and will be funded internally.Machinery & RoboticsEbina, Kanagawa¥2.6BPlanned
2026.08.12Shibaura Mechatronics Corporation6590Shibaura Mechatronics to expand production and R&D facilities at Yokohama siteShibaura Mechatronics plans to invest JPY 3.111 billion in new and expanded production and research and development facilities at its Yokohama site in Sakae Ward, Yokohama. Construction is scheduled from April 2026 through March 2027, funded with internal resources.Machinery & RoboticsYokohama, Kanagawa¥3.1BPlanned
2026.08.12Shikoku Bank8387Shikoku Bank to develop a new parking facility in Kochi CityShikoku Bank plans to invest ¥1.34 billion in a parking facility in Kochi City, funded internally. Construction began in October 2025 and is scheduled for completion in October 2026.OtherKochi, Kochi¥1.3BBuilding
2026.08.12Shin-Nippon Industries Sdn. Bhd.3951Shin-Nippon Industries to build printing-packaging materials factory in JohorShin-Nippon Industries Sdn. Bhd. is building a factory and installing manufacturing equipment for printed packaging materials in Johor, Malaysia. The project has a total planned investment of JPY 3 billion, with construction scheduled from August 2024 to June 2026.Paper & PulpJohor, Malaysia¥3BBuilding
2026.08.12Shindengen India Private Limited6844Shindengen India to install electrical-component production equipment at factories in KarnatakaShindengen India Private Limited plans a ¥1.423 billion investment in electrical-component production equipment and related facilities at factories and other sites in Karnataka and elsewhere in India. Construction is scheduled to begin in April 2026 and finish in March 2027, funded through internal funds, parent-company borrowing and leasing.Automotive & TransportKarnataka¥1.4BPlanned
2026.08.12SKY Perfect JSAT Corporation9412SKY Perfect JSAT to deploy JSAT-31 communications satellite in geostationary orbitSKY Perfect JSAT plans to invest JPY 49.0 billion in the JSAT-31 communications satellite, to be positioned in geostationary orbit above the equator. Construction or development began in May 2024, with completion planned for the second half of 2029; JPY 13.892 billion had already been paid at the disclosure date.TelecomOuter space¥49BBuilding
2026.08.12SKY Perfect JSAT Corporation9412SKY Perfect JSAT to deploy JSAT-32 communications satellite in geostationary orbitSKY Perfect JSAT plans to invest ¥33 billion in the JSAT-32 communications satellite system in geostationary orbit above the equator. Construction began in February 2025, with completion planned for the second half of 2027; ¥21.256 billion had already been paid at the disclosure date.TelecomOuter space¥33BBuilding
2026.08.12SKY Perfect JSAT Corporation9412SKY Perfect JSAT to deploy space-based optical telescope in geostationary orbitSKY Perfect JSAT plans to deploy an optical telescope in geostationary orbit above the equator as part of its space business. Construction/development began in July 2020, with completion scheduled for the second half of 2027 or later; the total planned investment is ¥8 billion.R&D FacilitiesOuter space¥8BPlanned
2026.08.12SKY Perfect JSAT Corporation9412SKY Perfect JSAT to deploy Superbird-9 communications satellite in geostationary orbitSKY Perfect JSAT is investing in the Superbird-9 communications satellite, located in geostationary orbit above the equator. The total planned investment is ¥22 billion, with work begun in March 2021 and completion scheduled for the first half of 2028.TelecomOuter space¥22BBuilding
2026.08.12SMC Corporation6273SMC China Manufacturing plans R&D and production equipment investment in BeijingSMC China Manufacturing, a subsidiary of Japan-listed SMC Corporation, plans a ¥2.3 billion investment in R&D and production equipment at its Beijing facility. The disclosure does not specify construction timing, completion timing, or added capacity.Machinery & RoboticsBeijing, China¥2.3BPlanned
2026.08.12SMC Corporation6273SMC China plans logistics equipment investment at Changzhou facilitySMC China plans to invest ¥7.6 billion in logistics equipment at its Changzhou, China facility. The filing does not disclose the construction schedule, contractor, equipment vendors, or resulting capacity increase.Logistics FacilitiesChangzhou, China¥7.6BPlanned
2026.08.12SMC Corporation6273SMC Corporation to invest in production and logistics equipment at Vietnam Dong Nai siteSMC Corporation plans to invest ¥17.1 billion in production and logistics equipment at its manufacturing site in Dong Nai, Vietnam. The disclosure does not specify the construction schedule or the additional capacity expected after completion.Machinery & RoboticsDong Nai, Vietnam¥17.1BPlanned
2026.08.12SMC Corporation6273SMC plans production equipment investment at Beijing manufacturing siteSMC plans to invest JPY 3.9 billion in production equipment at its Beijing manufacturing site in China. The disclosure does not specify the construction schedule or the resulting capacity increase.Machinery & RoboticsBeijing, China¥3.9BPlanned
2026.08.12SMC Corporation6273SMC plans production equipment investment at Tianjin factorySMC plans to invest JPY 3.6 billion in production equipment at its Tianjin factory in China. The disclosure lists the project as a planned facility investment, but does not provide a construction schedule or additional production capacity.Machinery & RoboticsTianjin, China¥3.6BPlanned
2026.08.12SoftBank Group Corp.9984SoftBank Group to build data centers and solar power plants in Texas and CaliforniaSoftBank Group plans to develop data centers and solar power plants through EnergyGlobal, LP in Texas and California, United States. Construction is scheduled to begin in April 2026 and finish in December 2028, financed through project finance and other methods.Data CentersUnited States$16.4BPlanned
2026.08.12Somar North America Corporation8152Somar North America to build factory in West VirginiaSomar North America Corporation is investing JPY 2.541 billion to build a factory in West Virginia, United States, for its high-performance materials business. Construction began in April 2024 and completion is planned for April 2029; no post-completion capacity increase is disclosed.Materials & ChemicalsWest Virginia¥2.5BBuilding
2026.08.12Stella Chemifa Corporation4109Stella Chemifa to expand semiconductor chemical filling equipment at Sanbo PlantStella Chemifa plans to install semiconductor-grade high-purity chemical filling equipment for small and medium-sized containers at its Sanbo Plant in Sakai, Osaka. The project has a total planned investment of ¥6.22 billion, with construction scheduled from January 2023 through September 2027 and funded through internal funds and borrowings.Semiconductors & ElectronicsSakai, Osaka¥6.2BBuilding
2026.08.12Sumitomo Warehouse Co., Ltd.9303Sumitomo Warehouse plans warehouse development site in Hanyu, SaitamaSumitomo Warehouse plans to develop a warehouse construction site in Hanyu, Saitama, under its logistics business. The filing does not disclose the investment amount, construction schedule, contractor, or planned capacity.Logistics FacilitiesHanyu, Saitamanot disclosedPlanned
2026.08.12Suncall Technologies Co., Ltd.5985Suncall Technologies to install production equipment at Shenzhen facilitySuncall Technologies plans to invest ¥1.792 billion in production equipment at its Shenzhen, China facility. The project is scheduled for completion in December 2026 and will be funded internally; no capacity increase is disclosed.Other ManufacturingShenzhen, China¥1.8BPlanned
2026.08.12Takasago International Corporation4914Takasago International Indonesia to install fragrance production equipment in BantenPT. Takasago International Indonesia, a subsidiary of Takasago International Corporation, plans a total investment of ¥1.729 billion in fragrance production equipment in Banten, Indonesia. Construction began in January 2024 and completion is scheduled for August 2026; no post-completion capacity increase was disclosed.Materials & ChemicalsBanten¥1.7BBuilding
2026.08.12Takasago International Corporation4914Takasago International Singapore to install new fragrance production equipmentTakasago International Singapore plans to invest JPY 3.517 billion in fragrance production equipment at its Singapore operation. Construction is scheduled to begin in July 2026 and be completed in June 2028, funded internally.Materials & ChemicalsSingapore¥3.5BPlanned
2026.08.12Takasago International Corporation4914Takasago International to install fragrance production equipment at Zulpich, GermanyTakasago Europe GmbH plans to invest JPY 1.344 billion in fragrance production equipment at its Zulpich, Germany site. Construction is scheduled to start in November 2026 and be completed in September 2027, funded internally; no post-investment capacity increase is disclosed.Materials & ChemicalsZulpich, Germany¥1.3BPlanned
2026.08.12Tamura Corporation6768Tamura Power Technologies de Mexico to install production equipment in Baja CaliforniaTamura Power Technologies de Mexico plans to invest in production equipment and related assets at its facility in Baja California, Mexico. The investment is scheduled to begin in October 2026 and be completed in March 2028, funded through borrowing.Semiconductors & ElectronicsBaja California¥1.1BPlanned
2026.08.12Techno Horizon Co., Ltd.6629Techno Horizon to renew robotics production equipment at Nagoya headquarters factoryTechno Horizon plans to renew production equipment for its robotics business at its headquarters factory in Minami Ward, Nagoya. The project is scheduled for completion in September 2026; the planned total investment amount and post-completion capacity increase are not disclosed.Machinery & RoboticsNagoya, Aichinot disclosedPlanned
2026.08.12Technoquartz Vietnam Co., Ltd.255ATechnoquartz Vietnam to build machining plant in Ninh BinhTechnoquartz Vietnam Co., Ltd. is investing JPY 5 billion to build a machining plant in Ninh Binh Province, Vietnam, for its semiconductor business. Construction began in May 2025 and is scheduled for completion in December 2026, with production capacity expected to increase after completion.Semiconductors & ElectronicsNinh Binh Province¥5BBuilding
2026.08.12Teika Co., Ltd.4027Teika to install conductive polymer chemical production equipment at Osaka PlantTeika plans to invest in conductive polymer chemical production equipment at its Osaka Plant in Taisho-ku, Osaka. The project is scheduled to start in December 2024 and be completed in March 2027, funded through internal funds and borrowings.Materials & ChemicalsOsaka, Osaka¥1.5BBuilding
2026.08.12Thai Summit PK Corporation Ltd.7246Thai Summit PK to install frame production equipment at its Rayong factoryThai Summit PK Corporation will invest JPY 2.216 billion in frame production equipment at its headquarters and factory in Rayong Province, Thailand. Construction began in November 2025 and completion is scheduled for March 2028; the disclosure does not state the resulting capacity increase.Automotive & TransportRayong, Thailand¥2.2BBuilding
2026.08.12THAISUMMITPKKCO.,LTD.7246THAISUMMITPKK to install frame production equipment at Chonburi plantTHAISUMMITPKKCO.,LTD. is investing ¥2.6 billion in frame production equipment at its headquarters and factory in Chonburi, Thailand. Construction began in April 2024 and is scheduled for completion in August 2026; the disclosure does not state the resulting capacity increase.Automotive & TransportChonburi¥2.6BBuilding
2026.08.12Tokyo Radiator Manufacturing Co., Ltd.7235Tokyo Radiator Manufacturing to install heat-exchanger manufacturing equipment in ChongqingTokyo Radiator Manufacturing plans to install heat-exchanger manufacturing equipment at Chongqing Tokyo Radiator Co., Ltd. in Chongqing, China. Construction is scheduled from January through December 2026, funded internally; no investment amount or capacity increase is disclosed.Automotive & TransportChongqing, Chinanot disclosedPlanned
2026.08.12Tokyo Radiator Manufacturing Co., Ltd.7235Tokyo Radiator Manufacturing to install heat-exchanger manufacturing equipment in WuxiTokyo Radiator Manufacturing plans to install heat-exchanger manufacturing equipment at its Wuxi subsidiary in Jiangsu, China. The project is scheduled to start in January 2026 and be completed in December 2026; no investment amount or capacity increase is disclosed.Automotive & TransportWuxi, Jiangsunot disclosedBuilding
2026.08.12Tokyo Steel Manufacturing Co., Ltd.5423Tokyo Steel to invest ¥10 billion in plating-line modification at Okayama WorksTokyo Steel Manufacturing plans an approximately ¥10 billion investment to modify the plating line at its Okayama Works in Kurashiki. The disclosure does not provide a construction schedule, contractor, equipment supplier, or post-investment capacity increase.Steel & Non-ferrous MetalsKurashiki, Okayama¥10BPlanned
2026.08.12Topre India Private Limited5975Topre India to expand automotive press-parts plant in Ahmedabad, GujaratTopre India Private Limited plans to add production equipment and expand its manufacturing facilities for automotive pressed parts at its head plant in Ahmedabad, Gujarat, India. The project has a total planned investment of JPY 2.134 billion, with construction scheduled from August 2025 through March 2027.Automotive & TransportAhmedabad, Gujarat¥2.1BBuilding
2026.08.12Toyo Seikan (Thailand) Co., Ltd.5901Toyo Seikan Thailand to install beverage PET bottle filling equipment at Ayutthaya headquarters plantToyo Seikan (Thailand) Co., Ltd. plans to invest JPY 9.369 billion in beverage PET bottle filling equipment and related facilities at its headquarters plant in Ayutthaya Province, Thailand. Construction is scheduled from August 2025 through December 2026, funded internally.Food & BeverageAyutthaya, Thailand¥9.4BBuilding
2026.08.12TPR Auto Parts MFG. India Co., Ltd.6463TPR Auto Parts MFG. India to expand cylinder liner production capacity in RajasthanTPR Auto Parts MFG. India, a subsidiary of Japanese-listed TPR Co., will invest in cylinder liner production equipment and related facilities in Rajasthan, India. Construction began in April 2025, with completion planned for March 2027 and capacity expected to increase by 30%.Automotive & TransportRajasthan¥1.5BBuilding
2026.08.12Tsumura & Co.4540Tsumura to build a third crude-drug warehouse at Ishioka CenterTsumura plans to construct a third crude-drug warehouse at its Ishioka Center. The project has a total planned investment of ¥13.5 billion, with construction scheduled from April 2025 to April 2029.Logistics FacilitiesIshioka, Ibaraki¥13.5BBuilding
2026.08.12Tsumura & Co.4540Tsumura to build fourth SD production building at Ibaraki FactoryTsumura plans to invest ¥26.763 billion in production facilities for the fourth SD building at its Ibaraki Factory. Construction began in March 2024 and is scheduled for completion in October 2027; the disclosure does not state the resulting capacity increase.Pharma & MedicalIbaraki¥26.8BBuilding
2026.08.12Tsumura & Co.4540Tsumura to build third crude-drug warehouse at Ibaraki PlantTsumura plans to construct a third crude-drug warehouse at its Ibaraki Plant. Construction began in July 2024, with completion scheduled for March 2027; the total planned investment is ¥6.91 billion.Pharma & MedicalIbaraki¥6.9BBuilding
2026.08.12Tsumura Co., Ltd.4540Tsumura to expand Ibaraki Plant with granulation and packaging buildingTsumura plans to invest in production equipment for a new granulation and packaging building at its Ibaraki Plant. Construction began in April 2025 and completion is scheduled for July 2028, with total planned investment of ¥43.361 billion.Pharma & MedicalIbaraki¥43.4BBuilding
2026.08.12Tsumura & Co.4540Tsumura to expand Tianjin pharmaceutical production with Phase 3 manufacturing buildingTsumura's Chinese subsidiary, Tianjin Tsumura Pharmaceutical, is investing in a Phase 3 manufacturing building and production equipment in Tianjin, China. The project began in May 2023 and is scheduled for completion in July 2026, with total planned investment of ¥13.514 billion.Pharma & MedicalTianjin, China¥13.5BBuilding
2026.08.12Unipres America5949Unipres America to renew production equipment and strengthen production systems at its U.S. factoryUnipres America, a subsidiary of Unipres Corporation, plans to renew production equipment in connection with a model change and strengthen its production system at its headquarters and factory in the United States. The project is scheduled to start in April 2026 and be completed by March 2027, with a total planned investment of JPY 1.6 billion.Automotive & TransportUnited States¥1.6BPlanned
2026.08.12Unipres Corporation5949Unipres Guangzhou to renew production equipment and strengthen production capacity for model changesUnipres Guangzhou plans to invest JPY 1 billion in production-equipment renewal and production-system strengthening at its headquarters and factory in China in connection with model changes. Construction or installation is scheduled to run from January through December 2026, funded internally.Automotive & TransportChina¥1BPlanned
2026.08.12Unipres Corporation5949Unipres Mexico to renew production equipment and strengthen production capacity for model changesUnipres Mexico plans to renew production equipment and strengthen its production system at its headquarters and factory in Mexico to support model changes. The project is scheduled to begin in January 2026 and be completed in December 2026, with planned investment of ¥2 billion funded internally.Automotive & TransportMexico¥2BPlanned
2026.08.12Unipres Corporation5949Unipres UK to renew production equipment and strengthen manufacturing capacity for model changesUnipres UK plans to invest in production-equipment renewal and strengthen its production system at its headquarters and factory in the United Kingdom in response to model changes. The project is scheduled to start in January 2026 and be completed in December 2026, with total planned investment of JPY 1.1 billion.Automotive & TransportUnited Kingdom¥1.1BPlanned
2026.08.12Unitika Ltd.3103Unitika plans nylon film production equipment at P.T. EMBLEMASIA in IndonesiaUnitika's Indonesian subsidiary P.T. EMBLEMASIA plans a capital investment in nylon film production equipment. The filing identifies the facility and country but discloses no investment amount, schedule, or added capacity.Materials & ChemicalsIndonesianot disclosedPlanned
2026.08.12Valqua, Ltd.7995Valqua to establish Well-being Innovation Square R&D facility in Koto, TokyoValqua is investing JPY 1.499 billion in Well-being Innovation Square, a research and development facility in Koto, Tokyo. Construction began in May 2025 and is scheduled for completion in June 2026, funded with internal resources; no capacity increase is disclosed.R&D FacilitiesKoto, Tokyo¥1.5BBuilding
2026.08.12VALQUA Vietnam Co., Ltd. and VALQUA Advanced Vietnam Co., Ltd.7995VALQUA Vietnam to expand production facilities at Hai Duong headquarters factoryVALQUA's Vietnamese subsidiaries, VALQUA Vietnam Co., Ltd. and VALQUA Advanced Vietnam Co., Ltd., are investing in production equipment and related facilities at their headquarters factory in Hai Duong, Vietnam. The project started in July 2023 and is scheduled for completion in July 2027, with total planned investment of ¥6.485 billion.Materials & ChemicalsHai Duong, Vietnam¥6.5BBuilding
2026.08.12Sansei Technologies, Inc.6357Vekoma Rides to expand office and factory facilities in LimburgVekoma Rides B.V., a subsidiary of Sansei Technologies, plans new investment in office and factory facilities in Limburg, the Netherlands. Construction began in April 2024 and is scheduled for completion in early 2027; the post-completion capacity increase is still being calculated.Other ManufacturingLimburgnot disclosedBuilding
2026.08.12WDB Holdings Co., Ltd.2475WDB Holdings to develop buildings at Rokko Training Center in KobeWDB Holdings plans to invest in buildings and related facilities at its Rokko Training Center in Nada Ward, Kobe. Construction began in November 2025 and is scheduled for completion in October 2027, funded with internal resources.R&D FacilitiesKobe, Hyogo¥1.8BBuilding
2026.08.12WUXI ALPS Electronics Co., Ltd.6770WUXI ALPS Electronics to install manufacturing equipment at its headquarters factory in WuxiWUXI ALPS Electronics plans to invest JPY 6.673 billion in manufacturing equipment at its headquarters factory in Wuxi, Jiangsu, China. The company plans to begin the investment in April 2026 and complete it by March 2027, funded internally.Semiconductors & ElectronicsWuxi, Jiangsu¥6.7BPlanned
2026.08.12Yamada Corporation6392Yamada Corporation to build office, sales facility and warehouse in IllinoisYamada Corporation plans to invest in a new office, sales facility and warehouse for its U.S. subsidiary, Yamada America Inc., in Illinois. Construction is scheduled to begin in April 2026 and finish in February 2027, funded through borrowings; the company says the resulting capacity increase cannot be reasonably quantified.Logistics FacilitiesIllinois¥3.2BPlanned
2026.08.12Yamato Kogyo Co., Ltd.5444Yamato Kogyo to expand heavy rolling line at Bekasi steel plantYamato Kogyo's Indonesian subsidiary PT Garuda Yamato Steel plans to expand the heavy rolling line at its Bekasi factory. The project is intended to improve productivity and quality and broaden the product lineup, with construction beginning in January 2026 and completion planned in FY2027.Steel & Non-ferrous MetalsBekasi, Indonesia¥16BPlanned
2026.08.12Yasunaga Co., Ltd.7271Yasunaga Mexico to expand engine-parts production capacity in JaliscoYasunaga Mexico, a subsidiary of Japanese listed company Yasunaga Co., Ltd., plans to install production equipment at its Jalisco, Mexico facility. The project is expected to increase production capacity by 51%, with construction beginning in February 2026 and completion scheduled for June 2027.Automotive & TransportJalisco¥1.8BPlanned
2026.08.12Yorozu Corporation7294Yorozu to install new-vehicle launch equipment at its Tennessee subsidiaryYorozu plans to invest JPY 1.053 billion in new equipment at Yorozu Automotive Tennessee in the United States to support the launch of new vehicle models. The project began in October 2024 and is scheduled for completion in September 2026, funded through borrowing.Automotive & TransportUnited States¥1.1BBuilding
2026.08.12Zenit International S.p.A.6351Zenit International to improve productivity and expand its Modena plantZenit International S.p.A. plans to improve productivity at its existing plant in Modena, Italy, and construct an additional building. The project has a total planned investment of JPY 1.742 billion, with work scheduled to begin in June 2026 and finish in November 2028.Other ManufacturingModena, Emilia-Romagna¥1.7BPlanned
2026.08.12Zenrin Co., Ltd.9474Zenrin to invest in time-spatial database production system in KitakyushuZenrin plans to invest ¥1.258 billion in a time-spatial database production system at its System Development Headquarters and other facilities in Tobata Ward, Kitakyushu. The disclosure does not specify the construction schedule, contractor, equipment vendor, or post-investment capacity.R&D FacilitiesKitakyushu, Fukuoka¥1.3BPlanned
2026.08.11Aioi Eco Service Co., Ltd.9336Aioi Eco Service to build shredding and incineration facilities in AioiAioi Eco Service, a Daiei Kankyo subsidiary, plans to build shredding and incineration facilities in Aioi, Hyogo. Construction is scheduled to start in April 2026 and finish in November 2028, adding 1,015 tonnes per day of shredding capacity and 220 tonnes per day of incineration capacity; the filing does not disclose the investment amount.OtherAioi, Hyogonot disclosedPlanned
2026.08.11AZ-COM Maruwa Holdings Co., Ltd.9090AZ-COM Maruwa Holdings to add cold-storage and elevator equipment at Matsubushi EASTAZ-COM Maruwa Holdings plans additional investment in refrigeration and freezing equipment and elevator systems at its AZ-COM Matsubushi EAST logistics facility in Matsubushi, Saitama. The project is expected to improve logistics capacity, with construction scheduled from February 2026 through February 2027.Logistics FacilitiesMatsubushi, Saitama¥1.7BPlanned
2026.08.11AZ-COM Maruwa Holdings Co., Ltd.9090AZ-COM Maruwa Holdings to expand logistics center capacity at AZ-COM Matsubushi WESTAZ-COM Maruwa Holdings plans a ¥48.9 billion investment in logistics center equipment at AZ-COM Matsubushi WEST in Matsubushi, Saitama. Construction began in March 2026 and is scheduled for completion in September 2028, increasing logistics capacity.Logistics FacilitiesMatsubushi, Saitama¥48.9BBuilding
2026.08.11Daiei Kankyo Co., Ltd.9336Daiei Kankyo to build incineration facility at Izumi Recycling CenterDaiei Kankyo plans to build an incineration facility at its Izumi Recycling Center in Izumi, Osaka. The project has a planned investment of ¥9.5 billion and is scheduled for completion in April 2030, adding 220 tonnes per day of capacity.Power & EnergyIzumi, Osaka¥9.5BPlanned
2026.08.11Daiei Kankyo Co., Ltd.9336Daiei Kankyo to build waste-incineration facility at Nishinomiya Recycling CenterDaiei Kankyo plans to invest ¥9.5 billion in a waste-incineration facility at its Nishinomiya Recycling Center in Nishinomiya, Hyogo. Construction began in May 2025, with completion scheduled for November 2028; the facility will add 220 tonnes per day of processing capacity.Power & EnergyNishinomiya, Hyogo¥9.5BBuilding
2026.08.11DINS Kansai Co., Ltd.9336DINS Kansai to build RPF plastic-recycling facility at RAC site in SakaiDINS Kansai, part of the Daiei Kankyo group, will build a refuse paper and plastic fuel (RPF) recycling facility at its RAC site in Sakai, Osaka. The ¥1.016 billion project runs from January 2025 to April 2026 and gives the site a processing capacity of 197.76 tonnes per day.Materials & ChemicalsSakai, Osaka¥1BBuilding
2026.08.11Enplas Semiconductor Equipment Co., Ltd.6961Enplas Semiconductor Equipment to invest in machinery and tooling assets in SaitamaEnplas Semiconductor Equipment plans to invest JPY 1.454 billion in machinery, tooling assets, software and measuring instruments at its site in Saitama City, Saitama. The project is scheduled to begin in April 2026 and be completed by March 2027, funded internally.Semiconductors & ElectronicsSaitama, Saitama¥1.5BPlanned
2026.08.11Enplas Corporation6961Enplas to expand semiconductor facilities in Kawaguchi, SaitamaEnplas plans to invest in buildings, auxiliary facilities, machinery, molds, software, measuring instruments and other assets for its Semiconductor business in Kawaguchi, Saitama. The project is scheduled to begin in April 2026 and be completed by March 2027, funded with internal resources; no post-completion capacity increase is disclosed.Semiconductors & ElectronicsKawaguchi, Saitama¥3.7BPlanned
2026.08.11Fuji Oozx Inc.7299Fuji Oozx to install engine valve production equipment at Shizuoka plantFuji O-Zex plans to invest in new engine valve production equipment at its head office and Shizuoka plant in Kikugawa, Shizuoka. The project is scheduled to begin in March 2026 and be completed in March 2027, funded internally, with a planned investment of approximately JPY 1.04 billion.Automotive & TransportKikugawa, Shizuoka¥1BPlanned
2026.08.11Hizen Environment Co., Ltd.9336Hizen Environment to build controlled landfill in Imari, SagaHizen Environment plans to develop a controlled landfill facility in Imari, Saga, as part of Daiei Kankyo's environment-related business. Construction is scheduled to start in September 2026 and finish in October 2028, adding 1,104,632 cubic meters of capacity; the planned investment amount is undisclosed.OtherImari, Saganot disclosedPlanned
2026.08.11Idemitsu Kosan Co., Ltd.5019Idemitsu Kosan to build Innovation Center integrated research facility in IchiharaIdemitsu Kosan plans to invest ¥83.4 billion in the Innovation Center, a new integrated research facility at its Chiba operations and other sites. Construction began in March 2025, with completion scheduled for March 2028; the disclosure reports no quantified post-completion capacity increase.R&D FacilitiesIchihara, Chiba¥83.4BBuilding
2026.08.11Idemitsu Kosan Co., Ltd.5019Idemitsu Kosan to invest in petroleum refining facilities in Ichihara and other Chiba locationsIdemitsu Kosan plans a JPY 39.459 billion investment in petroleum refining facilities at its Chiba business site in Ichihara and other locations. Construction is scheduled from April 2026 through March 2027, funded through internal funds and borrowings.Power & EnergyIchihara, Chiba¥39.5BPlanned
2026.08.11Idemitsu Kosan Co., Ltd.5019Idemitsu Kosan to upgrade petrochemical production facilities at Chiba sitesIdemitsu Kosan plans to invest JPY 8.611 billion in petrochemical product manufacturing facilities at its Chiba Business Office and other sites in Ichihara, Chiba. Construction is scheduled from April 2026 through March 2027, funded through internal funds and borrowings.Materials & ChemicalsIchihara, Chiba¥8.6BPlanned
2026.08.11Idemitsu Tanker Co., Ltd.5019Idemitsu Tanker to commission an environmentally friendly VLCCIdemitsu Tanker plans to invest in an environmentally friendly very large crude carrier (VLCC), with construction scheduled from March 2025 to June 2029. The project is listed under Idemitsu Kosan's fuel oil segment and will be funded through internal funds and borrowings.Automotive & TransportChiyoda, Tokyo¥44.3BPlanned
2026.08.11Innovex Co., Ltd.7940Innovex to install packaging-material production equipment at Koga plantInnovex plans to invest JPY 1.285 billion in packaging-material production equipment at its Koga plant in Ibaraki, Japan. Construction began in September 2024 and is scheduled for completion in February 2028, funded by internal funds and borrowings.Materials & ChemicalsKoga, Ibaraki¥1.3BBuilding
2026.08.11Komatsu Wall Industry Co., Ltd.7949Komatsu Wall Industry to build new Kaga factory and R&D buildingKomatsu Wall Industry plans to construct a new factory, install machinery and build an R&D facility at the planned Kaga Plant No. 2 in Kaga, Ishikawa. The project has a total planned investment of JPY 9.5 billion, with construction begun in May 2025 and completion scheduled for April 2027.Other ManufacturingKaga, Ishikawa¥9.5BBuilding
2026.08.11KR Energy 1 LLC3133KR Energy 1 to develop solar power generation facilities in Ibaraki and elsewhereKR Energy 1 LLC is developing solar power generation facilities in Ibaraki Prefecture and other locations as part of its renewable energy business. The planned total investment is ¥3.073 billion, with construction scheduled from July 2024 through September 2026 and ¥2.102 billion already paid.Power & EnergyIbaraki¥3.1BBuilding
2026.08.11Lintec Corporation7966Lintec to reconstruct Ina Technology Center in SaitamaLintec plans a ¥2.45 billion reconstruction project at its Ina Technology Center in Ina, Saitama. Construction began in November 2024 and is scheduled for completion in September 2026, funded internally; no post-project capacity increase is disclosed.R&D FacilitiesIna, Saitama¥2.5BBuilding
2026.08.11Meicon Co., Ltd.9072Meicon to build new warehouse at Komaki Kita Sales Office in KomakiMeicon, a Nippon Konpo group warehousing company, will build a new warehouse at its Komaki Kita Sales Office in Komaki, Aichi. The ¥4 billion project runs from September 2025 to November 2027 and adds 13,000 sqm of warehouse space.Logistics FacilitiesKomaki, Aichi¥4BBuilding
2026.08.11Meiko Elec Develop Co., Ltd.6787Meiko Elec Develop to expand production equipment in YonezawaMeiko Elec Develop, a subsidiary of Meiko Co., Ltd., plans to install production equipment at its facility in Yonezawa, Yamagata. The project is intended to increase production and improve operational efficiency, with construction scheduled from April 2026 through March 2027.Semiconductors & ElectronicsYonezawa, Yamagata¥1.1BPlanned
2026.08.11Meiko Elec Manufacture Co., Ltd.6787Meiko Elec Manufacture to expand production equipment in NanyoMeiko Elec Manufacture plans to invest JPY 1.4 billion in production equipment at its facility in Nanyo, Yamagata. The project is intended to strengthen production capacity and improve operational efficiency, with work scheduled from April 2026 through March 2027.Semiconductors & ElectronicsNanyo, Yamagata¥1.4BPlanned
2026.08.11Meiko Electronics Co., Ltd.6787Meiko to install production equipment at Kahoku Factory in YamagataMeiko plans to invest ¥2.4 billion in new production equipment at its Kahoku Factory in Kahoku, Yamagata. Construction is scheduled to begin in April 2026 and finish in March 2027, with the project intended to expand production and improve operating efficiency.Semiconductors & ElectronicsKahoku, Yamagata¥2.4BPlanned
2026.08.11Meiko Electronics Co., Ltd.6787Meiko to install production equipment at Tendo FactoryMeiko plans to invest JPY 4.5 billion in production equipment at its Tendo Factory in Tendo, Yamagata. Construction is scheduled from April 2026 through March 2027, with the project intended to increase production capacity.Semiconductors & ElectronicsTendo, Yamagata¥4.5BPlanned
2026.08.11Meiko Electronics Co., Ltd.6787Meiko to install R&D equipment at its Kanagawa factoryMeiko plans to invest in research and development equipment at its headquarters and Kanagawa factory in Ayase, Kanagawa. The project will support prototype circuit-board development and is scheduled to run from April 2026 through March 2027, funded by internal resources and borrowings.Semiconductors & ElectronicsAyase, Kanagawa¥2.4BPlanned
2026.08.11Mie Kotsu Co., Ltd.3232Mie Kotsu to invest in 32 new buses for its Kuwana office and other sitesMie Kotsu plans to invest JPY 1.222 billion in 26 route buses and six charter buses for its Kuwana office and other locations in Mie Prefecture. The fleet investment is scheduled to begin in April 2026 and be completed by March 2027, using internal funds and borrowings.Automotive & TransportKuwana, Mie¥1.2BPlanned
2026.08.11Mikuni Corporation7247Mikuni to install production equipment at Kikugawa siteMikuni plans to invest in production equipment at its Kikugawa business site in Kikugawa, Shizuoka, for its Mobility business. The project has a total planned investment of JPY 1.277 billion, with work scheduled from April 2026 through March 2027; no capacity increase is disclosed.Automotive & TransportKikugawa, Shizuoka¥1.3BPlanned
2026.08.11Mikuni Corporation7247Mikuni to invest ¥2.536 billion in Odawara site and research facilitiesMikuni plans to invest ¥2.536 billion in site facilities and research equipment at its Odawara establishment in Kanagawa. Construction is scheduled from April 2026 through March 2027 and will be funded through internal funds and borrowings.R&D FacilitiesOdawara, Kanagawa¥2.5BPlanned
2026.08.11Mitsubishi Nagasaki Machinery Co., Ltd.5632Mitsubishi Nagasaki Machinery to build Phase 1 of new factory in NagasakiMitsubishi Nagasaki Machinery plans to construct the first phase of a new factory in Nagasaki City, Nagasaki, to increase production capacity for its equipment and machinery business. The project has a planned total investment of ¥2.33 billion, with construction scheduled from August 2025 to March 2027.Machinery & RoboticsNagasaki, Nagasaki¥2.3BPlanned
2026.08.11Mitsubishi Nagasaki Machinery Co., Ltd.5632Mitsubishi Nagasaki Machinery to build second-phase new factory in NagasakiMitsubishi Nagasaki Machinery plans to construct the second phase of a new factory in Nagasaki City, Nagasaki, to increase production capacity. The project has a planned total investment of ¥1.62 billion, with construction scheduled from January 2026 to January 2028.Machinery & RoboticsNagasaki, Nagasaki¥1.6BPlanned
2026.08.11Nichicon Ohno Co., Ltd.6996Nichicon Ohno to expand production equipment in Ono, FukuiNichicon Ohno plans to invest in new production equipment at its facilities in Ono, Fukui, for its capacitor business. The project is scheduled to start in January 2026 and be completed in May 2027, increasing production capacity by 20%.Semiconductors & ElectronicsOno, Fukui¥1.6BPlanned
2026.08.11Nippon Konpo Transport & Warehousing Co., Ltd.9072Nippon Konpo to build new motor pool at Toyohashi Sales Office in ToyokawaNippon Konpo Transport & Warehousing will build a new motor pool at its Toyohashi Sales Office in Toyokawa, Aichi. The ¥2.45 billion project runs from November 2025 to December 2027 and adds 43,000 sqm of site area.Logistics FacilitiesToyokawa, Aichi¥2.5BBuilding
2026.08.11Nippon Konpo Transport & Warehousing Co., Ltd.9072Nippon Konpo to build new warehouse at Utsunomiya Sales Office in SakuraNippon Konpo Transport & Warehousing will build a new warehouse at its Utsunomiya Sales Office in Sakura, Tochigi. The ¥1.987 billion project ran from April 2024 to August 2026, adding 6,000 sqm of warehouse space.Logistics FacilitiesSakura, Tochigi¥2BBuilding
2026.08.11Nippon Konpo Transport & Warehousing Co., Ltd.9072Nippon Konpo Transport to build new motor pool in ChibaNippon Konpo Transport & Warehousing will build a new motor pool at its Narashino Sales Office in Chiba City. The ¥3.895 billion project runs from April 2026 to April 2030, adding 76,000 sqm of site area.Logistics FacilitiesChiba, Chiba¥3.9BPlanned
2026.08.11Sanyo Denki Philippines, Inc.6516Sanyo Denki Philippines to expand machinery and tooling at Subic TechnoparkSanyo Denki Philippines, a subsidiary of Japanese listed company Sanyo Denki, will expand machinery and tooling at its Subic Technopark facility in the Philippines. The investment totals JPY 1.1 billion, with work scheduled from April 2026 through March 2027.Semiconductors & ElectronicsSubic, Philippines¥1.1BPlanned
2026.08.11Sanyo Denki Co., Ltd.6516Sanyo Denki to strengthen machinery and tooling at Ueda facilitySanyo Denki plans to invest JPY 1 billion in machinery and tooling at its Ueda facility in Ueda, Nagano. The project is scheduled to begin in April 2026 and be completed by March 2027, supporting the company's San Ace, Electronics and Motion businesses.Semiconductors & ElectronicsUeda, Nagano¥1BPlanned
2026.08.11Sanyo Denki Vietnam Co., Ltd.6516Sanyo Denki Vietnam to build new factory in Hung Yen, VietnamSANYODENKI VIETNAM CO., LTD., a subsidiary of Japanese manufacturer Sanyo Denki, plans to establish a new factory in Hung Yen, Vietnam. The project represents a total planned investment of JPY 2.3 billion, with construction scheduled from July 2026 to July 2027.Machinery & RoboticsHung Yen, Vietnam¥2.3BPlanned
2026.08.11Seven Bank, Ltd.8410Seven Bank to invest ¥6.06 billion in ATMs across Tokyo and other locationsSeven Bank plans to invest ¥6.06 billion in ATM facilities at locations including Chiyoda, Tokyo, during fiscal 2026. The investment is scheduled to begin in April 2026 and be completed by March 2027, funded with internal resources.OtherChiyoda, Tokyo¥6.1BPlanned
2026.08.11SMC Corporation6273SMC plans ¥41.3 billion investment in production and logistics equipment in SaitamaSMC plans to invest ¥41.3 billion from internal funds in production and logistics equipment at facilities including Soka, Saitama. The filing does not disclose a construction schedule or incremental capacity.Machinery & RoboticsSoka, Saitama¥41.3BPlanned
2026.08.11Taiyo A&F Co., Ltd.1333Taiyo A&F to build a new purse seiner fishing vesselTaiyo A&F is investing JPY 3.972 billion in a new purse seine fishing vessel for its fisheries resources business. Construction began in April 2025 and is scheduled for completion in August 2026, increasing fish-catch cargo capacity by 1,088 tonnes.Other ManufacturingMinato, Tokyo¥4BBuilding
2026.08.11TEIKOKU Co., Ltd.6333TEIKOKU to acquire land for new factory in Tatsuno, HyogoTEIKOKU plans to acquire land in Tatsuno, Hyogo, for construction of a new factory. The company expects to invest JPY 2 billion, with work scheduled to start in December 2025 and completion planned for May 2029; no post-completion capacity increase is disclosed.Other ManufacturingTatsuno, Hyogo¥2BPlanned
2026.08.11Toho Keshima Smelting Co., Ltd.5707Toho Keshima Smelting to upgrade lead product facilities at Keshima SmelterToho Keshima Smelting, a Toho Zinc subsidiary, plans to invest ¥1.413 billion in lead product manufacturing equipment and related facilities at its Keshima Smelter in Osakikamijima, Hiroshima. Construction is scheduled from April 2026 through March 2027; the disclosure does not specify additional capacity.Steel & Non-ferrous MetalsOsakikamijima, Hiroshima¥1.4BPlanned
2026.08.11Yonex Co., Ltd.7906Yonex to build new badminton racket string factory in TateyamaYonex plans to build a new factory for badminton racket strings at its Toyama plant in Tateyama, Toyama. Construction is scheduled to start in August 2026 and finish in August 2027; the planned investment amount and added capacity have not been disclosed.Other ManufacturingTateyama, Toyamanot disclosedPlanned
2026.08.11ZACROS Corporation7917ZACROS to expand Numata site buildings and machinery for 30% more capacityZACROS plans to invest JPY 16.94 billion in buildings and machinery at its Numata site in Gunma Prefecture. Construction began in June 2024 and is scheduled for completion in the second half of fiscal 2026, increasing capacity by 30%.Semiconductors & ElectronicsNumata, Gunma¥16.9BBuilding
2026.08.11ZACROS Corporation7917ZACROS to triple Numata and Showa site capacity with new buildings and machineryZACROS plans a ¥13.0 billion investment in buildings, machinery and related equipment at its Numata Business Site in Numata, Gunma. Construction began in August 2023, with completion planned for the second half of fiscal 2028; post-completion capacity is expected to increase by 200%.Semiconductors & ElectronicsNumata, Gunma¥13BPlanned
2026.08.10Aichi Corporation6345Aichi Corporation to install production equipment at Isesaki facilityAichi Corporation plans to install production equipment at its Isesaki, Gunma facility for manufacturing aerial work platforms and related products. The project has a total planned investment of ¥3.5 billion, with work scheduled from April 2025 through September 2026 and funded with internal capital.Machinery & RoboticsIsesaki, Gunma¥3.5BBuilding
2026.08.10Aichi Corporation6345Aichi Corporation to invest ¥2 billion in production facilities in Ageo and elsewhereAichi Corporation plans to invest ¥2 billion in production facilities and related equipment at its company sites in Ageo, Saitama, and elsewhere. The investment is scheduled to run from April 2026 through March 2027 and will be funded with internal capital; no additional production capacity is disclosed.Machinery & RoboticsAgeo, Saitama¥2BPlanned
2026.08.10Alps Alpine Co., Ltd.6770Alps Alpine to expand manufacturing and R&D facilities at Iwaki Development CenterAlps Alpine plans to invest in manufacturing and research and development equipment at its Iwaki Development Center in Iwaki, Fukushima. The company expects construction and installation to run from April 2026 through March 2027, funded internally, with no post-investment capacity increase disclosed.Automotive & TransportIwaki, Fukushima¥14.3BPlanned
2026.08.10Alps Alpine Co., Ltd.6770Alps Alpine to invest ¥18.3 billion in manufacturing and R&D equipment in MiyagiAlps Alpine plans to invest ¥18.278 billion in manufacturing and R&D equipment at the Furukawa No. 2 Factory, the Sendai Development Center (Furukawa), and other facilities in Miyagi. Construction or installation is scheduled from April 2026 through March 2027, funded internally.Semiconductors & ElectronicsOsaki, Miyagi¥18.3BPlanned
2026.08.10Chari Lot Co., Ltd.2121Chari Lot to invest ¥8.3 billion in Ito Onsen Velodrome facilitiesChari Lot plans a total investment of ¥8.3 billion in facilities at Ito Onsen Velodrome in Ito, Shizuoka. Construction began in May 2025 and is scheduled for completion in August 2027; the disclosure does not specify additional capacity.OtherIto, Shizuoka¥8.3BBuilding
2026.08.10Chari Lot Co., Ltd.2121Chari Lot to renovate and expand facilities at Takamatsu VelodromeChari Lot plans a ¥5.3 billion investment in facilities at Takamatsu Velodrome in Takamatsu, Kagawa. Construction is scheduled to start in November 2026 and finish in the first half of 2028; the disclosure reports no incremental capacity after completion.OtherTakamatsu, Kagawa¥5.3BPlanned
2026.08.10Dai-ichi Kogyo Seiyaku Co., Ltd.4461Dai-ichi Kogyo Seiyaku to add water-based battery-anode binder production equipment at Yokkaichi plantDai-ichi Kogyo Seiyaku plans to invest ¥2.843 billion in new manufacturing equipment for water-based composite binders for battery anodes and related products at its Kasumi district facility in Yokkaichi, Mie. Construction began in April 2025 and is scheduled for completion in March 2027, adding 250 tonnes per month of capacity.Materials & ChemicalsYokkaichi, Mie¥2.8BBuilding
2026.08.10Ibiden Co., Ltd.4062Ibiden to expand production equipment at Kawama site in OgakiIbiden plans a total investment of ¥179.5 billion in production equipment at its Kawama site in Ogaki, Gifu. Construction began in March 2022 and is scheduled for completion in June 2029; the disclosure does not state the resulting capacity increase.Semiconductors & ElectronicsOgaki, Gifu¥179.5BBuilding
2026.08.10Ibiden Co., Ltd.4062Ibiden to install production equipment at its Ogaki facilityIbiden plans to invest ¥36.1 billion in new production equipment at its Ogaki Business Site in Ogaki, Gifu. Construction began in February 2026 and completion is scheduled for June 2029, funded with internal resources.Semiconductors & ElectronicsOgaki, Gifu¥36.1BBuilding
2026.08.10Ibiden Co., Ltd.4062Ibiden to install production equipment at Ono site in GifuIbiden plans to invest ¥192.8 billion in production equipment at its Ono site in Gifu Prefecture. Construction began in March 2026 and is scheduled for completion in June 2029; the disclosure does not specify the added production capacity.Semiconductors & ElectronicsOno, Gifu¥192.8BBuilding
2026.08.10Imasen Electric Industrial Co., Ltd.7266Imasen Electric Industrial to expand buildings and production equipment at Hiroshima plantImasen Electric Industrial plans to invest in buildings and production equipment at its Hiroshima plant in Higashi-Hiroshima, Hiroshima. The project is scheduled to begin in March 2026 and be completed in March 2027, funded through internal funds and borrowings.Automotive & TransportHigashi-Hiroshima, Hiroshima¥1.8BPlanned
2026.08.10Imasen Electric Industrial Co., Ltd.7266Imasen Electric Industrial to invest in building and production equipment at Gifu PlantImasen Electric Industrial plans to invest ¥1.212 billion in buildings and production equipment at its Gifu Plant in Yaotsu, Gifu. Construction is scheduled to run from March 2026 to March 2027, funded through internal funds and borrowings; no post-investment capacity increase is disclosed.Automotive & TransportYaotsu, Gifu¥1.2BPlanned
2026.08.10The Japan Steel Works, Ltd.5631Japan Steel Works to build central R&D facility in KashiwaJapan Steel Works plans to build a central research and development facility in Kashiwa, Chiba. Construction began in April 2025 and is scheduled for completion in December 2027; the total planned investment has not been disclosed.R&D FacilitiesKashiwa, Chibanot disclosedBuilding
2026.08.10The Japan Steel Works, Ltd.5631Japan Steel Works to build machinery plant at Hiroshima WorksJapan Steel Works plans to invest JPY 5.4 billion in a new machinery plant at its Hiroshima Works in Aki Ward, Hiroshima. Construction began in August 2024 and is scheduled for completion in June 2027; the filing does not disclose additional production capacity.Machinery & RoboticsAki Ward, Hiroshima¥5.4BBuilding
2026.08.10The Japan Steel Works, Ltd.5631Japan Steel Works to expand and renovate assembly plant at Yokohama WorksThe Japan Steel Works plans to expand the floor area and renovate its assembly plant at Yokohama Works in Kanazawa Ward, Yokohama, Kanagawa. The project is scheduled to start in January 2026 and be completed in April 2027, funded internally, with a planned investment of JPY 2.2 billion.Machinery & RoboticsYokohama, Kanagawa¥2.2BPlanned
2026.08.10The Japan Steel Works, Ltd.5631Japan Steel Works to expand and renovate assembly plant in MuroranThe Japan Steel Works plans to expand and renovate its assembly plant at the Muroran Works in Muroran, Hokkaido. The project has a total planned investment of ¥3.3 billion, started in December 2023, and is scheduled for completion in March 2027.Machinery & RoboticsMuroran, Hokkaido¥3.3BBuilding
2026.08.10The Japan Steel Works, Ltd.5631Japan Steel Works to install machining equipment at Muroran WorksJapan Steel Works plans to invest JPY 3.7 billion in new machining equipment at its Muroran Works in Muroran, Hokkaido. Construction is scheduled to begin in December 2025 and be completed in October 2028, funded internally.Machinery & RoboticsMuroran, Hokkaido¥3.7BBuilding
2026.08.10The Japan Steel Works, Ltd.5631Japan Steel Works to install melting equipment at Muroran WorksJapan Steel Works plans to install melting equipment at its Muroran Works in Muroran, Hokkaido. The project has a total planned investment of ¥1.9 billion, with construction scheduled from September 2025 through January 2028; no post-completion capacity increase is disclosed.Steel & Non-ferrous MetalsMuroran, Hokkaido¥1.9BBuilding
2026.08.10Kameda Seika Co., Ltd.2220Kameda Seika to install confectionery production equipment at Suibara PlantKameda Seika plans to invest in confectionery production equipment and related facilities at its Suibara Plant in Agano, Niigata. The project is scheduled to start in April 2026 and be completed by March 2027, funded through internal funds and borrowings.Food & BeverageAgano, Niigata¥1.5BPlanned
2026.08.10Kyorin Pharmaceutical Group Factory Co., Ltd.4569Kyorin Pharmaceutical Group Factory to install product manufacturing equipment at Takaoka plantKyorin Pharmaceutical Group Factory plans to invest in product manufacturing equipment at its Takaoka plant and other facilities in Takaoka, Toyama. The project is scheduled to start in April 2026 and be completed in March 2027, funded with internal resources.Pharma & MedicalTakaoka, Toyama¥3.7BPlanned
2026.08.10Makino Milling Machine Co., Ltd.6135Makino Milling Machine to invest ¥27.129 billion in production equipment at Fujiyoshida facilityMakino Milling Machine plans a total investment of ¥27.129 billion in production equipment at its Fujiyoshida facility in Yamanashi. Construction began in June 2024 and is scheduled for completion in June 2026; the disclosure does not specify the resulting capacity increase.Machinery & RoboticsFujiyoshida, Yamanashi¥27.1BBuilding
2026.08.10Moriroku Co., Ltd.4249Moriroku to build new plant in Kikuchi District, KumamotoMoriroku Co., Ltd.'s subsidiary Kumamoto Moriroku Kako Co., Ltd. plans to build a new plant in Kikuchi District, Kumamoto, for its resin processing products business. The project has a total planned investment of ¥2.023 billion, with construction scheduled from November 2025 to March 2027.Materials & ChemicalsKikuchi District, Kumamoto¥2BBuilding
2026.08.10Moriroku Co., Ltd.4249Moriroku to renew resin molding equipment at Suzuka plant and other facilitiesMoriroku plans to invest ¥5.294 billion to renew resin molding and processing equipment at its Suzuka plant and other facilities in Suzuka, Mie. Construction is scheduled from April 2026 through March 2027 and will be funded internally; no post-project capacity increase is disclosed.Materials & ChemicalsSuzuka, Mie¥5.3BPlanned
2026.08.10Nihon Tokushu Toryo Co., Ltd.4619Nihon Tokushu Toryo to rearrange its Hiratsuka factoryNihon Tokushu Toryo plans a factory rearrangement at its Hiratsuka plant in Hiratsuka, Kanagawa, as part of its coatings-related business. The project has a total planned investment of ¥3.421 billion, with work scheduled from October 2025 through December 2028.Materials & ChemicalsHiratsuka, Kanagawa¥3.4BPlanned
2026.08.10Nippon Avionics Co., Ltd.6946Nippon Avionics to invest in production equipment at Yokohama site and other facilitiesNippon Avionics plans to invest JPY 1.08 billion in production equipment and related facilities at its Yokohama site and other locations. Construction is scheduled to begin in April 2026 and be completed by March 2027, funded internally.Semiconductors & ElectronicsYokohama, Kanagawa¥1.1BPlanned
2026.08.10Nitto Boseki Co., Ltd.3110Nitto Boseki to expand glass cloth production equipment at Fukushima Business CenterNitto Boseki plans a ¥15 billion investment in glass cloth production equipment at its Fukushima Business Center in Fukushima City. Construction began in October 2025 and is scheduled for completion in December 2026; the project is part of the company's electronic materials business.Materials & ChemicalsFukushima, Fukushima¥15BBuilding
2026.08.10Orion Breweries, Ltd.409AOrion Breweries to renew canning equipment at Nago factoryOrion Breweries plans to renew the canning equipment at its factory in Nago, Okinawa. The project is scheduled to begin in December 2025 and be completed in October 2027, with capacity expected to increase by 25%.Food & BeverageNago, Okinawa¥4.7BBuilding
2026.08.10PILLAR Corporation6490PILLAR to build new factory at Ina plant in NaganoPILLAR plans to build a new factory at its Ina plant in Ina, Nagano, as part of its industrial equipment business. The project is scheduled to start in March 2025 and be completed in January 2027, with total planned investment of JPY 4.3 billion.Machinery & RoboticsIna, Nagano¥4.3BBuilding
2026.08.10Port Inc.7047Port to build grid-scale battery storage facilities at seven sitesPort plans to invest ¥2.8 billion in grid-scale battery storage facilities at Nagano Saku Daiichi and six other sites in Nagano Prefecture and elsewhere. Construction is scheduled to start in June 2026 and finish in December 2027, funded through borrowings.Power & EnergySaku, Nagano¥2.8BPlanned
2026.08.10Shin Nippon Air Technologies Co., Ltd.1952Shin Nippon Air Technologies plans SNKEBINA Innovation XHIVE research facility in EbinaShin Nippon Air Technologies plans a research facility named SNKEBINA Innovation XHIVE in Ebina, Kanagawa. The investment amount, construction schedule and post-completion capacity increase have not been disclosed; ¥473 million has already been paid.R&D FacilitiesEbina, Kanagawa¥473MPlanned
2026.08.10SoftBank Corp.9434SoftBank to invest in network infrastructure and AI data centers in TokyoSoftBank plans to invest in base stations, network equipment, AI computing infrastructure and AI data centers at its headquarters location in Minato, Tokyo. The planned investment totals ¥575.0 billion, with work scheduled from April 2026 through March 2027.Data CentersMinato, Tokyo¥575BPlanned
2026.08.10TPR Co., Ltd.6463TPR Kogyo to install cylinder liner production equipment in Sagae, YamagataTPR Kogyo plans to invest ¥1.926 billion in cylinder liner production equipment and related facilities at its Sagae site in Yamagata. Construction is scheduled from April 2026 through March 2027, although the company states that the investment will not increase production capacity.Automotive & TransportSagae, Yamagata¥1.9BPlanned
2026.08.10TPR Co., Ltd.6463TPR to install piston-ring production equipment at Nagano PlantTPR plans to invest ¥3.058 billion in piston-ring production equipment and related environmental and safety facilities at its Nagano Plant in Okaya, Nagano. Work is scheduled to start in January 2026 and finish in March 2027; no post-completion capacity increase is disclosed.Automotive & TransportOkaya, Nagano¥3.1BPlanned
2026.08.10Unipres Kyushu Co., Ltd.5949Unipres Kyushu to renew production equipment and strengthen production capacity in FukuokaUnipres Kyushu plans a ¥3.1 billion investment at its headquarters and factory in Kyoto District, Fukuoka, to renew production equipment for a model change and strengthen its production system. Construction is scheduled from April 2026 through March 2027, funded with internal resources.Automotive & TransportKyoto District, Fukuoka¥3.1BPlanned
2026.08.10Unipres Corporation5949Unipres to renew production equipment and strengthen production at Fuji plantUnipres plans a ¥1.6 billion investment to renew production equipment and strengthen its production system at the Fuji plant in Shizuoka for a model change and related initiatives. The project is scheduled to begin in April 2026 and be completed in March 2027.Automotive & TransportFuji; Fujinomiya, Shizuoka¥1.6BPlanned
2026.08.10Unipres Corporation5949Unipres to renew production equipment and strengthen production capacity for model changesUnipres plans a ¥1.6 billion investment to renew production equipment and strengthen its production system for model changes at its Tochigi operations and related facilities. The project is scheduled to begin in April 2026 and be completed by March 2027, funded through internal funds and borrowings.Automotive & TransportMoka; Oyama, Tochigi¥1.6BPlanned
2026.08.10Yamato Tokushu Koki Co., Ltd.4619Yamato Tokushu Koki to build new die manufacturing plant in FujisawaYamato Tokushu Koki plans to build a new die manufacturing plant in Fujisawa, Kanagawa, including land, buildings and machinery. The project is part of Nippon Tokushu Toryo's automotive products business and carries a planned total investment of ¥4.245 billion, with construction scheduled from December 2025 to September 2028.Automotive & TransportFujisawa, Kanagawa¥4.2BPlanned
2026.08.10Yonkyo Co., Ltd.9955Yonkyo Seedling Center to build artificial hatchery facilities in OitaYonkyo plans to establish the Yonkyo Seedling Center and install artificial hatchery equipment for juvenile fish production in Oita and other locations. The planned investment is JPY 2 billion, funded through internal funds and capital increase proceeds; construction is scheduled to begin between 2028 and 2029, with completion not yet determined.Food & BeverageOita¥2BPlanned
2026.08.10Yonkyo Co., Ltd.9955Yonkyo to build new logistics warehouse in MiyazakiYonkyo plans to establish a new cold-storage and refrigerated warehouse facility in Miyazaki Prefecture for its feed and fodder sales business. The project has a total planned investment of JPY 2.0 billion, with construction scheduled to begin between 2028 and 2029; the completion date and added capacity have not been disclosed.Logistics FacilitiesMiyazaki¥2BPlanned
2026.08.10Yonkyu Co., Ltd.9955Yonkyu to build seafood processing plant in UwajimaYonkyu plans to establish the tentatively named Yonkyu Processing Plant in Uwajima, Ehime, with facilities for manufacturing processed seafood products. The project has a planned total investment of ¥4 billion, funded through internal funds and capital increase proceeds; construction is scheduled to begin between 2028 and 2029, while completion timing is undecided.Food & BeverageUwajima, Ehime¥4BPlanned
2026.08.09Aiphone Co., Ltd.6718Aiphone to develop new headquarters and R&D base in NagoyaAiphone plans to establish a headquarters and research and development base together with its Nagoya branch in Atsuta Ward, Nagoya, Aichi. Construction began in December 2025 and is scheduled for completion in September 2027; the total planned investment amount and post-completion capacity increase are undisclosed.R&D FacilitiesNagoya, Aichinot disclosedBuilding
2026.08.09AIRMAN Co., Ltd.6364AIRMAN to build new development testing facility at Tsubame headquarters and factoryAIRMAN plans to establish a new development testing facility at its headquarters and factory in Tsubame, Niigata, supporting its construction machinery and industrial machinery businesses. The project is scheduled to start in November 2025 and be completed in August 2027, with total planned investment of ¥2.56 billion funded by internal funds and borrowings.R&D FacilitiesTsubame, Niigata¥2.6BPlanned
2026.08.09Akita DN Lighting Co., Ltd.4611Akita DN Lighting plans factory facility in Katagami, AkitaAkita DN Lighting, a subsidiary of Dainich Co., Ltd., lists planned investment in its factory facility in Katagami, Akita, for its lighting-equipment segment. Construction began in June 2025; the total planned investment amount and completion timing are not disclosed in the filing.Other ManufacturingKatagami, Akitanot disclosedBuilding
2026.08.09ASJ Inc.2351ASJ operates server facilities at its Himeji Lab and Server CenterASJ's Himeji Lab and Server Center in Himeji, Hyogo includes server equipment. The disclosure provides no investment amount, construction schedule, or capacity increase.Data CentersHimeji, Hyogonot disclosedPlanned
2026.08.09Chubu Shiryo Co., Ltd.2053Chubu Shiryo to install cattle-feed processing equipment at Shibushi plantChubu Shiryo plans to install cattle-feed processing equipment at its Shibushi plant in Shibushi, Kagoshima. Construction began in August 2025 and is scheduled for completion in August 2026; the planned investment amount is not disclosed in the source.Food & BeverageShibushi, Kagoshimanot disclosedBuilding
2026.08.09Chuo Warehouse Co., Ltd.9319Chuo Warehouse to build new 14,600-sqm warehouse in Ama, AichiChuo Warehouse is constructing a new warehouse at its Nagoya Sales Office in Ama, Aichi, as part of its domestic logistics business. The project has a total planned investment of ¥3.66 billion, with construction scheduled from May 2025 through January 2027 and 14,600 sqm of additional warehouse capacity planned.Logistics FacilitiesAma, Aichi¥3.7BBuilding
2026.08.09CTS Co., Ltd.4345CTS to expand and renew rental SAP equipment at Ueda headquartersCTS plans to invest JPY 1.503 billion in expanding and renewing a complete set of SAP equipment for rental use at its headquarters in Ueda, Nagano. The investment will be financed through leasing, with work scheduled from April 2026 through March 2027.Machinery & RoboticsUeda, Nagano¥1.5BPlanned
2026.08.09Daihen Corporation6622Daihen subsidiary Shihen Tech to expand production equipment at Tadotsu headquarters plantShihen Tech, a Daihen subsidiary, plans to invest JPY 5 billion in production equipment at its headquarters plant in Tadotsu, Kagawa. The project started in May 2025 and is scheduled for completion in April 2027, increasing production capacity by approximately 70%.Power & EnergyTadotsu, Kagawa¥5BBuilding
2026.08.09Daihen Corporation6622Daihen to expand production capacity at Mie FactoryDaihen plans to invest JPY 10 billion in new production equipment at its Mie Factory in Taki, Mie. The project is scheduled to start in March 2026 and be completed in April 2029, increasing production capacity by approximately 100% in the Energy Management segment.Power & EnergyTaki, Mie¥10BPlanned
2026.08.09Daiichi Sankyo Biotech Co., Ltd.4568Daiichi Sankyo Biotech to install new manufacturing equipment at Kitamoto plantDaiichi Sankyo Biotech plans a JPY 46.53 billion investment in new pharmaceutical manufacturing equipment at its Kitamoto plant in Kitamoto, Saitama. Construction began in February 2024 and completion is scheduled for March 2028; the disclosure states that capacity will increase through the new installation.Pharma & MedicalKitamoto, Saitama¥46.5BBuilding
2026.08.09Daiichi Sankyo4568Daiichi Sankyo to expand research facilities at Shinagawa R&D CenterDaiichi Sankyo plans to invest ¥88.891 billion in new research equipment at its Shinagawa Research and Development Center in Shinagawa, Tokyo. Construction began in November 2024 and completion is scheduled for December 2027, with the project funded internally.R&D FacilitiesShinagawa, Tokyo¥88.9BPlanned
2026.08.09Daiichi Sankyo4568Daiichi Sankyo to upgrade manufacturing equipment at Tatebayashi PlantDaiichi Sankyo plans to invest ¥6.43 billion in manufacturing equipment at its Tatebayashi Plant in Chiyoda, Gunma. Construction is scheduled to begin in March 2026 and finish in August 2027; the disclosure describes the post-completion capacity increase as refurbishment.Pharma & MedicalChiyoda, Gunma¥6.4BPlanned
2026.08.09DANGAN Film Co., Ltd.4994DANGAN Film to install film manufacturing equipment at Shiraoka No. 1 factoryDANGAN Film plans to install film manufacturing equipment at its Shiraoka No. 1 factory in Shiraoka, Saitama. The project started in September 2025 and is scheduled for completion in January 2028; the planned investment total and added capacity are not disclosed.Materials & ChemicalsShiraoka, Saitamanot disclosedPlanned
2026.08.09Eagle Industry Co., Ltd.6486Eagle Industry to install production equipment at its Saitama facilityEagle Industry plans to invest JPY 2.07 billion in production equipment and related assets at its Saitama facility in Sakado, Saitama. Construction is scheduled to run from April 2026 through March 2027, supporting capacity expansion for its aerospace-industry business.Machinery & RoboticsSakado, Saitama¥2.1BPlanned
2026.08.09FP Corporation7947FP Corporation to build Bando factory and distribution center in IbarakiFP Corporation plans to build a new factory and warehouse-based distribution center in Bando, Ibaraki, to manufacture new OPP sheets and increase food-container storage capacity. Construction began in May 2026 and is scheduled for completion in September 2028; the planned storage-capacity increase is 280,000 cases.Food & BeverageBando, Ibarakinot disclosedPlanned
2026.08.09Hakodate Dock Co., Ltd.7014Hakodate Dock to expand tank production facilities and install cutting equipmentHakodate Dock plans to expand tank production facilities and install new cutting equipment at its Hakodate Shipyard in Hakodate, Hokkaido. The project is scheduled to begin in December 2025 and be completed in March 2030, with total planned investment of JPY 5.968 billion.Other ManufacturingHakodate, Hokkaido¥6BPlanned
2026.08.09Hokuetsu Corporation3865Hokuetsu Corporation to renew No. 8 recovery boiler superheater panel at Niigata MillHokuetsu Corporation plans to renew the fourth-stage front superheater panel in the No. 8 recovery boiler at its Niigata Mill. The project has a total planned investment of ¥1.245 billion, with construction scheduled from January 2026 through July 2027.Paper & PulpNiigata, Niigata¥1.2BPlanned
2026.08.09Isuzu Logistics Co., Ltd.7202Isuzu Logistics plans logistics facilities including Fujisawa distribution centerIsuzu Logistics, a subsidiary of Isuzu Motors, lists planned logistics facilities including a logistics center in Fujisawa, Kanagawa. The disclosure provides no investment amount, construction schedule, or incremental capacity.Logistics FacilitiesFujisawa, Kanagawanot disclosedPlanned
2026.08.09Japan Petroleum Exploration Co., Ltd.1662Japan Petroleum Exploration to build 20 MW/106.9 MWh battery storage facility in TomakomaiJapan Petroleum Exploration plans to invest ¥6.1 billion in a battery storage and substation facility in Tomakomai, Hokkaido. Construction is scheduled to run from October 2025 through the second half of 2027, with planned capacity of 20 MW and 106.9 MWh.Power & EnergyTomakomai, Hokkaido¥6.1BPlanned
2026.08.09Japan Petroleum Exploration Co., Ltd.1662Japan Petroleum Exploration to expand gas supply facilities at Soma LNG BaseJapan Petroleum Exploration plans a ¥1.2 billion investment in gas supply facilities at its Soma LNG Base in Fukushima. The project includes seven LNG truck-loading lanes and is scheduled for work from December 2024 through December 2026.Power & EnergySoma, Fukushima¥1.2BBuilding
2026.08.09Japan Petroleum Exploration Co., Ltd.1662Japan Petroleum Exploration to install electrical receiving and distribution equipment for Tomakomai CCS projectJapan Petroleum Exploration plans to invest ¥2.2 billion in electrical receiving and distribution equipment for its Tomakomai CCS project in Tomakomai, Hokkaido. The project is scheduled from June 2026 through March 2030 and will be funded with internal resources.Power & EnergyTomakomai, Hokkaido¥2.2BPlanned
2026.08.09JTEKT Gear Systems Corporation6473JTEKT Gear Systems to install automotive product manufacturing equipment in SetoJTEKT Gear Systems plans to invest ¥4.7 billion in automotive product manufacturing equipment and related facilities at its Seto, Aichi site. Construction is scheduled from April 2026 through March 2027, funded with internal resources; no post-investment capacity increase is disclosed.Automotive & TransportSeto, Aichi¥4.7BPlanned
2026.08.09JTEKT Corporation6473JTEKT to install automotive product manufacturing equipment at Tadomisaki PlantJTEKT plans to invest ¥3.6 billion in automotive product manufacturing equipment and related facilities at its Tadomisaki Plant in Takahama, Aichi. Construction is scheduled from April 2026 through March 2027, funded with internal resources; no capacity increase is disclosed.Automotive & TransportTakahama, Aichi¥3.6BPlanned
2026.08.09JTEKT Corporation6473JTEKT to install industrial machinery and bearing manufacturing equipment at Kokubu PlantJTEKT plans to invest ¥3 billion in manufacturing equipment and related facilities for its industrial machinery and bearing products at the Kokubu Plant in Kashiwara, Osaka. Construction is scheduled from April 2026 through March 2027, funded with internal resources; no capacity increase is disclosed.Machinery & RoboticsKashiwara, Osaka¥3BPlanned
2026.08.09JTEKT Corporation6473JTEKT to invest ¥4.9 billion in automotive manufacturing equipment at Hanazono PlantJTEKT plans to invest ¥4.9 billion in automotive product manufacturing equipment at its Hanazono Plant in Okazaki, Aichi. Construction is scheduled from April 2026 through March 2027, funded with internal resources; the filing does not disclose the resulting capacity increase.Automotive & TransportOkazaki, Aichi¥4.9BPlanned
2026.08.09KOKUSAI ELECTRIC Corporation6525KOKUSAI ELECTRIC to acquire land for its Tonami facilityKOKUSAI ELECTRIC plans a ¥1.0 billion land investment at its Tonami facility in Tonami, Toyama. The company plans to begin the project in February 2026 and complete it in September 2026; no capacity increase is disclosed.Semiconductors & ElectronicsTonami, Toyama¥1BPlanned
2026.08.09Komatsu Matere Ltd.3580Komatsu Matere plans dyeing and processing equipment at Nomi manufacturing facilitiesKomatsu Matere plans to install dyeing and processing equipment at its No. 2 and No. 3 manufacturing departments in Nomi, Ishikawa, as part of its textile business. The filing identifies the project as environmental and technology-development equipment, but does not provide a reliable investment amount, capacity increase, contractor, or construction schedule.Other ManufacturingNomi, Ishikawanot disclosedPlanned
2026.08.09Komatsu Matere Co., Ltd.3580Komatsu Matere to install dyeing and processing equipment at Nomi manufacturing siteKomatsu Matere plans to invest JPY 1.45 billion in dyeing and processing equipment for its manufacturing operations in Nomi, Ishikawa. The project will be funded with internal resources; the source does not provide reliable construction start or completion dates, nor a quantified capacity increase.Other ManufacturingNomi, Ishikawa¥1.5BPlanned
2026.08.09Komatsu Matere Co., Ltd.3580Komatsu Matere to install dyeing and processing equipment in NomiKomatsu Matere plans to invest in new dyeing and processing equipment at its No. 2 and No. 3 Manufacturing Departments in Nomi, Ishikawa. The project is funded internally, with construction beginning in December 2021; the disclosed completion field is unclear and identifies the No. 5 Manufacturing Department rather than a date.Materials & ChemicalsNomi, Ishikawa¥1.5BPlanned
2026.08.09Komatsu Matere Co., Ltd.3580Komatsu Matere to upgrade dyeing and processing equipment in NomiKomatsu Matere plans to renew dyeing and processing equipment at its No. 2 and No. 3 manufacturing departments in Nomi, Ishikawa. The project also includes introducing equipment for new product development; the disclosure does not state an investment amount or clear construction dates.Materials & ChemicalsNomi, Ishikawanot disclosedPlanned
2026.08.09Konoike Transport9025Konoike Transport plans warehouse and vehicle investments for temperature-controlled logisticsKonoike Transport plans new equipment investments, including warehouses and vehicles, at its temperature-controlled logistics branch in Chuo-ku, Tokyo, and other locations. The disclosure does not provide an investment amount, schedule, or quantified capacity increase.Logistics FacilitiesChuo-ku, Tokyonot disclosedPlanned
2026.08.09Konoike Transport Co., Ltd.9025Konoike Transport plans warehouse and vehicle investments in KashimaKonoike Transport lists planned investments in warehouses, vehicles and related equipment at its Steel East Japan Branch in Kashima, Ibaraki. The filing discloses no investment amount, schedule or incremental capacity.Logistics FacilitiesKashima, Ibarakinot disclosedPlanned
2026.08.09Konoike Transport Co., Ltd.9025Konoike Transport plans warehouse and vehicle investments in Tokyo and other locationsKonoike Transport lists planned investments in warehouses, vehicles and related facilities for its Kanto and North Japan branches, including locations in Chuo, Tokyo and elsewhere. The filing provides no investment amount, schedule or capacity increase.Logistics FacilitiesChuo, Tokyonot disclosedPlanned
2026.08.09Konoike Transport9025Konoike Transport plans warehouse and vehicle investments in WakayamaKonoike Transport identifies planned investments in warehouses, vehicles and related assets at its Steel Kansai Branch in Wakayama City and other locations. The filing does not disclose the investment amount, schedule or added capacity.Logistics FacilitiesWakayama, Wakayamanot disclosedPlanned
2026.08.09Vital KSK Holdings3151KSK to upgrade logistics and sales facilities at its Hanshin siteKSK plans a ¥6.0 billion investment in logistics equipment and sales-branch facilities at its Hanshin business site in Nishinomiya, Hyogo. Construction began in April 2024 and is scheduled for completion in March 2027, supporting its pharmaceutical wholesale operations.Logistics FacilitiesNishinomiya, Hyogo¥6BBuilding
2026.08.09Kyuhen Co., Ltd.6622Kyuhen to expand production capacity at Fukuoka plantKyuhen plans to invest JPY 6 billion in production equipment at its head plant in Fukutsu, Fukuoka. The project began in November 2025 and is scheduled for completion in August 2028, with production capacity expected to increase by approximately 30%.Power & EnergyFukutsu, Fukuoka¥6BBuilding
2026.08.09Maruichi Steel Tube Ltd.5463Maruichi Steel Tube to invest in stainless steel tube manufacturing facilities in ShimonosekiMaruichi Steel Tube plans a ¥51.767 billion investment in land, buildings and stainless steel tube manufacturing equipment at facilities operated by Maruichi Steel Tube and Maruichi Stainless Tube in Shimonoseki, Yamaguchi. Construction began in April 2024, with completion scheduled for 2027 or later; the investment will be funded internally.Steel & Non-ferrous MetalsShimonoseki, Yamaguchi¥51.8BBuilding
2026.08.09Mitsubishi Cable Industries, Ltd.5711Mitsubishi Cable Industry to build second Kumagaya Seal FactoryMitsubishi Cable Industry is constructing the second factory at its Kumagaya Seal Factory in Kumagaya, Saitama, with total planned investment of ¥4.35 billion. Construction began in January 2025 and is scheduled for completion in July 2026, adding planned sales capacity of ¥268 million per month.Materials & ChemicalsKumagaya, Saitama¥4.4BBuilding
2026.08.09Namura Shipbuilding Co., Ltd.7014Namura Shipbuilding to upgrade Imari shipyard with new crane and production equipmentNamura Shipbuilding plans to invest ¥23.132 billion in new and expanded equipment at its Imari shipyard in Imari, Saga. The project includes a new goliath crane, increased conveyor capacity, and new painting equipment, with construction scheduled from December 2025 through March 2030.Other ManufacturingImari, Saga¥23.1BBuilding
2026.08.09Nichireki Group Co., Ltd.5011Nichireki Group to invest ¥30 billion in East Kanto factory and production facilitiesNichireki Group plans to invest ¥30 billion in office, factory, and production facilities for its asphalt processed-products business at its East Kanto branch in Tsukubamirai, Ibaraki. Construction began in April 2024 and is scheduled for completion in October 2027; no post-completion capacity figure is disclosed.Materials & ChemicalsTsukubamirai, Ibaraki¥30BBuilding
2026.08.09Nippon Steel Corporation5401Nippon Steel to install next-generation hot-rolling equipment at Nagoya WorksNippon Steel plans a total investment of ¥270 billion in next-generation hot-rolling equipment at its Nagoya Works in Tokai, Aichi. Construction began in May 2022, with completion scheduled for the first quarter of fiscal 2026.Steel & Non-ferrous MetalsTokai, Aichi¥270BBuilding
2026.08.09Nitto Kogyo Corporation6651Nitto Kogyo to expand Tochigi Nogi plant with system-rack production facilitiesNitto Kogyo plans to invest ¥7.4 billion in buildings and production facilities, including system racks, at its Tochigi Nogi Plant in Nogi, Tochigi. Construction is scheduled to begin in July 2026 and finish in September 2027; no post-completion capacity increase is disclosed.Semiconductors & ElectronicsNogi, Tochigi¥7.4BPlanned
2026.08.09Nitto Kogyo Corporation6651Nitto Kogyo to install short-circuit testing equipment and building at Seto PlantNitto Kogyo plans to invest ¥3.733 billion in short-circuit testing equipment and an associated building at its Seto Plant in Seto, Aichi. Construction began in August 2024 and is scheduled for completion in January 2027.Semiconductors & ElectronicsSeto, Aichi¥3.7BBuilding
2026.08.09Ogura Clutch Co., Ltd.6408Ogura Clutch to install manufacturing equipment at Akahori PlantOgura Clutch plans to install manufacturing equipment for transportation equipment and general industrial products at its Akahori Plant in Isesaki, Gunma. Construction is scheduled from April 2026 through March 2027, funded by borrowings and internal funds; the investment amount and capacity increase are undisclosed.Automotive & TransportIsesaki, Gunmanot disclosedPlanned
2026.08.09Ogura Clutch Co., Ltd.6408Ogura Clutch to install manufacturing equipment at Third Factory in KiryuOgura Clutch plans to install manufacturing equipment for general industrial products at its Third Factory in Kiryu, Gunma. The project is scheduled to start in April 2026 and be completed by March 2027, funded through borrowings and internal funds; the investment amount and capacity increase were not disclosed.Machinery & RoboticsKiryu, Gunmanot disclosedPlanned
2026.08.09Ogura Clutch Co., Ltd.6408Ogura Clutch to install transport-equipment product manufacturing equipment at Kourin PlantOgura Clutch plans to install manufacturing equipment for transport-equipment products at its Kourin Plant in Isesaki, Gunma. The project is scheduled to start in April 2026 and be completed in March 2027, funded through borrowings and internal funds.Automotive & TransportIsesaki, Gunmanot disclosedPlanned
2026.08.09Oishi Sangyo Co., Ltd.3943Oishi Sangyo to expand pulp-mold product manufacturing equipment at Ibaraki plantOishi Sangyo plans to invest approximately ¥2.33 billion in pulp-mold product manufacturing equipment at its Ibaraki Plant in Kitaibaraki, Ibaraki. Construction began in March 2025 and is scheduled for completion in June 2026, increasing capacity by approximately 40%.Paper & PulpKitaibaraki, Ibaraki¥2.3BBuilding
2026.08.09Oriental Land Co., Ltd.4661Oriental Land to invest ¥330 billion in cruise business facilities at Urayasu Brighton BuildingOriental Land plans a total investment of ¥330 billion in its cruise business at the Urayasu Brighton Building in Urayasu, Chiba. Work began in July 2024, with completion planned for FY2028; no post-completion capacity increase is disclosed.OtherUrayasu, Chiba¥330BPlanned
2026.08.09Platec Soma Co., Ltd.9247Platec Soma to build waste-plastic intermediate processing plant in SomaPlatec Soma, a subsidiary of TRE Holdings, plans to invest in a waste-plastic recycling intermediate processing plant in Soma, Fukushima. The project is scheduled to start in April 2025 and be completed in April 2027, adding annual processing capacity of 13,000 tonnes.Materials & ChemicalsSoma, Fukushima¥1.5BBuilding
2026.08.09River Co., Ltd.9247River to build Ichihara Dust Recycling Facility in ChibaRiver Co., Ltd. plans to build the Ichihara Dust Recycling Facility in Ichihara, Chiba, as part of its resource recycling business. The facility is scheduled to be completed in April 2028 and will add processing capacity of 60,000 tonnes per year.Other ManufacturingIchihara, Chiba¥7.6BPlanned
2026.08.09ROHM Co., Ltd.6963Rohm Apollo to invest ¥4.894 billion in semiconductor production equipment in FukuokaRohm Apollo plans to invest ¥4.894 billion in production equipment and related facilities at its sites in Hirokawa and elsewhere in Fukuoka Prefecture. The project is scheduled to begin in April 2026 and be completed by March 2027; no capacity increase is disclosed.Semiconductors & ElectronicsHirokawa, Fukuoka¥4.9BPlanned
2026.08.09S&B Foods Inc.2805S&B Foods to install instant food production equipment at Ueda plantS&B Foods plans to invest in production equipment for instant products and other foods at its Ueda plant in Ueda, Nagano. The project is scheduled to begin in April 2027 and be completed in December 2028, funded through internal funds and borrowings.Food & BeverageUeda, Nagano¥8.5BPlanned
2026.08.09Sankyo Frontier Co., Ltd.9639Sankyo Frontier to add 9,130 rental unit houses across 25 centersSankyo Frontier plans to invest ¥4.47 billion in rental assets, including unit houses, at the Ibaraki Logistics Center in Bando and 24 other centers. The investment is scheduled from April 2026 to March 2027 and will add 9,130 rental units.Logistics FacilitiesBando, Ibaraki¥4.5BPlanned
2026.08.09Sankyo Frontier Co., Ltd.9639Sankyo Frontier to establish and renew 70 unit-house and trunk-room sitesSankyo Frontier plans to invest JPY 1.681 billion in buildings, structures and equipment for offices and trunk-room facilities at its Sapporo sales office and 70 other locations. Construction is scheduled from April 2026 through March 2027, creating or renewing 70 sites in its unit-house business.Logistics FacilitiesSapporo, Hokkaido¥1.7BPlanned
2026.08.09Sankyo Frontier Co., Ltd.9639Sankyo Frontier to install production equipment at Tsukuba plant and other sitesSankyo Frontier plans to invest in production equipment and related facilities at its Tsukuba plant in Tsuchiura, Ibaraki, and other locations. The company expects to spend ¥2.393 billion using internal funds and borrowings, with work scheduled from April 2026 through March 2027.Other ManufacturingTsuchiura, Ibaraki¥2.4BPlanned
2026.08.09Sanwa Material Solutions Co., Ltd.4125Sanwa Material Solutions to install recycling equipment at Kitakyushu plantSanwa Material Solutions plans a total investment of ¥8.0 billion in recycling and related equipment at its Kitakyushu plant in Tobata-ku, Kitakyushu, Fukuoka. Construction began in August 2025 and is scheduled for completion in March 2027; the disclosure does not specify the resulting capacity increase.Materials & ChemicalsKitakyushu, Fukuoka¥8BBuilding
2026.08.09Sanwa Yuka Industry Co., Ltd.4125Sanwa Yuka Industry to install recycling equipment at Geshi Plant in KariyaSanwa Yuka Industry plans to invest JPY 1.1 billion in recycling and ancillary equipment at its Geshi Plant in Kariya, Aichi. Construction is scheduled to start in September 2026 and finish in July 2027, funded through internal funds and borrowings.Materials & ChemicalsKariya, Aichi¥1.1BPlanned
2026.08.09Seven Industry Co., Ltd.7896Seven Industry to install solar power generation at four Minoh-Kamo factoriesSeven Industry plans to install solar power generation facilities at its Minoh-Kamo No. 1-4 factories in Minoh-Kamo, Gifu. Construction is scheduled to start in July 2026 and finish in January 2027, with funding through borrowings.Power & EnergyMinoh-Kamo, Gifu¥111.5BPlanned
2026.08.09Seven Industry Co., Ltd.7896Seven Industry to install stair-processing equipment at Hichiso factoriesSeven Industry plans to install stair-processing equipment at its Hichiso No. 1 and No. 2 factories in Gifu Prefecture. The project is intended to renew equipment and increase production capacity, with work scheduled from April to October 2026.Other ManufacturingHichiso, Gifu¥73.4BPlanned
2026.08.09Shinshu Takeei Co., Ltd.9247Shinshu Takeei plans controlled landfill expansion in ShiojiriShinshu Takeei plans a controlled landfill facility at its Higashiyama site in Shiojiri, Nagano, with total planned investment of ¥1.435 billion. The project is expected to add 240,000 cubic meters of landfill capacity, although construction and completion dates have not been set.OtherShiojiri, Nagano¥1.4BPlanned
2026.08.09Shionogi Pharma Co., Ltd.4507Shionogi Pharma to build vaccine production facility in SettsuShionogi Pharma plans to install new vaccine production equipment in Settsu, Osaka, with a total planned investment of ¥28.9 billion. Construction began in October 2024 and is scheduled for completion in March 2029, funded by internal funds and subsidies.Pharma & MedicalSettsu, Osaka¥28.9BPlanned
2026.08.09Shionogi Pharma Co., Ltd.4507Shionogi Pharma to expand pharmaceutical production facilities in AmagasakiShionogi Pharma plans a total investment of ¥6.035 billion in pharmaceutical production facilities at its Amagasaki site in Hyogo. Construction began in April 2022 and is scheduled for completion in March 2030, funded by internal funds and subsidies.Pharma & MedicalAmagasaki, Hyogo¥6BPlanned
2026.08.09Shionogi Pharma Co., Ltd.4507Shionogi Pharma to install production equipment at Kanegasaki PlantShionogi Pharma plans to invest ¥2.07 billion in production equipment at its Kanegasaki Plant in Iwate Prefecture. Construction is scheduled from January through December 2026 and will be funded internally; no post-investment capacity increase is disclosed.Pharma & MedicalIwate¥2.1BPlanned
2026.08.09Sinko Industries Ltd.6458Sinko Industries to expand production facilities at Kanagawa Factory and SINKO Technical CenterSinko Industries plans a ¥6.5 billion investment in production facilities at its Kanagawa Factory and SINKO Technical Center in Hadano, Kanagawa. Construction began in April 2024 and is scheduled for completion in March 2029, funded internally.Other ManufacturingHadano, Kanagawa¥6.5BBuilding
2026.08.09Sintokogio, Ltd.6339Sintokogio to build 3D-printing mass-production plant at Toyokawa WorksSintokogio plans to build a 3D-printing mass-production plant at its Toyokawa Works in Toyokawa, Aichi. The project has a total planned investment of ¥10 billion and is scheduled for completion in August 2028.Machinery & RoboticsToyokawa, Aichi¥10BPlanned
2026.08.09Sumitomo Osaka Cement Co., Ltd.5232Sumitomo Osaka Cement to build a 13,000-ton limestone carrierSumitomo Osaka Cement plans to build one dedicated limestone carrier with a loading capacity of 13,000 tons. The vessel is expected to be completed in March 2029 and will support the company's cement raw-material logistics.Other ManufacturingChiyoda-ku, Tokyo¥3.6BPlanned
2026.08.09T&H Eco Mirai Co., Ltd.9247T&H Eco Mirai to build waste incineration and power generation plant in IchiharaT&H Eco Mirai plans to construct an intermediate waste-processing plant for its waste incineration and power generation business in Ichihara, Chiba. The project is scheduled to start in January 2028 and be completed in March 2030, adding annual waste-processing capacity of 90,000 tonnes and 9,630 kW of power-generation capacity.Power & EnergyIchihara, Chiba¥18.8BPlanned
2026.08.09Taiho Kogyo Co., Ltd.6470Taiho Kogyo plans bearing-production equipment investment at Shin-hara PlantTaiho Kogyo plans to invest in bearing-product manufacturing equipment and related facilities at its Shin-hara Plant in Toyota, Aichi. The planned total investment is JPY 1.297 billion; no construction schedule or capacity increase is disclosed.Automotive & TransportToyota, Aichi¥1.3BPlanned
2026.08.09Taisei Lamick Co., Ltd.4994Taisei Lamick plans liquid-filling equipment maintenance investment at Hoshikawa DANGAN'S STUDIOTaisei Lamick plans to install maintenance equipment for its liquid-filling machinery business at Hoshikawa DANGAN'S STUDIO in Shiraoka, Saitama. Construction began in June 2025 and is scheduled for completion in March 2029; the total planned investment amount and resulting capacity increase were not disclosed.Machinery & RoboticsShiraoka, Saitamanot disclosedBuilding
2026.08.09Taisei Lamick Co., Ltd.4994Taisei Lamick to install R&D equipment at Hoshikawa DANGAN'S STUDIOTaisei Lamick plans a research and development equipment investment at its Hoshikawa DANGAN'S STUDIO facility in Shiraoka, Saitama. The project is scheduled to start in January 2026 and be completed in July 2026; the total planned investment amount is not disclosed.R&D FacilitiesShiraoka, Saitamanot disclosedBuilding
2026.08.09Takara Tomy Co., Ltd.7867Takara Tomy Arts to invest in amusement equipment at its Tokyo headquartersTakara Tomy Arts plans to invest in amusement equipment at its headquarters in Katsushika, Tokyo. The company expects to spend ¥1.621 billion from April 2026 through March 2027, funded with internal resources; no capacity increase is disclosed.Other ManufacturingKatsushika, Tokyo¥1.6BPlanned
2026.08.09Takeei Co., Ltd.9247Takeei to build Ichihara Recycling Center intermediate treatment plantTakeei plans to build the Ichihara Recycling Center, an intermediate waste-treatment plant in Ichihara, Chiba. The project has a total planned investment of ¥13.25 billion, with construction starting in June 2026 and completion scheduled for March 2028; annual processing capacity is expected to increase by 90,000 tonnes.OtherIchihara, Chiba¥13.3BPlanned
2026.08.09Takeei Co., Ltd.9247Takeei to develop shared infrastructure and power facilities at Soma Circular ParkTakeei is investing JPY 1.397 billion in shared infrastructure and power-related works at its Soma Circular Park in Soma, Fukushima. Construction began in April 2025 and is scheduled for completion in January 2030, funded through internal funds and borrowings.Power & EnergySoma, Fukushima¥1.4BBuilding
2026.08.09Takeei Co., Ltd.9247Takeei to expand Ichihara sorting center with new waste-processing plantTakeei, a subsidiary of TRE Holdings, plans a waste intermediate-processing plant at its Ichihara Sorting Center in Ichihara, Chiba. The project has a total planned investment of ¥10.433 billion, with construction underway from April 2025 and completion scheduled for March 2027; post-completion treatment capacity will increase to 30,000 tonnes per year.Other ManufacturingIchihara, Chiba¥10.4BBuilding
2026.08.09Toa DKK Corporation6848Toa DKK to install manufacturing equipment at affiliate facility in TonoToa DKK plans to invest ¥1.391 billion in manufacturing equipment at an affiliate-leased facility in Tono, Iwate. Construction began in July 2025 and completion is scheduled for December 2026; no post-completion capacity increase is disclosed.Other ManufacturingTono, Iwate¥1.4BBuilding
2026.08.09Toho Holdings Co., Ltd.8129Toho Pharmaceutical to build new Tohoku regional logistics center in SendaiToho Pharmaceutical plans to construct a new logistics center in Sendai, Miyagi, to support its pharmaceutical wholesale operations in the Tohoku region. The project has a planned total investment of JPY 4.75 billion, funded with internal resources; construction and completion dates have not yet been determined.Logistics FacilitiesSendai, Miyagi¥4.8BPlanned
2026.08.09TOKAI Cable Network and affiliates3167TOKAI Cable Network and affiliates to expand CATV and FTTH infrastructure across JapanTOKAI Cable Network and nine affiliated cable television operators plan a combined ¥7.936 billion investment in CATV broadcasting equipment, transmission-route infrastructure and FTTH facilities across eight Japanese prefectures. The project runs from December 2019 through March 2027 and is intended to expand service areas, increase the number of viewing households and strengthen distribution capacity.Telecom¥7.9BBuilding
2026.08.09Tokai Holdings Corporation3167Tokai Holdings to upgrade its core LP gas management systemTokai Holdings plans a ¥4.127 billion investment in a core LP gas management system covering Shizuoka and other locations. Construction began in March 2020 and completion is scheduled for March 2027, with the project expected to improve management capacity.Power & EnergyShizuoka¥4.1BBuilding
2026.08.09The Tokai Co., Ltd.3167TOKAI plans production equipment and aqua-server investment in ShizuokaTOKAI subsidiary The Tokai Co. plans to invest in production equipment, aqua servers and related facilities for its Aqua segment in Shizuoka. The project is expected to increase production capacity and support customer expansion, with construction scheduled from March 2026 to March 2027.Other ManufacturingShizuoka¥2BPlanned
2026.08.09The Tokai Co., Ltd.3167TOKAI to expand residential and commercial LP gas supply facilitiesTOKAI plans to invest ¥5.829 billion in residential and commercial LP gas supply facilities and related infrastructure in Shizuoka and other locations. The project is intended to expand the customer base, strengthen safety systems and reinforce sales sites, with construction running from March 2026 to March 2027.Power & EnergyShizuoka¥5.8BPlanned
2026.08.09Tokyo Electron Technology Solutions8035Tokyo Electron Technology Solutions to install process evaluation equipment at its headquarters in NirasakiTokyo Electron Technology Solutions is investing JPY 16.3 billion in process evaluation equipment and related facilities at its headquarters and other sites in Nirasaki, Yamanashi. Construction began in November 2024 and is scheduled for completion in October 2026; no post-completion capacity increase is disclosed.Semiconductors & ElectronicsNirasaki, Yamanashi¥16.3BBuilding
2026.08.09Toso Co., Ltd.5956Toso plans production equipment investment at Tsukuba FactoryToso plans to install production-related equipment at its Tsukuba Factory in Tsukubamirai, Ibaraki. The filing does not disclose the total planned investment amount or construction schedule; increased capacity is indicated for May 2026.Other ManufacturingTsukubamirai, Ibarakinot disclosedPlanned
2026.08.09Toso Corporation5956Toso plans production-related equipment investment at Tsukuba PlantToso Corporation lists planned investment in production-related equipment at its Tsukuba Plant in Tsukubamirai, Ibaraki. The filing gives no total investment amount or construction schedule; increased capacity is indicated for November 2026.Other ManufacturingTsukubamirai, Ibarakinot disclosedPlanned
2026.08.09Toso Corporation5956Toso to invest in production equipment at Mito-Kaido PlantToso Corporation plans to install production-related equipment at its Mito-Kaido Plant in Joso, Ibaraki. The investment amount is undisclosed, and the equipment is scheduled to increase capacity in August 2026.Other ManufacturingJoso, Ibarakinot disclosedPlanned
2026.08.09Toyo Suisan Kaisha, Ltd.2875Toyo Suisan to expand frozen-noodle production equipment at Yaizu PlantToyo Suisan will invest JPY 20.542 billion in new frozen-noodle manufacturing equipment at its Yaizu Plant in Yaizu, Shizuoka. Construction is scheduled to begin in June 2026 and finish in March 2031, with production capacity to be increased.Food & BeverageYaizu, Shizuoka¥20.5BPlanned
2026.08.09UEX Corporation9888UEX to renew buildings and structures at Tokyo Distribution CenterUEX plans to renew the buildings and structures at its Tokyo Distribution Center in Koto, Tokyo. The project has a total planned investment of ¥1.304 billion, with construction scheduled from July 2024 through September 2026; no post-completion capacity increase is disclosed.Logistics FacilitiesKoto, Tokyo¥1.3BBuilding
2026.08.09Yorozu Corporation7294Yorozu to install new-vehicle launch equipment at Oita Manufacturing CenterYorozu plans to invest in equipment for new-vehicle launches at its Oita Manufacturing Center in Nakatsu, Oita. The project began in July 2024 and is scheduled for completion in November 2026, funded internally, with total planned investment of ¥1.291 billion.Automotive & TransportNakatsu, Oita¥1.3BBuilding
2026.08.08Advanex Inc.5998Advanex to install production equipment at Niigata factory in KashiwazakiAdvanex plans to install production equipment and related facilities at its Niigata Factory in Kashiwazaki, Niigata. The project is scheduled to begin in April 2026 and be completed in March 2027, financed through lease borrowings.Other ManufacturingKashiwazaki, Niigata¥438MPlanned
2026.08.08Advanex Inc.5998Advanex to install production equipment at Saitama plantAdvanex plans to invest in production equipment and related facilities at its Saitama Plant in Honjo, Saitama. The project is scheduled to begin in April 2026 and be completed by March 2027, financed through lease borrowings.Machinery & RoboticsHonjo, Saitama¥522MPlanned
2026.08.08Aisin Tech Co., Ltd.255AAisin Tech to expand automation-equipment plant in KitakataAisin Tech is investing JPY 2 billion to expand its Kitakata No. 2 Factory in Fukushima, increasing production capacity for automation equipment. Construction began in May 2025 and completion is scheduled for September 2026; the project is funded through internal funds and borrowings.Machinery & RoboticsKitakata, Fukushima¥2BBuilding
2026.08.08Allied Coffee Roasters Co., Ltd.2750Allied Coffee Roasters to build new coffee roasting plant in OnoAllied Coffee Roasters is constructing a new coffee roasting plant in Ono, Hyogo, with a total planned investment of ¥4.8 billion. Construction began in March 2022 and is scheduled for completion in December 2026, adding annual roasting capacity of 8,000 tonnes.Food & BeverageOno, Hyogo¥4.8BBuilding
2026.08.08Appi Geothermal Energy Corporation5711Appi Geothermal to drill production well APP-6 in HachimantaiAppi Geothermal plans to install production well APP-6 at its headquarters site in Hachimantai, Iwate, to expand geothermal power output by 3,000 kW. The project is scheduled to start in November 2025 and be completed in October 2027, with a total planned investment of ¥2.47 billion.Power & EnergyHachimantai, Iwate¥2.5BPlanned
2026.08.08Astis Co., Ltd.9987Astis to build Shikoku logistics center in NiihamaAstis, a Suzuken group pharmaceutical wholesaler based in Ehime, plans a Shikoku logistics center warehouse and office facility in Niihama, Ehime. Per the filing, construction began in October 2023 and is scheduled for completion in December 2028 with total planned investment of about ¥9.207 billion; the filing does not disclose additional capacity.Logistics FacilitiesNiihama, Ehime¥9.2BBuilding
2026.08.08Cerespo9625Cerespo to install event setup equipment at Gunma Logistics CenterCerespo plans to invest ¥17.76 million in new setup equipment at its Gunma Logistics Center in Maebashi, Gunma. The company expects to begin and complete the installation in July 2026, funded with internal resources.Logistics FacilitiesMaebashi, Gunma¥17.8MPlanned
2026.08.08Chubu Shiryo Co., Ltd.2053Chubu Shiryo to install poultry and swine feed shipping equipment at Shibushi PlantChubu Shiryo plans to install new chicken and pig feed shipping equipment at its Shibushi Plant in Shibushi, Kagoshima. Construction is scheduled to begin in October 2026 and finish in June 2027; the planned investment amount and added capacity are undisclosed.Food & BeverageShibushi, Kagoshimanot disclosedPlanned
2026.08.08Chunichi Transport Co., Ltd.6203Chunichi Transport to install packaging and transport equipment in KiyosuChunichi Transport, a domestic transportation subsidiary of Howa Machinery, plans to invest in packaging and transport equipment at its Kiyosu, Aichi facility. The ¥17 million project is scheduled to start in April 2026 and finish in August 2026, funded internally.Logistics FacilitiesKiyosu, Aichi¥17MPlanned
2026.08.08Daido Industrial Bearing Japan Co., Ltd.7245Daido Industrial Bearing Japan to install medium-sized half-bearing production equipment in InuyamaDaido Industrial Bearing Japan is investing JPY 3.346 billion in medium-sized half-bearing manufacturing equipment at its facility in Inuyama, Aichi. Construction began in April 2023 and completion is scheduled for June 2028; the disclosure does not state the resulting capacity increase.Machinery & RoboticsInuyama, Aichi¥3.3BBuilding
2026.08.08Daido Metal Industry Co., Ltd.7245Daido Metal to build a manufacturing facility for medium-sized half-shell bearings at Maehara PlantDaido Metal Industry plans to construct a building for manufacturing equipment for medium-sized half-shell bearings at its Maehara Plant in Inuyama, Aichi. The project has a total planned investment of ¥1.768 billion, with construction scheduled from March 2024 to March 2027.Automotive & TransportInuyama, Aichi¥1.8BBuilding
2026.08.08Daido Metal Industry Co., Ltd.7245Daido Metal to install bimetal bearing-material production equipment at Inuyama plantDaido Metal Industry plans to install bimetal production equipment at its Bimetal Manufacturing Plant in Inuyama, Aichi. The project has a total planned investment of ¥189 million, began in May 2022, and is scheduled for completion in June 2026.Automotive & TransportInuyama, Aichi¥189MBuilding
2026.08.08Daido Metal Industries, Ltd.7245Daido Metal to install wound-bushing production equipment at Gifu plantDaido Metal Industries plans to install wound-bushing production equipment at its Gifu Plant in Gujo, Gifu. The project has a total planned investment of JPY 293 million, with work scheduled from August 2023 to August 2026 and funded through internal funds and borrowings.Other ManufacturingGujo, Gifu¥293MBuilding
2026.08.08Daiwa House Industry Co., Ltd.1925Daiwa House starts construction of DPL Ibaraki II multi-tenant logistics facilityDaiwa House Industry will develop DPL Ibaraki II, a four-story multi-tenant logistics facility on the former Panasonic Ibaraki factory site in Ibaraki, Osaka. The facility will have 31,245.97 sqm of total floor area, accommodate up to two tenants, and is designed to achieve Nearly ZEB standards with rooftop solar under an on-site PPA model.Logistics FacilitiesIbaraki, Osakanot disclosedPlanned
2026.08.08DANGAN Film Co., Ltd.4994DANGAN Film to extend Shiraoka No. 2 PlantDANGAN Film plans a JPY 6.3 billion extension of its Shiraoka No. 2 Plant in Shiraoka, Saitama, in its packaging film division. Work is scheduled from May 2026 to September 2029 and is expected to raise production capacity by 5 percent; the filing lists the funding method as undetermined.Materials & ChemicalsShiraoka, Saitama¥6.3BPlanned
2026.08.08DANGAN Film Co., Ltd.4994DANGAN Film to install film production equipment at Shiraoka No. 1 PlantDANGAN Film plans to install film manufacturing equipment at its Shiraoka No. 1 Plant in Shiraoka, Saitama. The project is scheduled to begin in April 2025 and be completed in March 2029, with total planned investment of ¥897.76 million; the filing does not disclose incremental capacity.Materials & ChemicalsShiraoka, Saitama¥897.8MBuilding
2026.08.08Dexerials Corporation4980Dexerials to build second factory at Kanuma siteDexerials Corporation plans to construct a second factory at its Kanuma business site in Tochigi. The project has a total planned investment of ¥9.629 billion, with construction scheduled from December 2024 to September 2027; no post-completion capacity increase is specified.Other ManufacturingKanuma, Tochigi¥9.6BBuilding
2026.08.08Dexerials Corporation4980Dexerials to build Second Factory at Kanuma Site in TochigiDexerials Corporation is investing in a second factory building at its Kanuma business site in Kanuma, Tochigi. The project has a total planned investment of ¥29.75 billion, with construction scheduled from July 2023 through June 2026; no post-completion capacity increase is disclosed.Other ManufacturingKanuma, Tochigi¥29.8BBuilding
2026.08.08Dexerials Corporation4980Dexerials to expand manufacturing equipment at No. 2 Kanuma plantDexerials Corporation plans to invest in manufacturing equipment at its No. 2 Kanuma plant in Kanuma, Tochigi. The project has a total planned investment of ¥3.514 billion, funded through internal funds and borrowings, with construction scheduled from December 2024 to March 2029.Semiconductors & ElectronicsKanuma, Tochigi¥3.5BBuilding
2026.08.08Dexerials Corporation4980Dexerials to install manufacturing equipment at Tochigi siteDexerials Corporation plans to invest JPY 6.54 billion in manufacturing equipment at its headquarters and Tochigi business site in Shimotsuke, Tochigi. The project is scheduled to begin in May 2026 and be completed in January 2028, supporting its optical materials and components business.Semiconductors & ElectronicsShimotsuke, Tochigi¥6.5BPlanned
2026.08.08Dexerials Corporation4980Dexerials to invest ¥5.1 billion in building at Tochigi facilityDexerials Corporation plans a ¥5.1 billion building investment at its headquarters and Tochigi facility in Shimotsuke, Tochigi. Construction is scheduled to begin in May 2026 and finish in July 2027; the disclosure does not specify additional capacity.Other ManufacturingShimotsuke, Tochigi¥5.1BPlanned
2026.08.08Eagle Industry Co., Ltd.6486Eagle Industry to install production equipment at its Okayama siteEagle Industry plans to invest ¥2.264 billion in production equipment and related facilities at its Okayama site in Takahashi, Okayama. The project targets the company's automotive and construction machinery business and is scheduled to run from April 2026 through March 2027.Automotive & TransportTakahashi, Okayama¥2.3BPlanned
2026.08.08Eagle Industry Co., Ltd.6486Eagle Industry to install production equipment at Saitama facilityEagle Industry plans to invest JPY 2.07 billion in production equipment and related facilities at its Saitama operation in Sakado, Saitama. The project is scheduled to begin in April 2026 and be completed by March 2027, funded through internal resources and borrowings.Machinery & RoboticsSakado, Saitama¥2.1BPlanned
2026.08.08Eagle Industry Co., Ltd.6486Eagle Industry to install production equipment at Takasago facilityEagle Industry plans to invest ¥603 million in production equipment and related assets at its Takasago facility in Takasago, Hyogo. Construction is scheduled from April 2026 through March 2027, serving its marine-industry business.Other ManufacturingTakasago, Hyogo¥603MPlanned
2026.08.08FDK Corporation6955FDK to install battery and electronic-component manufacturing equipment at Kosai PlantFDK plans to invest ¥388 million in battery manufacturing and electronic-component manufacturing equipment at its Kosai Plant in Kosai, Shizuoka. The project is scheduled to begin in April 2026 and be completed by March 2027, funded through internal funds and borrowings.Semiconductors & ElectronicsKosai, Shizuoka¥388MPlanned
2026.08.08FDK Corporation6955FDK to install battery manufacturing equipment at Takasaki plantFDK plans to invest JPY 368 million in battery manufacturing equipment at its Takasaki Factory in Takasaki, Gunma. The project is scheduled to start in April 2026 and be completed by March 2027, funded through internal funds and borrowings.Automotive & TransportTakasaki, Gunma¥368MPlanned
2026.08.08FDK Corporation6955FDK to install battery manufacturing equipment at Tottori PlantFDK plans to invest in battery manufacturing equipment at its Tottori Plant in Iwami, Tottori. The ¥826 million project is scheduled to run from April 2026 through March 2027 and will be funded through internal funds and borrowings.Materials & ChemicalsIwami, Tottori¥826MPlanned
2026.08.08Fine Sinter Co., Ltd.5994Fine Sinter to install automotive sintered-products manufacturing equipment at its Kasugai headquartersFine Sinter plans to install automotive sintered-products manufacturing equipment at its headquarters in Kasugai, Aichi. The project has a total planned investment of JPY 958 million, with work scheduled from December 2024 through December 2026 and expected to add annual production capacity of 120,000 units.Automotive & TransportKasugai, Aichi¥958MBuilding
2026.08.08Glims3150Glims to develop Ono Battery Park in HyogoGlims plans to develop the Ono Battery Park in Ono, Hyogo, as part of its energy solutions business. Construction is scheduled to begin in June 2026 and finish in October 2026; the project is expected to double post-completion capacity. The total planned investment amount is not disclosed.Power & EnergyOno, Hyogonot disclosedPlanned
2026.08.08Gremz3150Gremz to build Toyohashi grid-scale battery storage facilityGremz plans to establish a grid-connected battery storage facility in Toyohashi, Aichi, with a total planned investment of ¥470 million. Construction began in September 2025 and is scheduled for completion in August 2026; the facility is expected to double the company's capacity.Power & EnergyToyohashi, Aichi¥470MBuilding
2026.08.08Grimm Co., Ltd.3150Grimms to develop Chita Battery Park in Toyohashi, AichiGrimm Co., Ltd. plans to develop the Chita Battery Park energy-storage facility in Toyohashi, Aichi, under its energy solutions business. Construction began in December 2025 and is scheduled for completion in January 2027; post-completion capacity is expected to increase by 100%.Power & EnergyToyohashi, Aichinot disclosedBuilding
2026.08.08Grims3150Grims to build Otsu Battery Park in ToyohashiGrims plans to develop the Otsu Battery Park energy-storage facility in Toyohashi, Aichi, under its energy solutions business. Construction is scheduled to start in July 2026 and finish in October 2026, with post-completion capacity expected to increase by 100%.Power & EnergyToyohashi, Aichinot disclosedPlanned
2026.08.08HABIX Corporation3895HABIX to install pet-care product manufacturing equipment at Gifu plantHABIX plans to invest JPY 4.4 billion in pet-care product manufacturing equipment at its Gifu plant in Motosu, Gifu. Construction is scheduled to start in January 2026 and be completed in March 2027, funded through internal funds and borrowings.Other ManufacturingMotosu, Gifu¥4.4BPlanned
2026.08.08Hibino Corporation2469Hibino to install high-definition LED display system at Tokyo officeHibino plans to invest ¥350 million in a high-definition LED display system for events at its Tokyo office in Minato, Tokyo. Installation is scheduled to begin in October 2026 and be completed in December 2026, funded by internal funds and borrowings.Other ManufacturingMinato, Tokyo¥350MPlanned
2026.08.08Hibino Corporation2469Hibino to install high-definition LED display system for concerts at Tokyo officeHibino plans to invest JPY 750 million in a high-definition LED display system for concerts at its Tokyo office in Minato, Tokyo. The project is scheduled to start in June 2026 and be completed in August 2026, using internal funds and borrowings.Other ManufacturingMinato, Tokyo¥750MPlanned
2026.08.08Hibino Corporation2469Hibino to install new speaker system at Tokyo officeHibino plans a ¥550 million investment in a speaker system at its Tokyo office in Koto, Tokyo. Installation is scheduled to begin in July 2026 and finish in March 2027, supporting its concert and event services business.Other ManufacturingKoto, Tokyo¥550MPlanned
2026.08.08House Foods Group Inc.2810House Foods Group to implement sales and logistics system at Osaka headquartersHouse Foods Group plans a ¥4.0 billion investment in a sales and logistics system at its Osaka headquarters in Higashiosaka, Osaka. Work began in October 2024 and is scheduled for completion in May 2027; no post-completion capacity increase is disclosed.Logistics FacilitiesHigashiosaka, Osaka¥4BPlanned
2026.08.08House Foods Group Tohoku Factory Co., Ltd.2810House Foods Group Tohoku Factory to install retort food production equipment in FukushimaHouse Foods Group Tohoku Factory is investing in retort and related food-production equipment at its headquarters and other facilities in Fukushima City. The project is scheduled to be completed in June 2026, funded through internal funds and borrowings from House Foods Group headquarters; no post-investment capacity increase is disclosed.Food & BeverageFukushima, Fukushima¥6.8BBuilding
2026.08.08House Foods Group Inc.2810House Gaban to expand spice production facilities at its Tokyo sitesHouse Gaban Co., Ltd. plans investment in spice manufacturing equipment and related facilities at its headquarters and other sites in Tokyo and elsewhere. The project began in June 2022 and is scheduled for completion in April 2028, with total planned investment of ¥5.973 billion.Food & BeverageTokyo¥6BBuilding
2026.08.08Howa Machinery, Ltd.6203Howa Machinery plans metal door and window manufacturing equipment at its Kiyosu plantHowa Machinery plans to install metal door and window manufacturing equipment at its head office plant in Kiyosu, Aichi. The ¥16 million project is scheduled to begin in March 2026 and be completed in March 2027, funded internally.Other ManufacturingKiyosu, Aichi¥16MPlanned
2026.08.08Howa Machinery, Ltd.6203Howa Machinery to expand firearms manufacturing equipment at its Kiyosu headquarters plantHowa Machinery plans a ¥312 million investment in firearms manufacturing equipment at its headquarters plant in Kiyosu, Aichi. Construction began in January 2022 and completion is scheduled for March 2027, funded internally; no post-completion capacity increase is disclosed.Other ManufacturingKiyosu, Aichi¥312MBuilding
2026.08.08Howa Machinery, Ltd.6203Howa Machinery to install special-purpose vehicle manufacturing equipment at its Kiyosu plantHowa Machinery plans to invest in special-purpose vehicle manufacturing equipment at its head office plant in Kiyosu, Aichi. The project is scheduled to start in April 2026 and be completed in February 2027, funded internally.Automotive & TransportKiyosu, Aichi¥39MPlanned
2026.08.08Howa Machinery, Ltd.6203Howa Machinery to invest in machine-tool and pneumatic-hydraulic equipment at Kiyosu plantHowa Machinery plans a ¥108 million investment in manufacturing equipment for machine tools and pneumatic-hydraulic equipment at its head plant in Kiyosu, Aichi. Construction began in March 2025 and completion is scheduled for November 2026; no post-completion capacity increase is disclosed.Machinery & RoboticsKiyosu, Aichi¥108MBuilding
2026.08.08Howa Machinery, Ltd.6203Howa Machinery to renew aging equipment at its Kiyosu head plantHowa Machinery plans a ¥47 million renewal investment at its head plant in Kiyosu, Aichi, covering aging equipment and related upgrades. The company plans to begin work in April 2026 and complete it in December 2026, supporting its machine tools, firearms, specialty vehicles and building-materials businesses.Machinery & RoboticsKiyosu, Aichi¥47MPlanned
2026.08.08Japan Airport Terminal Co., Ltd.9706Japan Airport Terminal to build North Satellite at Haneda Airport Terminal 1Japan Airport Terminal plans a new North Satellite facility at Haneda Airport's Terminal 1 in Ota, Tokyo. The project has a total planned investment of JPY 41 billion, with construction begun in 2024 and completion scheduled for around July 2026.OtherOta, Tokyo¥41BBuilding
2026.08.08Japan Animal Referral Medical Center Co., Ltd.6039Japan Animal Referral Medical Center plans Fukuoka veterinary hospitalJapan Animal Referral Medical Center is developing a planned advanced veterinary medical facility in Fukuoka, Fukuoka Prefecture. Construction started in June 2025, but the total planned investment and completion date have not been disclosed.Pharma & MedicalFukuoka, Fukuokanot disclosedBuilding
2026.08.08Japan Animal Referral Medical Center6039Japan Animal Referral Medical Center to rebuild Nagoya veterinary hospitalJapan Animal Referral Medical Center plans to rebuild its existing veterinary hospital in Nagoya, Aichi, with total planned investment of ¥3.0 billion. Construction began in May 2025 and completion is scheduled for autumn 2027.Pharma & MedicalNagoya, Aichi¥3BBuilding
2026.08.08JEOL Ltd.6951JEOL to expand factory and building facilities at Tendo plantJEOL plans a ¥9.0 billion investment in factory and building facilities at its Tendo plant in Yamagata. Construction began in May 2025 and is scheduled for completion in March 2027; the disclosure does not specify the resulting capacity increase.Other ManufacturingTendo, Yamagata¥9BBuilding
2026.08.08JEOL Ltd.6951JEOL to invest ¥2.5 billion in factory and building equipment at Akishima WorksJEOL plans to invest ¥2.5 billion in factory and building equipment at its Akishima Works in Akishima, Tokyo. Construction is scheduled to run from April 2026 through March 2027, with only a slight increase in capacity expected after completion.Other ManufacturingAkishima, Tokyo¥2.5BPlanned
2026.08.08JEOL Ltd.6951JEOL to invest ¥25 billion in factory and building facilities at Akishima WorksJEOL plans a total investment of ¥25 billion in factory and building facilities at its Akishima Works in Akishima, Tokyo. Construction began in January 2026 and is scheduled for completion in December 2027, funded through internal funds and borrowings.Other ManufacturingAkishima, Tokyo¥25BBuilding
2026.08.08JEOL Ltd.6951JEOL to invest ¥500 million in factory and production equipment at Musashimurayama plantJEOL plans a total investment of ¥500 million in factory, building, and production/manufacturing equipment at its Musashimurayama plant in Musashimurayama, Tokyo. Construction or implementation is scheduled from April 2026 through March 2027, with only a minor increase in capacity expected.Other ManufacturingMusashimurayama, Tokyo¥500MPlanned
2026.08.08JEOL Ltd.6951JEOL to upgrade production and R&D facilities at Akishima plantJEOL plans to invest ¥7 billion in production, manufacturing, development and design equipment at its Akishima plant in Tokyo. The project is scheduled to run from April 2026 through March 2027 and is expected to result in only a minor increase in capacity.Machinery & RoboticsAkishima, Tokyo¥7BPlanned
2026.08.08Kanadevia Corporation7004Kanadevia to expand machinery factory at Wakasa WorksKanadevia plans to expand its machinery factory at the Wakasa Works in Oi District, Fukui. The company expects to invest ¥580 million, with construction scheduled from November 2025 through June 2026, funded internally.Machinery & RoboticsOi District, Fukui¥580MBuilding
2026.08.08Kanadevia Corporation7004Kanadevia to relocate electronics center to its Maizuru plantKanadevia plans to relocate its electronics center to the Gankamata district of its Maizuru plant in Maizuru, Kyoto. The project has a planned total investment of ¥846 million, with construction scheduled to run from November 2024 through July 2026.Machinery & RoboticsMaizuru, Kyoto¥846MBuilding
2026.08.08Kanadevia Inc.7004Kanadeviar to build mass-production plant for water electrolysis stacks in TsuruKanadevia Inc. plans to build a mass-production plant for water electrolysis stacks in Tsuru, Yamanashi, supporting its decarbonization business. Construction began in November 2024 and is scheduled for completion in March 2029, with total planned investment of ¥8.358 billion.Power & EnergyTsuru, Yamanashi¥8.4BPlanned
2026.08.08Kanefusa Corporation5984Kanefusa to renew and rationalize circular saw production equipment at its headquarters factoryKanefusa plans to renew and rationalize circular saw production equipment at its headquarters factory in Oguchi, Aichi. The project began in June 2018 and is scheduled for completion in March 2027, with total planned investment of ¥363.8 million; no increase in capacity is disclosed.Machinery & RoboticsOguchi, Aichi¥363.8MBuilding
2026.08.08Kanefusa Corporation5984Kanefusa to renew and rationalize flat-blade production equipment at its headquarters factoryKanefusa plans to renew and rationalize flat-blade production equipment at its headquarters factory in Oguchi, Aichi. The project has a total planned investment of ¥251.1 million, began in January 2022 and is scheduled for completion in March 2027; no capacity increase is disclosed.Other ManufacturingOguchi, Aichi¥251.1MPlanned
2026.08.08Kanefusa Corporation5984Kanefusa to renew and rationalize precision cutting-tool equipment at its headquarters factoryKanefusa plans to invest ¥147.45 million in the renewal and rationalization of precision cutting-tool production equipment at its headquarters factory in Oguchi, Aichi. The project began in April 2019 and is scheduled for completion in March 2027, funded with internal resources; no capacity increase is disclosed.Machinery & RoboticsOguchi, Aichi¥147.5MBuilding
2026.08.08Kawada Construction Co., Ltd.3443Kawada Construction to install a 6-ton electric double-drum winch at Tokyo headquartersKawada Construction plans to install a 6-ton electric double-drum winch at its headquarters in Kita, Tokyo. The ¥248 million investment is scheduled to begin in April 2026 and be completed by March 2027, funded internally.Machinery & RoboticsKita, Tokyo¥248MPlanned
2026.08.08Kawada Industries, Inc.3443Kawada Industries to replace beveling machine at Tochigi factoryKawada Industries plans to replace a Hatari beveling machine at its Tochigi factory in Otawara, Tochigi. The ¥110 million project will be funded internally, with work scheduled from June 2026 through July 2027.Steel & Non-ferrous MetalsOtawara, Tochigi¥110MPlanned
2026.08.08Kyogoku Unyu Shoji Co., Ltd.9073Kyogoku Unyu Shoji to install container-related facilities in IchiharaKyogoku Unyu Shoji plans to invest in container-related facilities at a site in Ichihara, Chiba. The project is scheduled to start in April 2026 and be completed in January 2027, funded through internal funds and borrowings.Logistics FacilitiesIchihara, Chiba¥337MPlanned
2026.08.08Kyogoku Unyu Shoji9073Kyogoku Unyu Shoji to lease business vehicles for Kawasaki BranchKyogoku Unyu Shoji plans to lease business vehicles for its Kawasaki Branch in Kawasaki, Kanagawa, supporting its domestic transportation operations. The investment is scheduled from April to September 2026 and will be financed through leasing.Automotive & TransportKawasaki, Kanagawa¥16.4MPlanned
2026.08.08Matsumoto Yushi-Seiyaku Co., Ltd.4365Matsumoto Yushi-Seiyaku to expand and renew production equipment at Shizuoka PlantMatsumoto Yushi-Seiyaku plans to invest ¥339 million in the expansion and renewal of production equipment at its Shizuoka Plant in Fukuroi, Shizuoka. Construction is scheduled to run from June 2026 through March 2027, funded with internal resources.Materials & ChemicalsFukuroi, Shizuoka¥339MPlanned
2026.08.08Matsumoto Yushi-Seiyaku Co., Ltd.4365Matsumoto Yushi-Seiyaku to purchase research and analytical equipment at Osaka plantMatsumoto Yushi-Seiyaku will purchase research and analytical equipment for its head-office plant in Yao, Osaka. The company plans to spend JPY 28 million using internal funds, with installation scheduled for June 2026.R&D FacilitiesYao, Osaka¥28MPlanned
2026.08.08Matsumoto Yushi-Seiyaku Co., Ltd.4365Matsumoto Yushi-Seiyaku to renew production equipment at Osaka plantMatsumoto Yushi-Seiyaku plans to renew production equipment at its Osaka plant in Takaishi, Osaka. The company will invest ¥29 million, with work scheduled from October 2026 through March 2027, funded internally.Materials & ChemicalsTakaishi, Osaka¥29MPlanned
2026.08.08Matsumoto Yushi-Seiyaku Co., Ltd.4365Matsumoto Yushi-Seiyaku to renew production equipment at Yao headquarters plantMatsumoto Yushi-Seiyaku plans to renew production equipment at its headquarters plant in Yao, Osaka. The project is scheduled to start in September 2026 and finish in March 2027, with total planned investment of JPY 572 million.Materials & ChemicalsYao, Osaka¥572MPlanned
2026.08.08Mimaki Engineering Co., Ltd.6638Mimaki Engineering to invest in molds at Kazawa FactoryMimaki Engineering plans a JPY 335.07 million investment in mold-related equipment at its Kazawa Factory in Tomi, Nagano. Construction is scheduled to run from April 2026 through March 2027, funded by internal resources and borrowings.Machinery & RoboticsTomi, Nagano¥335.1MPlanned
2026.08.08Mitsubishi Materials Corporation5711Mitsubishi Materials to install low-alpha raw-material production equipment at Sanda PlantMitsubishi Materials plans to install low-alpha radiation raw-material production equipment at its Sanda Plant in Sanda, Hyogo. The project has a total planned investment of ¥2.2 billion, with construction scheduled from April 2025 to March 2027 and expected capacity of 9,300 kg per month.Materials & ChemicalsSanda, Hyogo¥2.2BBuilding
2026.08.08Mitsubishi Materials Corporation5711Mitsubishi Materials to install oxygen production equipment at Naoshima SmelterMitsubishi Materials plans to install new oxygen production equipment at its Naoshima Smelter in Kagawa. The project has a total planned investment of ¥8.852 billion and is scheduled for completion in April 2027, increasing oxygen production capacity by 33,300 Nm3/h.Steel & Non-ferrous MetalsNaoshima, Kagawa¥8.9BPlanned
2026.08.08Mitsubishi Materials Corporation5711Mitsubishi Materials to upgrade copper smelting facilities at Naoshima SmelterMitsubishi Materials plans a ¥13.036 billion investment in copper smelting equipment at its Naoshima Smelter in Kagawa. Construction began in September 2024 and is scheduled for completion in April 2027, increasing capacity by 112,000 tonnes per year.Steel & Non-ferrous MetalsNaoshima, Kagawa¥13BBuilding
2026.08.08Nihon Shokuhin Kako Co., Ltd.2892Nihon Shokuhin Kako to install corn steep liquor concentration equipment at Fuji plantNihon Shokuhin Kako plans to install corn steep liquor concentration equipment at its Fuji plant in Fuji, Shizuoka. The project is scheduled to start in April 2024 and be completed in December 2026, with no change in production capacity after completion.Food & BeverageFuji, Shizuoka¥1.4BBuilding
2026.08.08Niigata Eagle Co., Ltd.6486Niigata Eagle to install semiconductor-industry production equipment in GosenNiigata Eagle plans to invest JPY 722 million in production equipment and related facilities at its site in Gosen, Niigata. Construction is scheduled from April 2026 through March 2027, supporting its semiconductor-industry business segment.Semiconductors & ElectronicsGosen, Niigata¥722MPlanned
2026.08.08Nippon Gasket Co., Ltd.6470Nippon Gasket to invest in bearing-product manufacturing equipment at Shiga plantNippon Gasket plans to install bearing-product manufacturing equipment and related facilities at its Shiga Plant in Maibara, Shiga. The planned investment totals ¥1.167 billion; the disclosure does not specify a construction schedule or incremental capacity.Automotive & TransportMaibara, Shiga¥1.2BPlanned
2026.08.08Nippon Thomson Co., Ltd.6480Nippon Thomson to install bearing production and R&D equipment at Gifu facilitiesNippon Thomson plans to invest in bearing production equipment and R&D equipment at its Gifu facilities in Mino, Gifu. The company expects construction to run from April 2026 through March 2027, funded with internal resources, with total planned investment of ¥2.45 billion.Machinery & RoboticsMino, Gifu¥2.5BPlanned
2026.08.08Nittan Co., Ltd.6493Nittan to install engine-valve production equipment at Sanyo PlantNittan plans to invest ¥923 million in engine-valve production equipment at its Sanyo Plant in Sanyo-Onoda, Yamaguchi. The project is primarily for rationalization and renewal, with work scheduled from April 2026 through March 2027.Automotive & TransportSanyo-Onoda, Yamaguchi¥923MPlanned
2026.08.08Nittan Co., Ltd.6493Nittan to install precision forged-gear production equipment at Hadano factoryNittan plans to invest ¥100 million in precision forged-gear production equipment at its headquarters factory in Hadano, Kanagawa. The project is primarily intended for production rationalization and equipment renewal, with work scheduled from April 2026 through March 2027.Automotive & TransportHadano, Kanagawa¥100MPlanned
2026.08.08Nittan Co., Ltd.6493Nittan to upgrade engine-valve production equipment at its Hadano head plantNittan plans to invest JPY 295 million in engine-valve production equipment at its head plant in Hadano, Kanagawa. The project is primarily for rationalization and equipment renewal, with work scheduled from April 2026 through March 2027.Automotive & TransportHadano, Kanagawa¥295MPlanned
2026.08.08NITTAN Co., Ltd.6493NITTAN to upgrade marine engine valve production equipment at Horiyamashita PlantNITTAN plans to invest ¥984 million in marine engine valve and related production equipment at its Horiyamashita Plant in Hadano, Kanagawa. The project is primarily for rationalization and renewal, with work scheduled from April 2026 through March 2027.Automotive & TransportHadano, Kanagawa¥984MPlanned
2026.08.08Nitto Kohki Co., Ltd.6151Nitto Kohki to invest in molds, tooling and related software at Tokyo headquartersNitto Kohki plans a total investment of ¥1.032 billion in molds, jigs, tools and related software at its headquarters in Ota, Tokyo. The project is scheduled to start in April 2026 and be completed by March 2027, funded with internal resources; no post-completion capacity increase is disclosed.Machinery & RoboticsOta, Tokyo¥1BPlanned
2026.08.08O-Well Corporation7670O-Well to install coating-film formation technology development equipment at its Kanagawa technical centerO-Well plans to invest in coating-film formation technology development equipment at its technical center in Zama, Kanagawa. The ¥85 million project is scheduled to begin in April 2025 and be completed by March 2027, supporting the company's coating-related business.R&D FacilitiesZama, Kanagawa¥85MBuilding
2026.08.08O-Well Corporation7670O-Well to install riblet coating equipment at its Technology Center in ZamaO-Well plans to invest in riblet coating equipment and related machinery at its Technology Center in Zama, Kanagawa. The project is scheduled to start in April 2024 and be completed in March 2028, with total planned investment of ¥427 million.Other ManufacturingZama, Kanagawa¥427MBuilding
2026.08.08Okuma Corporation6103Okuma to install painting, drying and machinery equipment at Konan factoryOkuma plans to invest JPY 1.3 billion in painting and drying equipment and other machinery at its Konan Factory in Konan, Aichi. Construction is scheduled to begin in April 2026 and finish in March 2027; the disclosure does not state the resulting capacity increase.Machinery & RoboticsKonan, Aichi¥1.3BPlanned
2026.08.08Oriental Shiraishi Co., Ltd.1786Oriental Shiraishi to establish machinery center facility in TsukubaOriental Shiraishi plans to establish and expand its Tsukuba Machinery Center facility in Tsukuba, Ibaraki. The project has a total planned investment of JPY 454 million, funded with the company's own funds, with construction scheduled from April 2026 to March 2027.Logistics FacilitiesTsukuba, Ibaraki¥454MPlanned
2026.08.08Oriental Shiraishi Co., Ltd.1786Oriental Shiraishi to establish new facilities at Shiga PlantOriental Shiraishi plans to invest JPY 78 million in new facilities at its Shiga Plant in Kora, Shiga. Construction began in April 2026 and is scheduled for completion in June 2026, funded internally.Other ManufacturingKora, Shiga¥78MBuilding
2026.08.08Oriental Shiraishi Corporation1786Oriental Shiraishi to install new caisson construction equipment at Tsukuba Equipment CenterOriental Shiraishi plans to install new caisson construction equipment at its Tsukuba Equipment Center in Tsukuba, Ibaraki. The company plans to invest ¥1.082 billion, with work scheduled from April 2026 through March 2027, funded internally.Machinery & RoboticsTsukuba, Ibaraki¥1.1BPlanned
2026.08.08SANEI Ltd.6230SANEI to install automated high-bay warehouse at Gifu FactorySANEI plans to install an automated high-bay warehouse at its Gifu Factory in Kakamigahara, Gifu. The project has a total planned investment of ¥340 million, funded with internal resources, and is scheduled to start and finish during fiscal 2026.Logistics FacilitiesKakamigahara, Gifu¥340MPlanned
2026.08.08SANEI Ltd.6230SANEI to install automatic assembly machine at Gifu FactorySANEI plans to invest ¥180 million in an automatic assembly machine at its Gifu Factory in Kakamigahara, Gifu. The project is scheduled to start and be completed during FY2026 and will be funded internally.Machinery & RoboticsKakamigahara, Gifu¥180MPlanned
2026.08.08Sansho Electric Co., Ltd.6518Sansho Electric to install manufacturing equipment at Himeji factorySansho Electric plans to invest JPY 138.96 million in manufacturing equipment at its factory in Himeji, Hyogo. Construction is scheduled from April 2026 to March 2027, funded internally; no capacity increase is disclosed.Machinery & RoboticsHimeji, Hyogo¥139MPlanned
2026.08.08Sansho Electric Co., Ltd.6518Sansho Electric to install manufacturing equipment in TatsunoSansho Electric and Shingu Sansho Electric plan to install manufacturing equipment at their facility in Tatsuno, Hyogo. The project has a total planned investment of JPY 303.12 million, with work scheduled from April 2026 through March 2027.Other ManufacturingTatsuno, Hyogo¥303.1MPlanned
2026.08.08Sanso Electric Co., Ltd.6518Sanso Electric to invest in mold equipment at its Himeji factorySanso Electric plans to invest in mold equipment at its factory in Himeji, Hyogo. The project is scheduled to start in April 2025 and be completed by March 2027, funded with internal cash; no post-completion capacity increase is disclosed.Other ManufacturingHimeji, Hyogo¥173.2MPlanned
2026.08.08Shinden Hightex Corporation3131Shinden Hightex to develop grid-scale battery storage facility in Asahi, ChibaShinden Hightex is investing in land and equipment for a grid-scale battery storage facility in Asahi, Chiba. Construction began in July 2025 and completion is planned for October 2026, funded with internal resources; post-completion capacity is not disclosed.Power & EnergyAsahi, Chiba¥400MBuilding
2026.08.08Shinya Industries Co., Ltd.7305Shinya Industries to build office, welfare and warehouse facilities at Chiba plantShinya Industries plans to invest ¥2.12 billion in new office, employee welfare and warehouse facilities at its Chiba plant in Shisui, Chiba. Construction began in May 2025 and is scheduled for completion in April 2027; the disclosure does not state additional capacity.Steel & Non-ferrous MetalsShisui, Chiba¥2.1BBuilding
2026.08.08SMK Corporation6798SMK to install electronic components production equipment at Hitachi facilitySMK plans to invest in electronic components production equipment and related facilities at its Hitachi Business Office in Hitachi, Ibaraki. The ¥213 million project is scheduled to begin in April 2026 and be completed by March 2027, funded with internal resources.Semiconductors & ElectronicsHitachi, Ibaraki¥213MPlanned
2026.08.08SMK Corporation6798SMK to install electronic components production equipment at Toyama facilitySMK plans to invest in electronic components production equipment and related assets at its Toyama facility in Toyama City, Toyama. The project is scheduled to begin in April 2026 and be completed in March 2027, funded internally, with no post-completion capacity increase disclosed.Semiconductors & ElectronicsToyama, Toyama¥924MPlanned
2026.08.08SoftBank Group Corp.9984SoftBank plans ¥886 billion investment in domestic network and AI infrastructureSoftBank Group plans total investment of ¥886 billion from April 2026 through March 2027 in domestic base stations, network facilities, AI computing infrastructure, and AI data centers. The disclosed sites include SoftBank's headquarters in Minato, Tokyo, domestic base stations, and network centers.TelecomMinato, Tokyo¥886BPlanned
2026.08.08Soken Chemical & Engineering Co., Ltd.4972Soken Chemical to build new product mass-production and technology development facilities in SayamaSoken Chemical plans a ¥3.5 billion investment in buildings and related facilities in Sayama, Saitama, to support mass production of new products and technology development. Construction is scheduled to start in May 2026 and finish in July 2028.Materials & ChemicalsSayama, Saitama¥3.5BPlanned
2026.08.08Suzuken Co., Ltd.9987Suzuken to build Tokyo East warehouse-office facility in KotoSuzuken is developing the Tokyo East Business Office, a warehouse-office facility in Koto, Tokyo, for its pharmaceutical wholesaling business. Construction began in August 2024 and completion is scheduled for September 2026, with total planned investment of ¥1.18 billion.Logistics FacilitiesKoto, Tokyo¥1.2BBuilding
2026.08.08Suzuken Co., Ltd.9987Suzuken to develop warehouse-office facility at Kyoto siteSuzuken plans a ¥2.45 billion investment in a warehouse-office facility for its pharmaceutical wholesale business in Minami Ward, Kyoto. Construction began in April 2024 and is scheduled for completion in March 2027; the disclosure does not specify additional capacity.Logistics FacilitiesKyoto, Kyoto¥2.5BBuilding
2026.08.08Taiho Kogyo Co., Ltd.6470Taiho Kogyo plans bearing manufacturing equipment investment at Kyushu PlantTaiho Kogyo plans to invest ¥298 million in bearing-product manufacturing equipment and related facilities at its Kyushu Plant in Izumi, Kagoshima. The disclosure does not specify the construction schedule or incremental production capacity.Automotive & TransportIzumi, Kagoshima¥298MPlanned
2026.08.08Taiho Kogyo Co., Ltd.6470Taiho Kogyo plans die-casting production equipment investment at Toyota headquarters plantTaiho Kogyo plans to invest in die-casting product manufacturing equipment and related facilities at its headquarters and main plant in Toyota, Aichi. The planned investment totals ¥1.28 billion and supports the company's automotive-parts business.Automotive & TransportToyota, Aichi¥1.3BPlanned
2026.08.08Taiho Kogyo Co., Ltd.6470Taiho Kogyo plans processing equipment investment at Kasugai PlantTaiho Kogyo plans to invest ¥73 million in processing equipment and related facilities at its Kasugai Plant in Kasugai, Aichi. The disclosure identifies the investment as part of the company's automotive-parts-related business, but provides no construction schedule or capacity increase.Automotive & TransportKasugai, Aichi¥73MPlanned
2026.08.08Taiho Kogyo Co., Ltd.6470Taiho Kogyo to install bearing-product manufacturing equipment at Hosoya PlantTaiho Kogyo plans a ¥2.598 billion investment in bearing-product manufacturing equipment and related facilities at its Hosoya Plant in Toyota, Aichi. The disclosure does not specify the construction schedule or incremental production capacity.Automotive & TransportToyota, Aichi¥2.6BPlanned
2026.08.08Taiho Kogyo Co., Ltd.6470Taiho Kogyo to install bearing-product manufacturing equipment at Kokai PlantTaiho Kogyo plans to invest ¥608 million in bearing-product manufacturing equipment and related facilities at its Kokai Plant in Toyota, Aichi. The disclosure identifies this as a planned investment for its automotive-parts business, but does not state the construction schedule or additional capacity.Automotive & TransportToyota, Aichi¥608MPlanned
2026.08.08Taiho Kogyo Co., Ltd.6470Taiho Kogyo to install die-casting and bearing-product manufacturing equipment at Gifu plantTaiho Kogyo plans to invest JPY 1.086 billion in die-casting product and bearing-product manufacturing equipment at its Gifu Plant in Mitake, Gifu. The project is part of the company's automotive-parts business; no construction schedule or capacity increase is disclosed.Automotive & TransportMitake, Gifu¥1.1BPlanned
2026.08.08Taisei Lamick Co., Ltd.4994Taisei Lamick to install demonstration liquid filling machine at Hoshikawa DANGAN'S STUDIOTaisei Lamick plans to invest in a demonstration liquid filling machine for its packaging machinery business at Hoshikawa DANGAN'S STUDIO in Shiraoka, Saitama. The project is scheduled to start in April 2026 and be completed by March 2029; the total planned investment amount is not disclosed.Machinery & RoboticsShiraoka, Saitamanot disclosedPlanned
2026.08.08Taisei Lamick Co., Ltd.4994Taisei Lamick to install liquid filling machine maintenance equipment at Okayama DANGAN'S STUDIOTaisei Lamick plans to invest JPY 12.65 million in liquid filling machine maintenance equipment at its Okayama DANGAN'S STUDIO facility in Okayama City. Construction is scheduled to begin in April 2026 and be completed in March 2029, funded internally.Machinery & RoboticsOkayama, Okayama¥12.7MPlanned
2026.08.08Taisei Lamick Co., Ltd.4994Taisei Lamick to install liquid filling machine manufacturing equipment at Niigata PlantTaisei Lamick plans to invest JPY 122.6 million in liquid filling machine manufacturing equipment at its Niigata Plant in Mitsuke, Niigata. Construction began in April 2025, with completion scheduled for September 2028; the filing does not disclose additional capacity.Machinery & RoboticsMitsuke, Niigata¥122.6MBuilding
2026.08.08Takasago International Corporation4914Takasago International to develop research building at Kamakura Research InstituteTakasago International plans a research building at its Kamakura Research Institute in Kamakura, Kanagawa. The filing discloses prior spending of JPY 561 million, but does not state the total planned investment, construction schedule, or added capacity.R&D FacilitiesKamakura, Kanagawanot disclosedPlanned
2026.08.08Tanaka Shoji Co., Ltd.7619Tanaka Shoji plans warehouse investment in Niiza, SaitamaTanaka Shoji has planned a warehouse facility investment at its Niiza Warehouse in Niiza, Saitama. The total planned investment is ¥589.355 million, funded through internal funds and borrowings; construction and completion dates have not been determined.Logistics FacilitiesNiiza, Saitama¥589.4MPlanned
2026.08.08Techno Quartz Co., Ltd.255ATechno Quartz to build semiconductor processing plant at Zao-Minami site in YamagataTechno Quartz is investing in a new semiconductor processing plant at its Zao-Minami Factory in Yamagata City, Yamagata. Construction started in March 2025 and is scheduled for completion in December 2026, with the project intended to increase production capacity.Semiconductors & ElectronicsYamagata, Yamagata¥4BBuilding
2026.08.08Tochigi Nitto Kohki Co., Ltd.6151Tochigi Nitto Kohki to install manufacturing equipment in Sakura, TochigiTochigi Nitto Kohki plans to invest in manufacturing machinery and related equipment at its facility in Sakura, Tochigi. The JPY 480 million project is scheduled to begin in April 2026 and finish in March 2027, funded internally; no post-completion capacity increase is disclosed.Machinery & RoboticsSakura, Tochigi¥480MPlanned
2026.08.08Toho Air Service Co., Ltd.3443Toho Air Service plans helicopter investment at Hachijojima operationToho Air Service plans a ¥2.76 billion helicopter investment for its Hachijojima operation in Hachijo, Tokyo. The helicopters are scheduled to be introduced from October 2026 through October 2036 and will be financed through leasing.Automotive & TransportHachijo, Tokyo¥2.8BPlanned
2026.08.08Tohoku Nitto Kohki Co., Ltd.6151Tohoku Nitto Kohki to install manufacturing equipment in FukushimaTohoku Nitto Kohki plans to invest in manufacturing machinery and related equipment at its facility in Fukushima City, Fukushima. The company will fund the ¥330 million project internally, with work scheduled from April 2026 through March 2027.Machinery & RoboticsFukushima, Fukushima¥330MPlanned
2026.08.08Tokyo Electron Kyushu8035Tokyo Electron Kyushu to install process evaluation equipment at Kumamoto facilitiesTokyo Electron Kyushu plans to invest ¥43.021 billion in process evaluation machinery and related equipment at its headquarters and other facilities in Koshi, Kumamoto, and elsewhere. Construction or installation is scheduled from April 2026 through March 2028, funded internally; no capacity increase is disclosed.Semiconductors & ElectronicsKoshi, Kumamoto¥43BPlanned
2026.08.08Tokyo Electron Miyagi8035Tokyo Electron Miyagi to expand production and logistics facilities in TaiwaTokyo Electron Miyagi plans a JPY 104 billion investment in production and logistics facilities at its headquarters site in Taiwa, Miyagi. Construction began in June 2025 and is scheduled for completion in August 2027, increasing production capacity by 250%.Semiconductors & ElectronicsTaiwa, Miyagi¥104BBuilding
2026.08.08Tokyo Electron Technology Solutions8035Tokyo Electron Technology Solutions to install process-evaluation equipment at headquarters and other sites in NirasakiTokyo Electron Technology Solutions plans to invest ¥44.943 billion in process-evaluation machinery and related equipment at its headquarters and other locations, including sites in Nirasaki, Yamanashi. Construction or installation is scheduled to begin in April 2026 and finish in August 2028, funded internally.Semiconductors & ElectronicsNirasaki, Yamanashi¥44.9BPlanned
2026.08.08Tokyo Electron8035Tokyo Electron to build logistics facility at Tokyo Electron Kyushu headquarters in KoshiTokyo Electron plans to invest ¥10 billion to build a logistics facility at its Tokyo Electron Kyushu headquarters and other sites in Koshi, Kumamoto. Construction is scheduled to start in spring 2027 and be completed in spring 2028; no capacity increase is disclosed.Logistics FacilitiesKoshi, Kumamoto¥10BPlanned
2026.08.08Tokyo Electron8035Tokyo Electron to install process evaluation equipment at its Miyagi headquarters and other sitesTokyo Electron plans to invest in process evaluation machinery and related equipment at Tokyo Electron Miyagi's headquarters and other locations in Miyagi. The project is scheduled to start in April 2026 and be completed in December 2028, funded through internal resources.Semiconductors & ElectronicsTaiwa, Miyagi¥56BPlanned
2026.08.08Tokyo Electron Limited8035Tokyo Electron to invest in development and evaluation equipment at Yamanashi sitesTokyo Electron plans to install development and evaluation machinery and related equipment at its Yamanashi site in Nirasaki and other locations. The company expects to spend ¥17.841 billion, with work scheduled from April 2026 through September 2028, funded internally.Semiconductors & ElectronicsNirasaki, Yamanashi¥17.8BPlanned
2026.08.08Tokyo Radiator Manufacturing Co., Ltd.7235Tokyo Radiator Manufacturing to install heat exchanger production equipment in FujisawaTokyo Radiator Manufacturing plans to install new heat exchanger manufacturing equipment at its facility in Fujisawa, Kanagawa. Construction is scheduled to begin in April 2026 and be completed in March 2027; no investment amount or capacity increase is disclosed.Automotive & TransportFujisawa, Kanagawanot disclosedPlanned
2026.08.08Toyo Kohan Co., Ltd.5901Toyo Kohan plans steel sheet manufacturing equipment investment at Kudamatsu siteToyo Kohan plans to invest ¥10 billion in new steel sheet manufacturing equipment at its Kudamatsu site in Yamaguchi Prefecture. The project is scheduled to begin in October 2024 and run through September 2028, funded with internal resources.Steel & Non-ferrous MetalsKudamatsu, Yamaguchi¥10BPlanned
2026.08.08Toyo Seikan Co., Ltd.5901Toyo Seikan to install beverage can manufacturing equipment at Ishioka Plant and other sitesToyo Seikan plans investment in beverage-can manufacturing equipment at its Ishioka Plant and other locations in Ibaraki Prefecture and elsewhere. The project has a planned total investment of ¥8.068 billion, with work scheduled from February 2020 through March 2027.Food & BeverageIshioka, Ibaraki¥8.1BPlanned
2026.08.08Unozawa Gumi Iron Works Co., Ltd.6396Unozawa Gumi Iron Works to upgrade pump production equipment at Tamagawa factoryUnozawa Gumi Iron Works plans a ¥2.75 billion investment in various pump production equipment at its headquarters and Tamagawa Factory in Ota, Tokyo. The project began in 2025 and is scheduled for completion in 2028, financed through borrowings and internal funds.Machinery & RoboticsOta, Tokyo¥2.8BBuilding
2026.08.08Vtex Co., Ltd.7004Vtex to build receiving and parts inspection area and expand parking in HitachinakaVtex plans to construct a receiving and parts inspection area and expand its parking facilities at its site in Hitachinaka, Ibaraki. The project has a total planned investment of ¥1.65 billion, with construction scheduled from September 2025 through August 2027.Machinery & RoboticsHitachinaka, Ibaraki¥1.7BBuilding
2026.08.07A&D Holon Holdings Co., Ltd.7745A&D to invest ¥842 million in development and technology center equipment in KitamotoA&D plans to invest ¥842 million in R&D, manufacturing, and other equipment at its Development and Technology Center in Kitamoto, Saitama. The project is scheduled to begin in April 2026 and finish in March 2027; the company states that it will not increase capacity.R&D FacilitiesKitamoto, Saitama¥842MPlanned
2026.08.07A&D Holon Holdings Co., Ltd.7745A&D to invest in R&D and manufacturing equipment at Kitamoto Development and Technology CenterA&D plans to invest in research and development equipment, manufacturing equipment and other facilities at its Development and Technology Center in Kitamoto, Saitama. The project is scheduled to start in April 2026 and be completed by March 2027, with no increase in capacity expected after completion.R&D FacilitiesKitamoto, Saitama¥217MPlanned
2026.08.07A&D Holon Holdings Co., Ltd.7745A&D to upgrade R&D and manufacturing equipment at Kitamoto Development and Technology CenterA&D plans to invest JPY 79 million in research and development equipment, manufacturing equipment and other facilities at its Development and Technology Center in Kitamoto, Saitama. The project is scheduled to run from April 2026 through March 2027 and is not expected to increase capacity.Semiconductors & ElectronicsKitamoto, Saitama¥79MPlanned
2026.08.07Aida Engineering Co., Ltd.6118Aida Engineering to add large machining equipment at Sagamihara facilityAida Engineering plans to add large machining equipment at its facility in Sagamihara, Kanagawa. The project began in April 2023 and is scheduled for completion in September 2026, with a planned total investment of ¥360 million.Machinery & RoboticsSagamihara, Kanagawa¥360MBuilding
2026.08.07Aisco Corporation7698Aisco to build frozen logistics warehouse in Moroyama, SaitamaAisco plans to develop a frozen logistics warehouse in Moroyama, Saitama, for its frozen foods business. The project has a total planned investment of ¥4.266 billion, with construction scheduled from October 2025 to December 2026 and post-completion handling capacity of 1 million cases per month.Logistics FacilitiesMoroyama, Saitama¥4.3BBuilding
2026.08.07Akita DN Lighting Co., Ltd.4611Akita DN Lighting to upgrade its lighting-equipment factory in KatagamiAkita DN Lighting plans a capital investment at its lighting-equipment factory in Katagami, Akita. Construction started in June 2025 and is scheduled for completion in January 2028. The filing states an investment figure of 2,586 with 616 already paid, but does not state the unit, so the amount could not be confirmed.Other ManufacturingKatagami, Akitanot disclosedBuilding
2026.08.07Anritsu Corporation6754Anritsu to build manufacturing building and related facilities at Atsugi headquartersAnritsu plans to invest ¥3.126 billion in a manufacturing building and related facilities at its headquarters in Atsugi, Kanagawa. Construction is scheduled to run from March 2026 to March 2027 and will be funded internally.Other ManufacturingAtsugi, Kanagawa¥3.1BPlanned
2026.08.07ASJ Inc.2351ASJ server equipment at its Himeji Lab and Server CenterASJ reports server equipment at its Himeji Lab and Server Center in Himeji, Hyogo. The disclosure does not state the investment amount, construction schedule, or added capacity.Data CentersHimeji, Hyogonot disclosedPlanned
2026.08.07ASJ Inc.2351ASJ to invest in server equipment at its Kawaguchi facilityASJ discloses server equipment at its facility in Kawaguchi, Saitama. The filing does not disclose the investment amount, schedule, or added capacity.Data CentersKawaguchi, Saitamanot disclosedPlanned
2026.08.07Chugoku Marine Paints, Ltd.4617Chugoku Marine Paints subsidiary to build warehouse at Otake plantOtake Meishin Chemical, a subsidiary of Chugoku Marine Paints, plans to invest ¥498 million in a warehouse at its head plant in Otake, Hiroshima. Construction is scheduled to begin in June 2026; no completion date or added capacity was disclosed.Logistics FacilitiesOtake, Hiroshima¥498MPlanned
2026.08.07Fujikura Ltd.5803Fujikura to build new SWR factory at its Sakura siteFujikura plans to build a new SWR factory at its Sakura Business Office in Sakura, Chiba, to expand capacity in its Information and Communications segment. Construction began in August 2025, with completion planned for FY2029; capacity is expected to increase approximately twofold.TelecomSakura, Chiba¥45BBuilding
2026.08.07Fujikura Ltd.5803Fujikura to build new SWR factory at Sakura siteFujikura plans a new SWR factory at its Sakura Operations site in Sakura, Chiba, for its Information and Communications business. The project began in August 2023, is scheduled for completion in June 2026, and is expected to increase capacity by 1.3 times.TelecomSakura, Chiba¥10.1BBuilding
2026.08.07Global Cloud Estate Co., Ltd.Global Cloud Estate completes funding for grid-scale battery storage project in SakaiminatoGlobal Cloud Estate announced that its CAMEL 80 Sakaiminato grid-connected battery storage series reached 100% of its funding target. The project will deploy grid-scale batteries in Tottori Prefecture to provide balancing-market and spot-market services and support renewable-energy integration.Power & EnergySakaiminato, Tottori¥445MCompleted
2026.08.07Green Energy & Company1436Green Energy & Company starts construction of grid-scale battery storage facility in KameokaGreen Energy & Company's wholly owned subsidiary Green Energy Plus has received an additional construction order from eREX for a grid-scale battery storage facility in Kameoka, Kyoto. The facility is designed to stabilize regional power supply and demand as renewable-energy generation expands, with a rated output of 1,999 kW and nominal capacity of 8,147 kWh.Power & EnergyKameoka, Kyotonot disclosedBuilding
2026.08.07Inaba Denki Sangyo Co., Ltd.9934Inaba Denki Sangyo to develop research facilities at Innovation Center in Higashi-OsakaInaba Denki Sangyo plans a ¥10 billion investment in research facilities at its Innovation Center in Higashi-Osaka, Osaka. Construction began in January 2026 and completion is scheduled for around summer 2027; the company expects to strengthen product development and production-system capabilities.R&D FacilitiesHigashi-Osaka, Osaka¥10BBuilding
2026.08.07Isuzu Logistics Co., Ltd.7202Isuzu Logistics plans logistics facilities in Fujisawa and elsewhereIsuzu Logistics discloses planned investment in logistics facilities and other infrastructure, including a logistics center in Fujisawa, Kanagawa. The filing does not disclose the investment amount, schedule, or capacity increase.Logistics FacilitiesFujisawa, Kanagawanot disclosedPlanned
2026.08.07Isuzu Motors Limited7202Isuzu Motors plans truck and engine production and development facilities at Fujisawa PlantIsuzu Motors identifies planned investment in truck and engine production equipment and development/testing facilities at its Fujisawa Plant in Fujisawa, Kanagawa. The filing does not disclose the investment amount, schedule, or incremental capacity.Automotive & TransportFujisawa, Kanagawanot disclosedPlanned
2026.08.07Isuzu Motors Limited7202Isuzu to install engine machining and assembly equipment at Tochigi plantIsuzu Motors plans to install engine machining and assembly equipment at its Tochigi plant in Tochigi City, Tochigi. Work is scheduled to start in April 2026 and finish in March 2027; the disclosure does not state the investment amount or added capacity.Automotive & TransportTochigi, Tochiginot disclosedPlanned
2026.08.07J Stream Inc.4308J Stream to expand network capacity at its Tokyo headquartersJ Stream plans to invest in network capacity at its headquarters in Minato, Tokyo. The project is scheduled to begin in April 2026 and be completed by March 2027, funded with internal resources, with a total planned investment of ¥143.947 million.TelecomMinato, Tokyo¥143.9MPlanned
2026.08.07East Japan Railway CompanyJR East and Iwatani to develop next-generation hydrogen fuel-cell railway vehiclesEast Japan Railway Company and Iwatani Corporation have been selected for a NEDO project to develop next-generation hydrogen fuel-cell railway vehicles for commercial deployment. The two-year project will cover hybrid control, hydrogen storage units, and high-capacity hydrogen-fueling technologies, with Hitachi and Kawasaki Railcar Manufacturing supporting parts of the vehicle development.Automotive & TransportMultiple (Japan)not disclosedPlanned
2026.08.07Kansai Paint Co., Ltd.4613Kansai Paint to build new production plant in HyogoKansai Paint plans a new production facility in Hyogo, Japan, with total planned investment of ¥8.645 billion. Construction began in October 2023 and is scheduled for completion in September 2026, adding production capacity of 900 tonnes per month.Materials & ChemicalsHyogo¥8.6BBuilding
2026.08.07Kansai Paint Co., Ltd.4613Kansai Paint to develop research facilities at Concreation Technology Center in AichiKansai Paint plans a ¥13.3 billion investment in research facilities at its Concreation Technology Center in Aichi. Construction began in November 2024, with completion scheduled for March 2027; no additional production capacity is disclosed.R&D FacilitiesAichi¥13.3BBuilding
2026.08.07Kansai Paint Co., Ltd.4613Kansai Paint to restructure color center production facilitiesKansai Paint plans to restructure its color center system and production equipment at its Amagasaki site and other facilities in Japan. The project has a total planned investment of JPY 6.616 billion, began in April 2022 and is scheduled for completion in June 2027.Materials & ChemicalsAmagasaki, Hyogo¥6.6BBuilding
2026.08.07Kobe Natural Products Chemical Co., Ltd.6568Kobe Natural Products Chemical to install biopharmaceutical manufacturing equipment at KNC Bioresearch CenterKobe Natural Products Chemical plans to invest ¥62 million in biopharmaceutical and related manufacturing equipment at its KNC Bioresearch Center in Kobe, Hyogo. Work is scheduled to begin in June 2026 and be completed in March 2027, funded internally.Pharma & MedicalKobe, Hyogo¥62MPlanned
2026.08.07Kobe Natural Products Chemical Co., Ltd.6568Kobe Natural Products Chemical to install pharmaceutical manufacturing and research equipment in KobeKobe Natural Products Chemical plans to invest ¥50 million in pharmaceutical manufacturing and research equipment at its KNC Bio Research Center in Kobe, Hyogo. The project is scheduled to start in January 2026 and be completed in September 2026, funded with internal resources.Pharma & MedicalKobe, Hyogo¥50MPlanned
2026.08.07Kobe Natural Products Chemical Co., Ltd.6568Kobe Natural Products Chemical to install pharmaceutical manufacturing equipment at Izumo First PlantKobe Natural Products Chemical plans to invest ¥40 million in pharmaceutical manufacturing equipment at its Izumo First Plant in Izumo, Shimane. The project is scheduled to start in January 2026 and be completed in June 2026, funded internally; no capacity increase is disclosed.Pharma & MedicalIzumo, Shimane¥40MCompleted
2026.08.07Kobe Steel, Ltd.5406Kobe Steel to invest ¥2.07 billion in aluminium sand casting at Daian works in GifuKobe Steel will invest approximately ¥2.07 billion in its aluminium casting and forging plant at the Daian works in Mizunami, Gifu, reinforcing welding and finishing processes and introducing a sand-mould 3D printer and X-ray CT inspection. The equipment serves aluminium and magnesium sand-cast parts for aerospace and defence. Operation is planned for 2028.Steel & Non-ferrous MetalsMizunami, Gifu¥2.1BPlanned
2026.08.07Kohjin Bio Co., Ltd.177AKohjin Bio to build cell culture facility at its Sakado headquartersKohjin Bio plans to establish a cell culture facility at its headquarters in Sakado, Saitama, to expand its cell-processing business. The project has a total planned investment of ¥388.084 million, with construction scheduled from June 2025 to November 2026 and capacity expected to increase by approximately 1,000 specimens.Pharma & MedicalSakado, Saitama¥388.1MBuilding
2026.08.07Kohjin Bio Co., Ltd.177AKohjin Bio to build new culture media manufacturing plant in OmuraKohjin Bio plans to establish a new culture media manufacturing plant at its Nagasaki Factory in Omura, Nagasaki. Construction began in July 2025 and completion is scheduled for March 2030; the total planned investment and post-completion capacity have not been disclosed.Pharma & MedicalOmura, Nagasakinot disclosedBuilding
2026.08.07Kohjin Bio Co., Ltd.177AKohjin Bio to install emergency power equipment at its Saitama headquartersKohjin Bio plans to install emergency power equipment at its headquarters in Sakado, Saitama. The project is scheduled to begin in January 2027 and be completed in June 2027, funded with proceeds from a capital increase.Power & EnergySakado, Saitama¥92.1MPlanned
2026.08.07KoSo Co., Ltd.7504KoSo to build office warehouse at Morioka Sales OfficeKoSo plans to construct an office warehouse at its Morioka Sales Office in Iwate Prefecture. The project has a total planned investment of ¥2.45 billion, with construction scheduled from August 2024 to October 2026 and a post-completion gross floor area of approximately 10,000 sqm.Logistics FacilitiesMorioka, Iwate¥2.5BBuilding
2026.08.07Kotobuki Spirits Co., Ltd.2222Kotobuki Spirits to build a new factory in Miyakojima, OkinawaKotobuki Spirits plans to invest JPY 2.882 billion in a factory operated by KMf in Miyakojima, Okinawa. Construction began in March 2026 and is scheduled for completion in June 2027, funded with internal resources.Food & BeverageMiyakojima, Okinawa¥2.9BBuilding
2026.08.07Kyoei Engineering Co., Ltd.7287Kyoei Engineering to invest ¥244 million in equipment at Agano headquarters factoryKyoei Engineering plans to invest ¥244 million in other equipment at its headquarters and main factory in Agano, Niigata. The project is intended to support the company's automotive components business, with work scheduled from November 2025 through October 2026 and funded internally.Automotive & TransportAgano, Niigata¥244MBuilding
2026.08.07Lead Co., Ltd.6982Lead to install manufacturing equipment at its Kumagaya head plantLead plans to install manufacturing equipment at its head plant in Kumagaya, Saitama, for its automotive-parts segment. The planned investment totals ¥493 million, with work started in September 2025; no completion date or post-investment capacity increase is disclosed.Automotive & TransportKumagaya, Saitama¥493MBuilding
2026.08.07Marutai Co., Ltd.2919Marutai to install stick ramen production equipment at Saga FactoryMarutai plans to invest in stick ramen production equipment at its Saga Factory in Karatsu, Saga. The project is scheduled to begin in March 2026 and is expected to be completed in July 2027, with total planned investment of JPY 2.1 billion.Food & BeverageKaratsu, Saga¥2.1BPlanned
2026.08.07Miralita Co., Ltd.Miralita to develop and sell grid-scale battery storage facility in KitakyushuMiralita is raising funds for Phase II of a grid-scale battery storage project in Yahatanishi Ward, Kitakyushu, Fukuoka. Funding will cover the acquisition of project rights and the procurement, installation and construction of battery equipment; the completed facility and rights are planned for lump-sum sale to a corporate end user after approximately 10 months of operation.Power & EnergyKitakyushu, Fukuokanot disclosedPlanned
2026.08.07Montedio Football Park Co., Ltd.8892Montedio Football Park to build new Montedio Yamagata stadium in TendoMontedio Football Park plans to build a new stadium for Montedio Yamagata in Tendo, Yamagata. The project has a total planned investment of ¥16.5 billion, with construction scheduled to begin in March 2026 and finish in August 2028, funded by internal funds, borrowings and subsidies.OtherTendo, Yamagata¥16.5BPlanned
2026.08.07Murakami Corporation7292Murakami Corporation to install rearview-mirror manufacturing equipment at Fujieda plantMurakami Corporation plans to invest in rearview-mirror manufacturing equipment at its Fujieda plant in Shizuoka. The JPY 279 million project will support production preparation for a new-product changeover and rationalization, with little direct capacity increase expected.Automotive & TransportFujieda, Shizuoka¥279MPlanned
2026.08.07Muro Corporation7264Muro Corporation to install injection molding and mold-making equipment at Kasama plantMuro Corporation plans to invest in injection molding and mold-making equipment at the Kasama plant in Kasama, Ibaraki. The project is scheduled to start in April 2026 and be completed by March 2027, with total planned investment of ¥33.704 million.Other ManufacturingKasama, Ibaraki¥33.7MPlanned
2026.08.07Muro Corporation7264Muro Corporation to install press and die-making equipment at Karasuyama PlantMuro Corporation plans to invest in press and die-making equipment at its Karasuyama Plant in Nasukarasuyama, Tochigi. The ¥341.98 million project is scheduled to begin in April 2026 and be completed in March 2027 for the company's metal-related parts business.Other ManufacturingNasukarasuyama, Tochigi¥342MPlanned
2026.08.07Muro Corporation7264Muro Corporation to install press and surface-treatment equipment at Kiyohara Head Office PlantMuro Corporation plans to invest in press and surface-treatment equipment at its Kiyohara Head Office Plant in Utsunomiya, Tochigi, supporting its metal-related parts business. The project is scheduled to start in April 2026 and be completed in March 2027, with a total planned investment of JPY 312 million.Other ManufacturingUtsunomiya, Tochigi¥312MPlanned
2026.08.07Muro Corporation7264Muro Corporation to install press and surface-treatment equipment at Komono plantMuro Corporation plans to invest in press and surface-treatment equipment at its Komono plant in Mie. The project is scheduled to begin in April 2026 and be completed by March 2027, with total planned investment of JPY 196.258 million.Materials & ChemicalsKomono, Mie¥196.3MPlanned
2026.08.07Nippon Chemical Industrial Co., Ltd.4094Nippon Chemical Industrial to install copper oxide production equipment at Saitama PlantNippon Chemical Industrial plans to invest JPY 800 million in copper oxide production equipment at its Saitama Plant in Soka, Saitama. Construction is scheduled to begin in December 2026 and finish in March 2030, funded with internal resources.Materials & ChemicalsSoka, Saitama¥800MPlanned
2026.08.07Nippon Steel Corporation5401Nippon Steel to build electric arc furnace at Kyushu Works in KitakyushuNippon Steel plans to install an electric arc furnace and associated equipment at its Kyushu Works in Kitakyushu, Fukuoka. The project is scheduled to start in May 2025 and be completed in the second half of fiscal 2029, with total planned investment of ¥630.2 billion.Steel & Non-ferrous MetalsKitakyushu, Fukuoka¥630.2BBuilding
2026.08.07Nippon Steel Corporation5401Nippon Steel to build electric arc furnace at Setouchi Works in HimejiNippon Steel plans to invest ¥140 billion in an electric arc furnace and associated facilities at its Setouchi Works in Himeji, Hyogo. Construction began in May 2025 and is scheduled for completion in the second half of fiscal 2029; the project is funded through internal funds and borrowings.Steel & Non-ferrous MetalsHimeji, Hyogo¥140BBuilding
2026.08.07Nippon Steel Corporation5401Nippon Steel to install electric arc furnace at Yamaguchi WorksNippon Steel plans to invest in an electric arc furnace and ancillary equipment at its Yamaguchi Works in Shunan, Yamaguchi. Construction began in May 2025, with completion scheduled for the second half of fiscal 2028; the total planned investment is ¥98.5 billion.Steel & Non-ferrous MetalsShunan, Yamaguchi¥98.5BBuilding
2026.08.07Nippon Steel Corporation5401Nippon Steel to install No. 3 coke oven at Kimitsu WorksNippon Steel plans a new No. 3 coke oven, including associated equipment, at its East Japan Works in Kimitsu, Chiba. The project has a total planned investment of ¥39.0 billion and began in February 2022, with completion scheduled for the first half of fiscal 2026.Steel & Non-ferrous MetalsKimitsu, Chiba¥39BBuilding
2026.08.07Nissin Engineering Co., Ltd.6157Nissin Engineering to install cutting-tool manufacturing equipment in MiyagiNissin Engineering, a subsidiary of Nissin Tools Co., Ltd., plans to invest JPY 206.45 million in cutting-tool manufacturing equipment at its facility in Taiwa, Miyagi. Installation is scheduled to begin in April 2026, with completion planned between June and November 2026; the investment will be funded internally.Machinery & RoboticsTaiwa, Miyagi¥206.5MPlanned
2026.08.07Nomura Real Estate Co., Ltd.3231Nomura Real Estate to redevelop Fukuoka Tenjin Center BuildingNomura Real Estate plans to redevelop the Fukuoka Tenjin Center Building in Chuo Ward, Fukuoka City. The planned structure will be a steel-framed building with three basement floors and 21 above-ground floors, with total investment of ¥48.523 billion.OtherFukuoka, Fukuoka¥48.5BPlanned
2026.08.07NS Advantech Co., Ltd.7287NS Advantech to install resin molding equipment at Takami PlantNS Advantech plans to invest ¥240 million in resin molding equipment at its Takami Plant in Nagaoka, Niigata. The project is scheduled to begin in February 2026 and be completed in January 2027, supporting the company's resin compounding business.Materials & ChemicalsNagaoka, Niigata¥240MPlanned
2026.08.07Press Kogyo Co., Ltd.7246Press Kogyo to install axle production equipment at Fujisawa PlantPress Kogyo plans to install axle production equipment at its Fujisawa Plant in Fujisawa, Kanagawa. The project has a total planned investment of ¥398 million, started in November 2022 and is scheduled for completion in September 2026.Automotive & TransportFujisawa, Kanagawa¥398MBuilding
2026.08.07Press Kogyo Co., Ltd.7246Press Kogyo to install axle production equipment at Saitama PlantPress Kogyo plans a ¥1.557 billion investment in axle production equipment at its Saitama Plant in Kawagoe, Saitama. Construction began in September 2025 and is scheduled for completion in June 2026.Automotive & TransportKawagoe, Saitama¥1.6BBuilding
2026.08.07Press Kogyo Co., Ltd.7246Press Kogyo to install frame production equipment at Fujisawa plantPress Kogyo plans to invest ¥173 million in frame production equipment at its Fujisawa plant in Fujisawa, Kanagawa. The project began in April 2024 and is scheduled for completion in March 2027; no post-completion capacity increase is disclosed.Automotive & TransportFujisawa, Kanagawa¥173MBuilding
2026.08.07Press Kogyo Co., Ltd.7246Press Kogyo to install frame production equipment at Utsunomiya PlantPress Kogyo plans to invest ¥104 million in frame production equipment at its Utsunomiya Plant in Shimotsuke, Tochigi. Construction is scheduled to run from November 2025 through January 2027; the disclosure does not state the resulting capacity increase.Automotive & TransportShimotsuke, Tochigi¥104MBuilding
2026.08.07Press Kogyo Co., Ltd.7246Press Kogyo to install frame production equipment at Utsunomiya PlantPress Kogyo plans to invest ¥274 million in frame production equipment at its Utsunomiya Plant in Shimotsuke, Tochigi. Construction is scheduled to run from October 2025 to July 2026 for its automotive-related business.Automotive & TransportShimotsuke, Tochigi¥274MBuilding
2026.08.07Press Kogyo Co., Ltd.7246Press Kogyo to install press processing equipment at its Fujisawa plantPress Kogyo plans a ¥2.812 billion investment in press processing equipment at its Fujisawa plant in Fujisawa, Kanagawa. Construction began in April 2025 and completion is scheduled for January 2028; the disclosure does not state the resulting capacity increase.Automotive & TransportFujisawa, Kanagawa¥2.8BBuilding
2026.08.07QLS Holdings Corporation7075QLS Holdings to build an authorized childcare facility in TokyoQLS Holdings plans to develop equipment and facilities for one authorized childcare center in Tokyo. The project is scheduled to start in July 2026 and be completed in January 2028, adding capacity for 75 children.OtherTokyo¥425.3MPlanned
2026.08.07Sanritsu Co., Ltd.9366Sanritsu to build new warehouse in Narita, ChibaSanritsu is investing in a new warehouse and logistics facility in Narita, Chiba, to support its packaging, transport and warehousing businesses. Construction began in April 2025 and is scheduled for completion in July 2026, with total planned investment of JPY 5.3 billion.Logistics FacilitiesNarita, Chiba¥5.3BBuilding
2026.08.07Sato Foods Industry Co., Ltd.2814Sato Foods Industry to expand production equipment at its Third Plant in KasugaiSato Foods Industry plans the third-phase expansion of production equipment at its Third Plant in Kasugai, Aichi. The project is expected to increase production capacity by 50%; construction began in December 2010, while the completion date remains undetermined.Food & BeverageKasugai, Aichi¥1.7BBuilding
2026.08.07Shofu Inc.7979Shofu to build new dental-products factory in KokaShofu is building a new headquarters factory for its Shiga Shofu subsidiary in Shigaraki, Koka, Shiga, for its dental-related business. The project has a total planned investment of JPY 1.37 billion, with construction scheduled from December 2024 to December 2026.Pharma & MedicalKoka, Shiga¥1.4BBuilding
2026.08.07Shofu Inc.7979Shofu to rebuild headquarters factory in KyotoShofu plans to rebuild its headquarters factory in Higashiyama Ward, Kyoto, for its dental-related business. The project has a total planned investment of ¥4.091 billion, began in July 2023, and is scheduled for completion in August 2028.Pharma & MedicalKyoto, Kyoto¥4.1BBuilding
2026.08.07Stem Cell Research Institute Co., Ltd.7096Stem Cell Research Institute to establish cell processing and storage center in KanagawaStem Cell Research Institute plans to develop a cell processing and storage center in Kanagawa, including land, buildings, cell processing equipment and cell storage equipment. The project is expected to increase cell processing and storage capacity, with construction scheduled from February 2025 through September 2027 and total planned investment of ¥1.1 billion.Pharma & MedicalKanagawa¥1.1BBuilding
2026.08.07Sumitomo Warehouse Co., Ltd.9303Sumitomo Warehouse to build 135,040-sqm rental warehouse in MisatoSumitomo Warehouse is constructing a 135,040-sqm rental warehouse in Misato, Saitama, as part of its real estate business. The project started in January 2025, is scheduled for completion in August 2026, and has a total planned investment of ¥9.172 billion.Logistics FacilitiesMisato, Saitama¥9.2BBuilding
2026.08.07Tamagawa Holdings Co., Ltd.6838Tamagawa HD to develop grid-scale battery storage facility in Iga, MieTamagawa Holdings' subsidiary Tamagawa Energy will acquire the site and development rights for a grid-scale battery storage facility in Iga, Mie, from Green Energy Plus. The project is planned for grid connection in September 2027 and will have a rated output of 1,999 kW and nominal capacity of 8,000 kWh; total development cost is ¥570 million excluding tax.Power & EnergyIga, Mie¥120MPlanned
2026.08.07Tanabe Engineering Co., Ltd.1828Tanabe Engineering to build Iwasehama facility in ToyamaTanabe Engineering plans to construct the Iwasehama worksite in Toyama City, comprising a factory and offices. The project has a total planned investment of ¥272.63 million, with construction scheduled from July 2026 through June 2027.Other ManufacturingToyama, Toyama¥272.6MPlanned
2026.08.07TOA Corporation6809TOA to install new production equipment at Akoos in MaibaraTOA plans to invest in new production equipment at its Akoos subsidiary in Maibara, Shiga. The company will fund the ¥128 million project internally, with work scheduled from April 2026 through March 2027.Other ManufacturingMaibara, Shiga¥128MPlanned
2026.08.07TOA Corporation6809TOA to install production equipment at Takex in TakeoTOA plans to install production equipment at its Takex facility in Takeo, Saga. The project is scheduled to start in April 2026 and be completed by March 2027, with planned investment of ¥87 million funded internally.Other ManufacturingTakeo, Saga¥87MPlanned
2026.08.07Tokyo Kaikan Co., Ltd.9701Tokyo Kaikan to renew confectionery factory at Sengoku BuildingTokyo Kaikan plans to renew aging equipment at its confectionery factory in the Sengoku Building in Koto, Tokyo. Construction is scheduled from February to March 2027, funded internally; the disclosure does not state an investment amount or quantitative capacity increase.Food & BeverageKoto, Tokyonot disclosedPlanned
2026.08.07UD Trucks Corporation7202UD Trucks to invest in production equipment at Ageo factory and other sitesUD Trucks plans to install production equipment and related facilities at its Ageo factory in Ageo, Saitama, and other locations. Work is scheduled from April 2026 through March 2027; no investment amount or added capacity is disclosed.Automotive & TransportAgeo, Saitamanot disclosedPlanned
2026.08.06Ajikan Co., Ltd.2907Ajikan to build Kanto Logistics Center in KasukabeAjikan plans to build the Kanto Logistics Center in Kasukabe, Saitama, to support its commercial food products business. The project has a planned total investment of ¥2.8 billion, with construction scheduled to begin in July 2026 and completion planned for September 2027.Logistics FacilitiesKasukabe, Saitama¥2.8BPlanned
2026.08.06Ajikan Co., Ltd.2907Ajikan to install freezing equipment at its Tsukuba plantAjikan plans to install freezing equipment at its Tsukuba plant in Ushiku, Ibaraki, to expand or enhance its capacity for commercial food products. The project is scheduled to begin in April 2026 and be completed in August 2026, with total planned investment of ¥248 million.Food & BeverageUshiku, Ibaraki¥248MPlanned
2026.08.06Ajikan Co., Ltd.2907Ajikan to renew refrigeration equipment at Shizuoka plantAjikan plans to renew the refrigeration equipment at its Shizuoka plant in Shimada, Shizuoka. The project has a total planned investment of ¥85 million, with work scheduled from April 2026 through February 2027, funded by internal funds and borrowings.Food & BeverageShimada, Shizuoka¥85MPlanned
2026.08.06Aoi Tech Co., Ltd.7276Aoi Tech to install automotive lighting manufacturing equipment in HamamatsuAoi Tech plans to invest JPY 1.411 billion in automotive lighting manufacturing equipment at its facility in Hamamatsu, Shizuoka. Construction or installation began in March 2026 and is scheduled for completion in March 2027, funded internally.Automotive & TransportHamamatsu, Shizuoka¥1.4BBuilding
2026.08.06Arisawa Manufacturing Co., Ltd.5208Arisawa Manufacturing to make additional equipment investments to expand production capacityArisawa Manufacturing announced additional fixed-asset acquisitions and equipment investments aimed at expanding production capacity. The disclosure does not provide further project details in the supplied text.Materials & Chemicalsnot disclosedPlanned
2026.08.06ASB Machinery6284ASB Machinery to expand mold-making equipment and automation at Indian subsidiaryASB Machinery will invest in its wholly owned Indian production subsidiary, ASB INTERNATIONAL PVT. LTD., to expand machining equipment for mold manufacturing, introduce automation, and renovate an existing factory building. The investment will launch a fourth factory and significantly increase production capacity; implementation is planned during FY2027 using internal funds.Machinery & RoboticsIndia¥5.6BPlanned
2026.08.06Carlit Co., Ltd.4275Carlit to expand chemical-product manufacturing capacity in ShibukawaCarlit plans to invest JPY 1.129 billion in chemical-product manufacturing equipment at its Shibukawa, Gunma site. Construction started in May 2025 and completion is scheduled for December 2026, with the project expected to increase production capacity.Materials & ChemicalsShibukawa, Gunma¥1.1BBuilding
2026.08.06Carlit Co., Ltd.4275Carlit to expand solid propellant production facilities in Shibukawa, GunmaCarlit plans to invest in solid propellant manufacturing equipment at its Shibukawa, Gunma site. Construction began in April 2025 and is scheduled for completion in March 2028, increasing production capacity.Materials & ChemicalsShibukawa, Gunma¥7.9BBuilding
2026.08.06Carlit Co., Ltd.4275Carlit to install chemical-products manufacturing equipment at Shibukawa facilityCarlit plans to invest JPY 2.193 billion in chemical-products manufacturing equipment at its facility in Shibukawa, Gunma. Construction is scheduled to begin in October 2026 and finish in March 2028, with the project expected to improve product quality and safety.Materials & ChemicalsShibukawa, Gunma¥2.2BPlanned
2026.08.06Como Co., Ltd.2224Como to upgrade baking and packaging line at its Komaki main factoryComo plans to invest ¥2.333 billion to renovate the baking and packaging line at its main factory in Komaki, Aichi. Construction started in November 2025 and is scheduled for completion in September 2027, funded through internal funds and borrowings.Food & BeverageKomaki, Aichi¥2.3BBuilding
2026.08.06Dai-Dan Co., Ltd.1980Dai-Dan to build Yao training center in OsakaDai-Dan plans to construct a training center comprising a building and associated facilities in Yao, Osaka. Construction began in August 2025 and is scheduled for completion in February 2027, with total planned investment of ¥1.815 billion.R&D FacilitiesYao, Osaka¥1.8BBuilding
2026.08.06Digital Dynamic Co., Ltd.Digital Dynamic to develop nationwide distributed AI data center networkDigital Dynamic is advancing a distributed AI data center business that combines GPU server procurement, AI cluster construction, data center design and operations. It plans to select sites and launch projects sequentially by FY2027, targeting a nationwide network with total receiving capacity of 1 GW by 2030; named initiatives include facilities in Fukushima's Futaba and Kagoshima's Satsumasendai.Data CentersMultiple (Japan)not disclosedPlanned
2026.08.06EDP Corporation7794EDP to acquire land for new site in Ibaraki, OsakaEDP plans to purchase land at a separate site in Ibaraki, Osaka, using internal funds. The land acquisition is scheduled to begin in September 2026 and be completed in April 2027.Other ManufacturingIbaraki, Osaka¥180MPlanned
2026.08.06EDP Corporation7794EDP to install 915 MHz large-area growth equipment at Yokoe FactoryEDP plans to install a 915 MHz large-area growth system at its Yokoe Factory in Ibaraki, Osaka Prefecture. The company expects construction or installation to begin in October 2026 and be completed in October 2027, funded internally.Materials & ChemicalsIbaraki, Osaka¥15MPlanned
2026.08.06EDP Corporation7794EDP to install and modify high-vacuum growth equipment at Yokoe PlantEDP plans to install and modify high-vacuum growth equipment at its Yokoe Plant in Ibaraki, Osaka Prefecture. The project is scheduled to start in May 2026 and be completed in April 2027, with a total planned investment of ¥55 million.Materials & ChemicalsIbaraki, Osaka¥55MPlanned
2026.08.06EDP Corporation7794EDP to install double-sided lapping equipment at its Ibaraki development centerEDP plans to install double-sided lapping equipment at its Development Department site in Ibaraki, Osaka. The ¥30 million project is scheduled to begin in August 2026 and be completed in February 2027, funded with internal resources.Machinery & RoboticsIbaraki, Osaka¥30MPlanned
2026.08.06EDP Corporation7794EDP to install standard polishing equipment at Shima FactoryEDP plans to install standard polishing equipment at its Shima Factory in Ibaraki, Osaka, to expand or renew its production capacity. The project is scheduled to start in August 2026 and be completed in March 2027, funded through internal resources.Other ManufacturingIbaraki, Osaka¥40MPlanned
2026.08.06EDP Corporation7794EDP to install water-jet laser at Shimajiri Plant in IbarakiEDP plans to invest JPY 120 million in water-jet laser equipment at its Shimajiri Plant in Ibaraki, Osaka. Construction or installation is scheduled to begin in September 2026 and be completed in October 2027, funded internally.Machinery & RoboticsIbaraki, Osaka¥120MPlanned
2026.08.06EXEO Group, Inc.1951EXEO Group to build new Fukuyama Technology Center in HiroshimaEXEO Group plans to establish a new technology center in Fukuyama, Hiroshima, to support its telecommunications carrier business. The project is scheduled to start in January 2025 and be completed in December 2027, funded with the company's own resources.R&D FacilitiesFukuyama, Hiroshima¥1.8BBuilding
2026.08.06EXEO Group, Inc.1951EXEO Group to build new technical center in KawagoeEXEO Group plans to establish the Kawagoe Comprehensive Technical Center in Kawagoe, Saitama, for its telecommunications carrier segment. Construction began in December 2025 and is scheduled for completion in October 2027, funded with internal resources.R&D FacilitiesKawagoe, Saitama¥3BBuilding
2026.08.06EXEO Group, Inc.1951EXEO Group to renovate construction office building at Fuchu technology centerEXEO Group plans to renovate the construction office building at its Fuchu General Technology Center in Tokyo. The project has a total planned investment of JPY 2.727 billion, with construction starting in January 2024 and completion scheduled for August 2026.TelecomFuchu, Tokyo¥2.7BBuilding
2026.08.06Fukui Murata Manufacturing Co., Ltd.6981Fukui Murata Manufacturing to install component production equipment in EchizenFukui Murata Manufacturing plans to invest ¥32 billion in component production equipment at its facilities in Echizen and elsewhere in Fukui Prefecture. Construction began in March 2026, with completion scheduled for March 2027; the disclosure does not specify additional capacity.Semiconductors & ElectronicsEchizen, Fukui¥32BBuilding
2026.08.06Hirata Corporation6258Hirata plans production factory investment at Shichijo No. 2 Plant in KikuchiHirata Corporation is investing in production-factory facilities at its Shichijo No. 2 Plant in Kikuchi, Kumamoto, supporting its automotive-, semiconductor- and industrial automation-related businesses. The planned investment totals ¥2.45 billion, with construction scheduled from May 2025 through June 2026 and funded through internal funds and borrowings.Machinery & RoboticsKikuchi, Kumamoto¥2.5BBuilding
2026.08.06Home Eco Logistics Co., Ltd.1911Home Eco Logistics launches new housing-materials distribution center in AtsugiSumitomo Forestry subsidiary Home Eco Logistics began operations at the Atsugi DC, its first self-operated logistics facility, on August 6, 2026. Located within Nippon GLP's MARQ Tomei Atsugi logistics complex, the center consolidates housing-materials logistics for the group and building-material manufacturers, serving 15 prefectures across the Kanto and central Japan regions.Logistics FacilitiesAtsugi, Kanagawanot disclosedCompleted
2026.08.06Izumo Murata Manufacturing Co., Ltd.6981Izumo Murata Manufacturing to install component production equipment in IzumoIzumo Murata Manufacturing plans to invest ¥58.0 billion in component production equipment at its facilities in Izumo, Shimane, and elsewhere. Construction or installation is scheduled to begin in March 2026 and be completed in March 2027, funded with cash on hand.Semiconductors & ElectronicsIzumo, Shimane¥58BPlanned
2026.08.06JC Bottling Co., Ltd.4275JC Bottling to install soft-drink manufacturing equipment in ShibukawaJC Bottling plans to install soft-drink manufacturing equipment at its facility in Shibukawa, Gunma. The project has a total planned investment of JPY 4.231 billion, funded through internal funds, borrowings and subsidies, with work scheduled from April to October 2026.Food & BeverageShibukawa, Gunma¥4.2BPlanned
2026.08.06JX Advanced Metals Corporation5016JX Advanced Metals to build shared utilities for new Hitachinaka factoryJX Advanced Metals plans shared utility infrastructure associated with the construction of a new factory at its Hitachinaka plant in Hitachinaka, Ibaraki. The project has a total planned investment of ¥47.24 billion, began in March 2022, and is scheduled for completion in April 2029.Other ManufacturingHitachinaka, Ibaraki¥47.2BBuilding
2026.08.06JX Advanced Metals Corporation5016JX Advanced Metals to install indium phosphide substrate manufacturing equipment at Isohara (Phase 1)JX Advanced Metals plans to install indium phosphide substrate manufacturing equipment at its Isohara site in Kitaibaraki, Ibaraki. The project is scheduled to start in October 2025 and be completed in August 2027, with planned investment of ¥3.898 billion.Semiconductors & ElectronicsKitaibaraki, Ibaraki¥3.9BBuilding
2026.08.06JX Advanced Metals Corporation5016JX Advanced Metals to install indium phosphide substrate manufacturing equipment at Isohara (Phase 2)JX Advanced Metals plans to install indium phosphide substrate manufacturing equipment at its Isohara site in Kitaibaraki, Ibaraki. The project has a total planned investment of JPY 1.918 billion, with construction scheduled to begin in December 2025 and completion planned for January 2028.Semiconductors & ElectronicsKitaibaraki, Ibaraki¥1.9BPlanned
2026.08.06JX Advanced Metals Corporation5016JX Advanced Metals to install indium phosphide substrate manufacturing equipment in Kitaibaraki (Phase 1)JX Advanced Metals plans to install indium phosphide substrate manufacturing equipment at its Isohara site in Kitaibaraki, Ibaraki. Construction is scheduled to run from July 2025 through January 2027, supporting capacity in the semiconductor materials business.Semiconductors & ElectronicsKitaibaraki, Ibaraki¥1.5BBuilding
2026.08.06JX Advanced Metals Corporation5016JX Advanced Metals to install indium phosphide substrate manufacturing equipment in Kitaibaraki (Phase 2)JX Advanced Metals plans to invest JPY 18.01 billion in indium phosphide substrate manufacturing equipment at its Isohara site in Kitaibaraki, Ibaraki. Construction is scheduled to begin in April 2026, with completion planned for August 2030.Semiconductors & ElectronicsKitaibaraki, Ibaraki¥18BPlanned
2026.08.06JX Advanced Metals Corporation5016JX Advanced Metals to install new product manufacturing equipment at Hitachi-area facilitiesJX Advanced Metals plans to install new product manufacturing equipment at its Hitachi and Hitachinaka sites in Ibaraki Prefecture. The project has a total planned investment of ¥13.224 billion, began in July 2024, and is scheduled for completion in March 2030.Materials & ChemicalsHitachi and Hitachinaka, Ibaraki¥13.2BBuilding
2026.08.06JX Advanced Metals Corporation5016JX Advanced Metals to install semiconductor-material manufacturing equipment in HitachinakaJX Advanced Metals plans to invest ¥23.11 billion in semiconductor-material manufacturing equipment at its Hitachinaka site in Hitachinaka, Ibaraki. Construction is scheduled to start in October 2026 and finish in September 2028; the disclosure does not specify the resulting capacity increase.Semiconductors & ElectronicsHitachinaka, Ibaraki¥23.1BPlanned
2026.08.06Kaneka Medix Corporation4118Kaneka Medix to build medical device plant in TomakomaiKaneka Medix is building a new medical device factory in Tomakomai, Hokkaido, to manufacture catheters. Construction started in October 2024, with completion planned for March 2027 and post-completion capacity of 1 million catheters per year.Pharma & MedicalTomakomai, Hokkaido¥9.4BBuilding
2026.08.06Kaneka Corporation4118Kaneka to acquire biodegradable biopolymer pilot facility in TakasagoKaneka plans to acquire a biodegradable biopolymer pilot facility at its Takasago Plant in Takasago, Hyogo. The project is scheduled to start in February 2026 and be completed in September 2027, with a post-completion pilot capacity of 3 cubic meters.Materials & ChemicalsTakasago, Hyogo¥5.7BPlanned
2026.08.06Kaneka Corporation4118Kaneka to expand biodegradable biopolymer production capacity at Takasago PlantKaneka is expanding biodegradable biopolymer production facilities at its Takasago Plant in Takasago, Hyogo. The project started in January 2022 and is scheduled for completion in March 2027, adding 15,000 tonnes per year of capacity.Materials & ChemicalsTakasago, Hyogo¥13.6BBuilding
2026.08.06Kaneka Corporation4118Kaneka to expand electronic materials production equipment at its Shiga plantKaneka plans to expand electronic materials manufacturing equipment at its Shiga plant in Otsu, Shiga Prefecture. The project began in January 2018, is scheduled for completion in April 2028, and is expected to increase the company's global production capacity by approximately 30%.Materials & ChemicalsOtsu, Shiga¥10.3BBuilding
2026.08.06Kaneka Corporation4118Kaneka to install new cogeneration facilities at its Takasago plantKaneka is investing in new cogeneration facilities and related equipment at its Takasago Plant in Takasago, Hyogo. The project is scheduled to begin in April 2024 and be completed in January 2027, adding 40 MW of power-generation capacity and 95 tonnes per hour of boiler capacity.Power & EnergyTakasago, Hyogo¥17.3BBuilding
2026.08.06Kaneso Co., Ltd.5979Kaneso to install automated warehouse and upgrade its Asahi plantKaneso plans to invest in an automated warehouse and factory improvement works at its Asahi Plant in Asahi, Mie. The project is scheduled to begin in April 2026 and be completed in November 2026, with the company expecting higher production efficiency.Logistics FacilitiesAsahi, Mie¥450MPlanned
2026.08.06Keytec Co., Ltd.9896Keytec to install new machinery at Kisarazu plywood plantKeytec plans a JPY 573.3 million machinery investment at its Kisarazu, Chiba facility for its plywood manufacturing and wood-processing business. Construction or installation began in August 2023 and is scheduled for completion in October 2026; the filing does not disclose the post-completion capacity increase.Paper & PulpKisarazu, Chiba¥573.3MBuilding
2026.08.06Koit Kyushu Co., Ltd.7276Koit Kyushu to install automotive lighting manufacturing equipment in SagaKoit Kyushu, a subsidiary of Koito Manufacturing, plans to invest ¥6.859 billion in automotive lighting manufacturing equipment at its facility in Saga, Saga Prefecture. Construction began in March 2026 and completion is scheduled for March 2027, funded internally.Automotive & TransportSaga, Saga¥6.9BPlanned
2026.08.06Koito Electric Industries, Ltd.7276Koito Electric Industries to expand and rationalize factory equipment in ShizuokaKoito Electric Industries plans to invest JPY 1.544 billion in expanding and rationalizing equipment at its factory in Sunto District, Shizuoka. The project is scheduled to begin in March 2026 and be completed in March 2027, funded internally.Other ManufacturingShizuoka¥1.5BPlanned
2026.08.06Koito Manufacturing Co., Ltd.7276Koito Manufacturing to install automotive lighting production equipment at Haibara PlantKoito Manufacturing plans to invest in automotive lighting manufacturing equipment at its Haibara Plant in Makinohara, Shizuoka. The project is scheduled to begin in March 2026 and be completed in March 2027, funded with internal resources.Automotive & TransportMakinohara, Shizuoka¥5.5BPlanned
2026.08.06Koito Manufacturing Co., Ltd.7276Koito Manufacturing to install automotive lighting production equipment at Sagara PlantKoito Manufacturing plans to invest in automotive lighting manufacturing equipment at its Sagara Plant in Makinohara, Shizuoka. The project is scheduled to begin in March 2026 and be completed in March 2027, funded internally.Automotive & TransportMakinohara, Shizuoka¥1BPlanned
2026.08.06Koito Manufacturing Co., Ltd.7276Koito Manufacturing to install automotive lighting production equipment at Shizuoka PlantKoito Manufacturing plans to invest JPY 6.187 billion in automotive lighting manufacturing equipment at its Shizuoka Plant in Shimizu Ward, Shizuoka City. Construction is scheduled to run from March 2026 through March 2027, funded with internal resources.Automotive & TransportShizuoka, Shizuoka¥6.2BPlanned
2026.08.06Komatsu Interlink Co., Ltd.3580Komatsu Interlink to renew logistics equipment at its Nomi headquarters plantKomatsu Interlink plans to renew logistics equipment at its headquarters plant in Nomi, Ishikawa. The ¥44 million project is scheduled to start in April 2026 and be completed in December 2026, funded internally; the post-completion capacity is described as renewal of transport equipment.Logistics FacilitiesNomi, Ishikawa¥44MPlanned
2026.08.06Komatsu Matere, Ltd.3580Komatsu Matere to install dyeing and finishing equipment at its Nomi headquarters plantKomatsu Matere plans to invest in dyeing and finishing equipment at its headquarters plant in Nomi, Ishikawa, to improve the production efficiency of high-performance fabrics. Construction is scheduled to run from April to December 2026, funded internally.Other ManufacturingNomi, Ishikawa¥272MPlanned
2026.08.06Komatsu Matere Co., Ltd.3580Komatsu Matere to upgrade dyeing and finishing equipment in NomiKomatsu Matere plans a ¥1.45 billion investment to install dyeing and finishing equipment at its No. 2 and No. 3 Manufacturing Departments in Nomi, Ishikawa. Construction began in December 2021 and is scheduled for completion in March 2027, improving production efficiency for high-performance fabrics.Materials & ChemicalsNomi, Ishikawa¥1.5BBuilding
2026.08.06Kygnus Sekiyu Co., Ltd.8097Kygnus Sekiyu to strengthen oil storage terminals in Hyogo and elsewhereKygnus Sekiyu plans a ¥3.756 billion project to enhance the resilience of its oil storage terminals in Takasago, Hyogo and other locations. Construction began in February 2024 and is scheduled for completion in September 2028, funded internally by parent company San-Ai Obbl.Power & EnergyTakasago, Hyogo¥3.8BBuilding
2026.08.06Kyokuto Kaihatsu Kogyo Co., Ltd.7226Kyokuto Kaihatsu Kogyo to expand technical center with office, laboratory and test track in ToyotaKyokuto Kaihatsu Kogyo is investing JPY 7.502 billion in office and laboratory buildings, a test track and related facilities at its Technical Center in Toyota, Aichi. Construction began in May 2024 and is scheduled for completion in June 2026; the project supports the company's special-purpose vehicle business.R&D FacilitiesToyota, Aichi¥7.5BBuilding
2026.08.06Kyowa Manufacturing Co., Ltd.Kyowa Manufacturing opens new motor-roller factory in SofiaKyowa Manufacturing's European subsidiary, Kyowa Europe, held an opening ceremony for a new factory in Sofia, Bulgaria, on July 16, 2026. Built on a new site as the company's second expansion in Bulgaria, the facility targets twice the previous production efficiency to meet growing demand for motorized rollers and control systems used in conveyor and logistics systems.Machinery & RoboticsSofia, Bulgarianot disclosedCompleted
2026.08.06Lifedrink Company, Inc.2585Lifedrink Company to expand beverage production equipment at Iwate PlantLifedrink Company plans to invest ¥8.283 billion in manufacturing equipment at its Iwate Plant in Kitakami, Iwate. The project is scheduled to begin in July 2025 and be completed during the second half of the fiscal year ending March 2028, increasing capacity by approximately 14 million cases per year.Food & BeverageKitakami, Iwate¥8.3BBuilding
2026.08.06Lifedrink Company, Inc.2585Lifedrink Company to expand manufacturing and logistics facilities at Gunma BeverageLifedrink Company plans to invest in manufacturing and logistics equipment at its Gunma Beverage facility in Isesaki, Gunma. Construction began in May 2025, with completion scheduled during the fiscal year ending March 2028.Food & BeverageIsesaki, Gunma¥7.8BBuilding
2026.08.06Lifedrink Company, Inc.2585Lifedrink Company to expand manufacturing and logistics facilities at N Beverage in AsahiLifedrink Company plans manufacturing and logistics equipment investment at N Beverage Co. in Asahi, Toyama. The project began in May 2024 and is scheduled for completion during the fiscal year ending March 2027, with total planned investment of ¥4.367 billion.Food & BeverageAsahi, Toyama¥4.4BBuilding
2026.08.06Lifedrink Company, Inc.2585Lifedrink Company to expand production equipment at Gotemba PlantLifedrink Company plans a ¥6.0 billion investment in manufacturing equipment at its Gotemba Plant in Gotemba, Shizuoka. Construction began in September 2024, with completion planned during the second half of fiscal 2027; the project is expected to increase capacity by approximately 8 million cases per year.Food & BeverageGotemba, Shizuoka¥6BBuilding
2026.08.06Lifedrink Company, Inc.2585Lifedrink Company to install manufacturing equipment at Mino Factory in UkihaLifedrink Company plans to install manufacturing equipment at its Mino Factory in Ukiha, Fukuoka, for its drinks and tea-leaf business. Construction began in December 2025, with completion planned during the second half of fiscal 2027; the company did not disclose the resulting capacity increase.Food & BeverageUkiha, Fukuoka¥1.6BPlanned
2026.08.06Lifedrink Company, Inc.2585Lifedrink Company to install manufacturing equipment at Tochigi PlantLifedrink Company plans to invest in manufacturing equipment at its Tochigi Plant in Ashikaga, Tochigi. The project has a total planned investment of JPY 320 million, with work starting in March 2026 and completion scheduled during the first half of the fiscal year ending March 2027.Food & BeverageAshikaga, Tochigi¥320MPlanned
2026.08.06Lifedrink Company, Inc.2585Lifedrink Company to install new manufacturing equipment at Fuji plantLifedrink Company plans to install manufacturing equipment at its Fuji plant in Minamitsuru District, Yamanashi. The company expects to invest ¥107 million, funded internally, with work starting in December 2025 and completion planned during the second half of FY ending March 2027.Food & BeverageYamanashi¥107MPlanned
2026.08.06Mazda Motor Corporation7261Mazda plans vehicle and parts manufacturing equipment investments at Hiroshima and Hofu plantsMazda plans investments in vehicle and parts manufacturing equipment at its Head Office and Hofu plants and other facilities in Japan. The filing does not disclose the investment amount, construction schedule, or additional capacity.Automotive & TransportHiroshima, Hiroshimanot disclosedPlanned
2026.08.06MF Material Co., Ltd.4028MF Material to build barium titanate plant at Nobeoka No. 2 FactoryMF Material is constructing a new plant in Nobeoka, Miyazaki, to manufacture functional materials including barium titanate. The project has a total planned investment of JPY 9.553 billion, with construction scheduled from October 2023 through July 2027.Materials & ChemicalsNobeoka, Miyazaki¥9.6BBuilding
2026.08.06Moritech Steel Co., Ltd.5986Moritech Steel plans production equipment investment at Mie Oyamada Plant, completing 2029Moritech Steel plans to install production equipment at its Mie Oyamada Plant in Iga, Mie, for its sheet-metal processing business. The investment is funded internally, with completion scheduled for December 2029; the start date has not been determined.Steel & Non-ferrous MetalsIga, Mie¥101.8MPlanned
2026.08.06Moritech Steel Co., Ltd.5986Moritech Steel plans production equipment investment at Mie Oyamada Plant, completing 2030Moritech Steel plans to invest in production equipment at its Mie Oyamada Plant in Iga, Mie, for its sheet-metal processing business. The investment is scheduled for completion in December 2029 and will be financed with internal funds; no capacity increase is disclosed.Steel & Non-ferrous MetalsIga, Mie¥450MPlanned
2026.08.06MoriTech Steel Co., Ltd.5986MoriTech Steel plans production equipment investment at Utsunomiya plant, completing 2029MoriTech Steel plans to invest JPY 100 million in production equipment at its Utsunomiya plant in Utsunomiya, Tochigi. The equipment will support the company's sheet-metal processing products segment and is scheduled for completion in August 2029.Other ManufacturingUtsunomiya, Tochigi¥100MPlanned
2026.08.06Moritech Steel Co., Ltd.5986Moritech Steel plans production equipment investment at Utsunomiya Plant, completing 2030Moritech Steel plans to invest in new production equipment at its Utsunomiya Plant in Utsunomiya, Tochigi, for its sheet-metal processing products segment. The investment is scheduled for completion in April 2030, while the start date has not yet been determined.Other ManufacturingUtsunomiya, Tochigi¥174MPlanned
2026.08.06Murata Manufacturing Co., Ltd.6981Murata Manufacturing to install materials, device and module production equipment at Yasu facilityMurata Manufacturing plans to invest ¥15.0 billion in production equipment for materials, devices and modules at its Yasu facility in Yasu, Shiga. Construction is scheduled to begin in March 2026 and finish in March 2027, funded with internal cash.Semiconductors & ElectronicsYasu, Shiga¥15BPlanned
2026.08.06Nankai Chemical Co., Ltd.4040Nankai Chemical to upgrade wastewater treatment facilities at Aogishi PlantNankai Chemical plans to modernize the wastewater treatment facilities at its Aogishi Plant in Wakayama City. The project has a planned total investment of ¥571 million, with construction scheduled from April to November 2026.Materials & ChemicalsWakayama, Wakayama¥571MPlanned
2026.08.06Neturen Co., Ltd.5976Neturen to double Double Stark rebar capacity with new cutting and marking equipment at Iwaki plantNeturen will install new cutting and marking equipment for its Double Stark high-strength rebar products at the Iwaki Plant in Iwaki, Fukushima. The equipment is expected to approximately double production capacity and begin operating in July 2027 to meet rising demand from logistics warehouses and data centers.Steel & Non-ferrous MetalsIwaki, Fukushima¥150MPlanned
2026.08.06Nichias Corporation5393Nichias to construct factory building at Tsurumi Plant in YokohamaNichias plans to invest ¥2.4 billion to construct a factory building at its Tsurumi Plant in Yokohama, Kanagawa. Construction began in June 2024 and is scheduled for completion in September 2026, funded through internal resources and borrowings.Other ManufacturingYokohama, Kanagawa¥2.4BBuilding
2026.08.06Nippon Pipe Fitting Corporation6209Nippon Pipe Fitting to invest in pipe-fitting production equipment at Kishiwada siteNippon Pipe Fitting plans new production equipment and related facilities for pipe fittings at its Kishiwada site in Osaka. The disclosure does not state the investment amount, construction schedule, or capacity increase.Machinery & RoboticsKishiwada, Osakanot disclosedPlanned
2026.08.06Nippon Shinyaku Co., Ltd.4516Nippon Shinyaku to upgrade experimental facilities at its Tsukuba drug discovery research centerNippon Shinyaku plans a ¥2.059 billion investment to improve the experimental environment at its East Japan Drug Discovery Research Center in Tsukuba, Ibaraki. Construction began in Q1 FY2025 and is scheduled for completion in Q2 FY2026.R&D FacilitiesTsukuba, Ibaraki¥2.1BBuilding
2026.08.06Nippon Steel Corporation5401Nippon Steel completes new hot-rolling line at Nagoya WorksNippon Steel has completed a new hot-rolling line at its Nagoya Works in Tokai, Aichi, strengthening production of advanced thin steel sheets including ultra-high-tensile steel for automobiles and electric vehicles. The line features the world's largest load-bearing rolling mill and has annual capacity of approximately 6 million tonnes; the existing hot-rolling line is scheduled to be idled during FY2026.Steel & Non-ferrous MetalsTokai, Aichi¥300BCompleted
2026.08.06Nippon Television Network Corporation9404Nippon Television Network to renew broadcasting and headquarters equipment in TokyoNippon Television Network plans to invest in broadcasting equipment and headquarters equipment renewal at facilities in Minato, Tokyo, and elsewhere. The project is scheduled to begin in April 2026 and finish in March 2027, funded with internal resources.TelecomMinato, Tokyo¥20BPlanned
2026.08.06Nishikawa Rubber Co., Ltd.5161Nishikawa Rubber to install production equipment at Mihara PlantNishikawa Rubber plans to invest ¥640 million in production equipment at its Mihara Plant in Mihara, Hiroshima. The equipment will produce automotive sealing products and general industrial materials, with construction scheduled from April 2026 through March 2027.Automotive & TransportMihara, Hiroshima¥640MPlanned
2026.08.06Nishikawa Rubber Co., Ltd.5161Nishikawa Rubber to install production equipment at Yoshida PlantNishikawa Rubber plans to invest JPY 531 million in production equipment at its Yoshida Plant in Akitakata, Hiroshima. The equipment will produce automotive sealing products and general industrial materials, with work scheduled from April 2026 through March 2027 and funded internally.Automotive & TransportAkitakata, Hiroshima¥531MPlanned
2026.08.06Nishikawa Rubber Yamaguchi Co., Ltd.5161Nishikawa Rubber Yamaguchi to install automotive sealing-product production equipment in ShimonosekiNishikawa Rubber Yamaguchi plans to invest JPY 449 million in production equipment for automotive sealing products at its site in Shimonoseki, Yamaguchi. Construction is scheduled to start in April 2026 and finish in March 2027, funded internally; no capacity increase is disclosed.Automotive & TransportShimonoseki, Yamaguchi¥449MPlanned
2026.08.06Nitori Holdings9843Nitori to build new Kawasaki logistics centerNitori Holdings plans to establish the Kawasaki Logistics Center in Kawasaki, Kanagawa, with a site area of 207,912 sqm. The planned total investment is ¥148.025 billion, with construction scheduled to begin in November 2028 and completion expected in April 2032.Logistics FacilitiesKawasaki, Kanagawa¥148BPlanned
2026.08.06NittoBest Corporation2877NittoBest to install food manufacturing machinery at Otani PlantNittoBest plans to invest in food manufacturing machinery at its Otani Plant in Asahi, Yamagata. The project is scheduled to begin in June 2026 and be completed in November 2026, funded through internal resources and borrowings.Food & BeverageAsahi, Yamagata¥259.7MPlanned
2026.08.06NittoBest Corporation2877NittoBest to install food manufacturing machinery at Yamagata Distribution CenterNittoBest plans to invest ¥365.304 million in food manufacturing machinery at its Yamagata Distribution Center in Yamagata City, Yamagata. Construction or installation is scheduled to start in October 2026 and finish in April 2027, funded through internal funds and borrowings.Food & BeverageYamagata, Yamagata¥365.3MPlanned
2026.08.06NPR-RIKEN Heat Techno Corporation6209NPR-RIKEN Heat Techno plans production equipment investment in KumagayaNPR-RIKEN Heat Techno plans to invest in production equipment for industrial furnaces and electric heating materials at its Kumagaya facility in Saitama. The disclosure does not state the investment amount, construction schedule, or post-investment capacity increase.Materials & ChemicalsKumagaya, Saitamanot disclosedPlanned
2026.08.06NPR-RIKEN Niigata Corporation6209NPR-RIKEN Niigata plans piston-ring production equipment investment in KashiwazakiNPR-RIKEN Niigata plans to install production equipment and related facilities for piston rings at its site in Kashiwazaki, Niigata. The investment is for automotive and industrial machinery components, but the disclosure does not provide the investment amount, schedule, or capacity increase.Automotive & TransportKashiwazaki, Niigatanot disclosedPlanned
2026.08.06NPR-RIKEN Precision Corporation6209NPR-RIKEN Precision plans valve-seat production equipment at Kawamata facilityNPR-RIKEN Precision plans to install production equipment and related facilities for valve seats at its site in Kawamata, Fukushima. The disclosure does not state the investment amount, construction schedule, or post-investment capacity increase.Automotive & TransportKawamata, Fukushimanot disclosedPlanned
2026.08.06Osaka Titanium Technologies Co., Ltd.5726Osaka Titanium Technologies to expand sponge titanium production equipment at Amagasaki plantOsaka Titanium Technologies plans to invest approximately ¥39 billion in sponge titanium manufacturing equipment at its Amagasaki plant in Hyogo. Construction began in September 2024 and is scheduled for completion by the end of fiscal 2027, increasing production capacity by 25%.Steel & Non-ferrous MetalsAmagasaki, Hyogo¥39BBuilding
2026.08.06Sagami Holdings Corporation9900Sagami Holdings to upgrade production facilities in Aichi and elsewhereSagami Holdings plans investment in production facilities at sites in Aichi and elsewhere, funded through internal resources. The project is scheduled to run from December 2025 through March 2027.Food & BeverageAichi¥762.1MBuilding
2026.08.06San-Ai Obbli Co., Ltd.8097San-Ai Obbli to expand aircraft fueling facilities in Ota, TokyoSan-Ai Obbli plans a ¥40.0 billion aircraft fueling facility in Ota, Tokyo, funded through internal funds and borrowings. Construction began in March 2024 and is scheduled for completion in September 2028; the project will strengthen aviation-fuel storage and supply capacity.Power & EnergyOta, Tokyo¥40BBuilding
2026.08.06San-Ai Obblitech Co., Ltd.8097San-Ai Obblitech to build CT factory in Kisarazu, ChibaSan-Ai Obblitech plans to construct a CT factory in Kisarazu, Chiba, to improve quality and expand orders in its CT business. The project has a total planned investment of ¥1.986 billion, with construction scheduled from April 2026 through July 2028.Other ManufacturingKisarazu, Chiba¥2BPlanned
2026.08.06San-Ai Riken Co., Ltd.8097San-Ai Riken to build chemical-products manufacturing plant in ItakoSan-Ai Riken plans to invest JPY 2.801 billion in a chemical-products manufacturing plant in Itako, Ibaraki. Construction is scheduled to run from October 2024 through September 2027, with the project intended to ensure stable supply and expand contract manufacturing.Materials & ChemicalsItako, Ibaraki¥2.8BBuilding
2026.08.06Shinki Bus Co., Ltd.9083Shinki Bus to add 63 route buses across Hyogo PrefectureShinki Bus plans to invest ¥2.006 billion in 63 route buses for its operating offices and other locations across Hyogo Prefecture. The investment is scheduled to begin in April 2026 and be completed in February 2027, expanding and renewing its bus fleet for passenger transport services.Automotive & TransportHyogo¥2BPlanned
2026.08.06Shinkin Central Bank8421Shinkin Central Bank to develop office operations center in AtsugiShinkin Central Bank plans to develop an operations center in Atsugi, Kanagawa, with total planned investment of ¥3.058 billion. Construction began in May 2025 and is scheduled for completion in November 2028.OtherAtsugi, Kanagawa¥3.1BBuilding
2026.08.06Shinkin Information System Center Co., Ltd.8421Shinkin Information System Center to build system integration infrastructure in AtsugiShinkin Information System Center plans to establish system integration infrastructure at its facility in Atsugi, Kanagawa. The project has a total planned investment of ¥1.386 billion, with construction begun in August 2025 and completion scheduled for October 2026.Data CentersAtsugi, Kanagawa¥1.4BBuilding
2026.08.06Shinkin Information System Center Co., Ltd.8421Shinkin Information System Center to develop IB system in TokyoShinkin Information System Center plans to invest JPY 29.0 billion in an IB system at its Tokyo facility. The project is scheduled to begin in February 2025 and be completed in January 2030, funded through internal funds and finance leases.TelecomChuo, Tokyo¥29BBuilding
2026.08.06Shinkin Information System Center Co., Ltd.8421Shinkin Information System Center to modernize core banking host system in AtsugiShinkin Information System Center plans a major modernization of its core banking host system at its facility in Atsugi, Kanagawa. The open-systems conversion is scheduled to begin in April 2025 and be completed in February 2030, funded through internal funds and finance leases.TelecomAtsugi, Kanagawa¥48.2BBuilding
2026.08.06Shinkin Information System Center Co., Ltd.8421Shinkin Information System Center to upgrade core banking network system in AtsugiShinkin Information System Center plans to invest ¥1.62 billion in a core banking network system at its Atsugi, Kanagawa facility. Construction began in August 2024, with completion scheduled for September 2027; funding will come from internal funds and finance leases.TelecomAtsugi, Kanagawa¥1.6BBuilding
2026.08.06Soto Co., Ltd.3571Soto to install dyeing and finishing equipment at Ichinomiya plantSoto plans to invest in dyeing and finishing equipment at its Ichinomiya plant in Ichinomiya, Aichi. The equipment is intended to improve quality and streamline operations, with no increase in production capacity after completion; work is scheduled from April 2026 through March 2027.Materials & ChemicalsIchinomiya, Aichi¥526MPlanned
2026.08.06Toho Titanium Co., Ltd.5016Toho Titanium to expand nickel powder production equipment at Wakamatsu PlantToho Titanium plans a ¥10.649 billion investment in nickel powder manufacturing equipment at its Wakamatsu Plant in Kitakyushu, Fukuoka. Construction began in September 2023 and completion is scheduled for September 2026; the disclosure does not specify the post-completion capacity increase.Materials & ChemicalsKitakyushu, Fukuoka¥10.6BBuilding
2026.08.06Transaction Media Networks, Inc.5258Transaction Media Networks to build information-processing infrastructure at Kanagawa data centerTransaction Media Networks plans to build an information-processing infrastructure system at its data center in Kanagawa, Japan. The company expects to invest JPY 1.368 billion in total, with construction scheduled from April 2023 through March 2027 and funding from internal resources.Data CentersKanagawa¥1.4BBuilding
2026.08.06Transaction Media Networks, Inc.5258Transaction Media Networks to expand payment-system data center in KanagawaTransaction Media Networks plans to expand its payment-system data center in Kanagawa, Japan. The project has a total planned investment of ¥967 million, began in April 2023 and is scheduled for completion in March 2027, funded with internal resources.Data CentersKanagawa¥967MBuilding
2026.08.06Transaction Media Networks, Inc.5258Transaction Media Networks to harden payment systems at its Kanagawa data centerTransaction Media Networks plans a ¥3.57 billion investment in payment-system hardening and related improvements at its data center in Kanagawa. Construction began in April 2023 and is scheduled for completion in March 2027, funded with internal resources.Data CentersKanagawa¥3.6BBuilding
2026.08.06Yamaichi Electronics Co., Ltd.6941Yamaichi Electronics to install production equipment at Sakura siteYamaichi Electronics plans to invest ¥2.842 billion in production equipment for its test-solution and connector-solution businesses at its Sakura site in Sakura, Chiba. Construction is scheduled from April 2026 through March 2027, funded through internal funds and borrowings.Semiconductors & ElectronicsSakura, Chiba¥2.8BPlanned
2026.08.05Ace Bakery Co., Ltd.2207Ace Bakery to install jelly manufacturing equipment in KasugaiAce Bakery plans to install new jelly manufacturing equipment at its facility in Kasugai, Aichi. The project has a total planned investment of ¥7.7 billion, with work scheduled from October 2025 through December 2026, funded through internal funds and borrowings.Food & BeverageKasugai, Aichi¥7.7BBuilding
2026.08.05Atomix Corporation4625Atomix to install production equipment at Kazo FactoryAtomix plans a ¥115 million investment in production equipment at its Kazo Factory in Kazo, Saitama. Construction is scheduled from October to December 2026, funded internally; no post-investment capacity increase is disclosed.Materials & ChemicalsKazo, Saitama¥115MPlanned
2026.08.05CULTA Co., Ltd.CULTA to open new agricultural R&D hubs in Kashiwa and TsukubaCULTA will establish new research and development facilities in Kashiwa, Chiba, and Tsukuba, Ibaraki, focused on climate-adapted crop breeding, cultivation technology and stable seedling supply. The facilities will include sunlight-powered and artificial-light plant factories, laboratories, cultivation research greenhouses and a nursery building, with operations scheduled to begin sequentially from September 2026.R&D FacilitiesKashiwa; Tsukuba, Chiba; Ibarakinot disclosedPlanned
2026.08.05Daido Metal Co., Ltd.7245Daido Metal to build new bearing factory at its Mexico production siteDaido Metal will invest approximately ¥4 billion through fiscal 2027 to build a new factory and install production equipment at its existing Mexico site. The expansion will support increased production of engine bearings for data-center generator engines, with construction targeted for autumn 2026 and production scheduled to begin in 2028.Other ManufacturingJalisco, Mexico¥4BPlanned
2026.08.05Doctor Net Co., Ltd.4483Doctor Net to expand teleradiology equipment in TokyoDoctor Net plans to expand its teleradiology equipment at its Minato, Tokyo facility. The project is scheduled to begin in April 2026 and finish in March 2027, funded through internal resources.Pharma & MedicalMinato, Tokyo¥709MPlanned
2026.08.05Dr. Net Co., Ltd.4483Dr. Net to invest ¥883 million in remote medical system development in TokyoDr. Net plans to invest ¥883 million in remote medical system development at its Minato, Tokyo operations. The project is scheduled to begin in April 2026 and be completed by March 2027, funded internally; no post-completion capacity increase is disclosed.R&D FacilitiesMinato, Tokyo¥883MPlanned
2026.08.05F-TECH INC.7212F-TECH to expand automotive-parts equipment at its Kameyama siteF-TECH plans to invest in equipment related to automotive-parts production at its Kameyama site in Mie Prefecture. The ¥2.758 billion project will support capacity expansion for the launch of new vehicle models, with work planned from April 2026 through March 2027.Automotive & TransportKameyama, Mie¥2.8BPlanned
2026.08.05F-TECH INC.7212F-TECH to expand automotive-parts equipment at Kuki facilityF-TECH plans to invest JPY 1.803 billion in automotive-parts-related equipment at its Kuki facility in Kuki, Saitama. The project will strengthen equipment for launching new vehicle models, with construction scheduled from April 2026 through March 2027.Automotive & TransportKuki, Saitama¥1.8BPlanned
2026.08.05Flower Communications Co., Ltd.Flower Communications launches Ishikari Renewable Energy Data Center No. 1Flower Communications announced that Ishikari Renewable Energy Data Center No. 1 began service on August 1, 2026, following construction completed on March 27, 2026 and fit-out work. The green data center in Ishikari operates on 100% renewable energy and supports water and liquid cooling in part of its six data-center sections, with an IOWN All-Photonics Network connection to Tokyo.Data CentersIshikari, Hokkaidonot disclosedCompleted
2026.08.05Fuji Light Metal Co., Ltd.5940Fuji Light Metal to install production equipment at Nagasu facilityFuji Light Metal plans to invest JPY 1.478 billion in new production equipment at its facility in Nagasu, Kumamoto. Construction is scheduled from March 2026 through March 2027 for the company's extruded-shape external sales segment; no post-completion capacity increase is disclosed.Other ManufacturingNagasu, Kumamoto¥1.5BPlanned
2026.08.05Fuji Sash Co., Ltd.5940Fuji Sash to renew production equipment at its headquarters and Chiba plantFuji Sash plans a ¥5.445 billion investment in production equipment and its headquarters facilities in Kawasaki, Kanagawa, and Ichihara, Chiba. Construction began in December 2023 and is scheduled for completion in March 2027, funded through internal resources and borrowings.Other ManufacturingIchihara, Chiba¥5.4BBuilding
2026.08.05Furukawa Co., Ltd.5715Furukawa Co. to invest in production equipment at Yamashi Metal factory in NodaFurukawa Co., Ltd. plans to invest JPY 1.188 billion in an office building and production equipment at Yamashi Metal Co., Ltd.'s headquarters and factory in Noda, Chiba. Construction began in November 2024, with funding from internal funds and borrowings; no completion date or capacity increase is disclosed.Other ManufacturingNoda, Chiba¥1.2BBuilding
2026.08.05Furukawa Industrial Machinery Systems Co., Ltd.5715Furukawa Industrial Machinery Systems to install wastewater-treatment equipment at Oyama FactoryFurukawa Industrial Machinery Systems plans to install wastewater-treatment equipment at its Oyama Factory in Oyama, Tochigi. The project has a total planned investment of ¥2.13 billion and started in April 2024; no completion date or capacity increase is disclosed.Machinery & RoboticsOyama, Tochigi¥2.1BBuilding
2026.08.05Godo Steel, Ltd.5410Godo Steel to renew rolling mill at its Himeji WorksGodo Steel plans to renew the rolling mill at its Himeji Works in Himeji, Hyogo. The project has a total planned investment of ¥12.8 billion, began in November 2024, and is scheduled for completion in the second half of fiscal 2028.Steel & Non-ferrous MetalsHimeji, Hyogo¥12.8BBuilding
2026.08.05Gunze Limited3002Gunze to invest in production plant buildings and equipment at Konan factoryGunze plans a ¥2.257 billion investment in production-factory buildings and equipment at its Konan Factory in Konan, Aichi. Construction began in April 2025 and is scheduled for completion in April 2027; the filing does not disclose the resulting capacity increase.Other ManufacturingKonan, Aichi¥2.3BBuilding
2026.08.05Gunze Limited3002Gunze to restructure domestic apparel operations at Miyazu FactoryGunze plans a ¥756 million investment to restructure and reorganize its domestic apparel production sites, centered on the Miyazu Factory in Miyazu, Kyoto. Work began in August 2025 and is scheduled for completion in December 2026, funded through internal funds and borrowings.Other ManufacturingMiyazu, Kyoto¥756MBuilding
2026.08.05Hirose Electric Co., Ltd.6806Hirose Electric to expand Tohoku Advanced Technology Center in MoriokaHirose Electric plans to expand its Tohoku Advanced Technology Center in Morioka, Iwate, to support its multipole and coaxial connector business. The expansion is scheduled to begin in February 2026 and be completed in March 2027, with total planned investment of ¥1.431 billion.Semiconductors & ElectronicsMorioka, Iwate¥1.4BPlanned
2026.08.05Hirose Electric Co., Ltd.6806Hirose Electric to install assembly and component-manufacturing equipment at Ichinoseki plantHirose Electric plans to invest ¥1.45 billion in assembly and component-manufacturing equipment, molds, and testing equipment at its Ichinoseki plant in Ichinoseki, Iwate. The project is scheduled to begin in April 2026 and be completed by March 2027, supporting production of multipole, coaxial, and other connectors.Semiconductors & ElectronicsIchinoseki, Iwate¥1.5BPlanned
2026.08.05Hirose Electric Co., Ltd.6806Hirose Electric to install assembly and component-manufacturing equipment at Miyako plantHirose Electric plans a ¥3.16 billion investment in assembly and component-manufacturing equipment and molds at the Miyako plant of Tohoku Hirose Electric in Miyako, Iwate. Construction is scheduled from April 2026 through March 2027, supporting production of multipole and coaxial connectors.Semiconductors & ElectronicsMiyako, Iwate¥3.2BPlanned
2026.08.05Hirose Electric Co., Ltd.6806Hirose Electric to install mold, tooling and testing equipment at Yokohama headquartersHirose Electric plans to invest in mold, tooling and testing equipment at its headquarters in Tsuzuki Ward, Yokohama. The project is scheduled to begin in April 2026 and be completed by March 2027, with total planned investment of JPY 5.69 billion.Semiconductors & ElectronicsYokohama, Kanagawa¥5.7BPlanned
2026.08.05Hirose Electric Co., Ltd.6806Hirose Electric to invest in assembly and component-manufacturing equipment at Koriyama plantHirose Electric plans to invest JPY 2.2 billion in assembly and component-manufacturing equipment and molds at its Koriyama plant in Koriyama, Fukushima. Construction or installation is scheduled to begin in April 2026 and be completed by March 2027, supporting its multipole connector business.Semiconductors & ElectronicsKoriyama, Fukushima¥2.2BPlanned
2026.08.05INTELLECT CO., LTD.INTELLECT to develop 2 MW grid-scale battery storage facility in KumamotoINTELLECT will develop a grid-scale battery storage facility in Kumamoto City's Kita Ward, using land owned by the BLD WEDDINGS group. The facility is planned to have approximately 2 MW of rated output and 8 MWh of storage capacity, with operations scheduled to begin in June 2027; INTELLECT will provide development, EPC and O&M services.Power & EnergyKumamoto, Kumamotonot disclosedPlanned
2026.08.05Ishikawa Sanken Co., Ltd.6707Ishikawa Sanken to install machinery at Shiga facilityIshikawa Sanken, a subsidiary of Sanken Electric, plans to invest in machinery at its facility in Shiga Town, Ishikawa, Japan. The investment is scheduled to begin in April 2026 and be completed by March 2027, funded through borrowing.Semiconductors & ElectronicsShika, Ishikawa¥703MPlanned
2026.08.05Iwaki Co., Ltd.6237Iwaki to expand production and logistics capacity at Miharu PlantIwaki plans to invest JPY 2.503 billion in building facilities at its Miharu Plant in Miharu, Fukushima. Construction started in April 2025 and is scheduled for completion in May 2026; the project will increase production capacity and improve production and logistics efficiency.Machinery & RoboticsMiharu, Fukushima¥2.5BBuilding
2026.08.05JMDC Inc.4483JMDC to expand database infrastructure at its Tokyo headquartersJMDC plans to expand database facilities at its headquarters in Minato, Tokyo, supporting its health big-data business. The company expects to invest JPY 198 million using internal funds, with work scheduled from April 2026 through March 2027.Data CentersMinato, Tokyo¥198MPlanned
2026.08.05Kato Works Co., Ltd.6390Kato Works to invest ¥3.16 billion in production equipment at Ibaraki plantKato Works plans to install manufacturing and related equipment at its Ibaraki plant in Goka, Ibaraki, to improve production productivity. The company expects construction to begin in May 2026 and finish in March 2029, funded through internal funds and borrowings.Machinery & RoboticsGoka, Ibaraki¥3.2BPlanned
2026.08.05Kinki Sharyo Co., Ltd.7122Kinki Sharyo to add laser welding equipment at Tokuan railcar plantKinki Sharyo plans to install additional laser welding equipment at its Tokuan Factory in Higashi-Osaka, Osaka, for its railway vehicle business. The project has a total planned investment of ¥550 million and is scheduled for completion in March 2027.Automotive & TransportHigashi-Osaka, Osaka¥550MPlanned
2026.08.05Lintec Corporation7966Lintec to build Semiconductor Solution Lab in Itoshima, FukuokaLintec will invest approximately ¥20 billion to build the Semiconductor Solution Lab in Itoshima, Fukuoka, a co-development site for process materials, direct materials and related equipment used in semiconductor mid-stage processes. Completion is planned for October 2028; a location agreement with Fukuoka Prefecture and the city is to be signed on 21 August 2026.R&D FacilitiesItoshima, Fukuoka¥20BPlanned
2026.08.05Maruo Calcium Co., Ltd.4102Maruo Calcium to expand capacity at Tsuchiura plant with new calcination furnaceMaruo Calcium plans to install a calcination furnace and related equipment at its Tsuchiura Plant in Ami, Ibaraki. The project is expected to increase post-completion capacity by 25%, with construction planned from June 2025 through April 2028.Materials & ChemicalsAmi, Ibaraki¥1.3BBuilding
2026.08.05Medikit Co., Ltd.7749Medikit to expand medical-device production capacity at Hyuga Second FactoryMedikit plans to install medical-device production equipment at Togo Medikit's Hyuga Second Factory in Hyuga, Miyazaki. The project is budgeted at ¥808 million, began in January 2025, and is scheduled for completion in March 2027 to increase product production capacity.Pharma & MedicalHyuga, Miyazaki¥808MBuilding
2026.08.05Medikit Co., Ltd.7749Medikit to expand medical-device production capacity at Hyuga Second PlantMedikit plans to invest in medical-device production equipment at Togo Medikit's Hyuga Second Plant in Hyuga, Miyazaki. The project is scheduled to begin in December 2024 and be completed in January 2027, increasing component production capacity.Pharma & MedicalHyuga, Miyazaki¥1.2BBuilding
2026.08.05Medikit Co., Ltd.7749Medikit to expand medical-device production equipment at Hyuga factoryMedikit plans to invest in expanded medical-device production equipment at its Togo Medikit Hyuga Factory in Hyuga, Miyazaki. The project is intended to increase component production capacity, with construction scheduled from April 2025 through September 2026.Pharma & MedicalHyuga, Miyazaki¥107MBuilding
2026.08.05Medikit Co., Ltd.7749Medikit to expand medical-device production equipment at Hyuga plantMedikit plans to invest in medical-device production equipment at its Togo Medikit Hyuga plant in Hyuga, Miyazaki. The project is intended to increase product production capacity, with construction scheduled from April 2025 through March 2027 and funded internally.Pharma & MedicalHyuga, Miyazaki¥183.5MBuilding
2026.08.05Medikit Co., Ltd.7749Medikit to expand medical-device production facilities at Hyuga factoryMedikit plans to invest ¥76.5 million in medical-device production facilities at its Hyuga factory in Hyuga, Miyazaki. The project includes an elevator-building expansion, with construction scheduled from October 2025 through December 2026 and funded internally.Pharma & MedicalHyuga, Miyazaki¥76.5MBuilding
2026.08.05Meiji Holdings Co., Ltd.2269Meiji to build dairy-products production factory in AtsugiMeiji plans a dairy-products production factory in Atsugi, Kanagawa, with total planned investment of JPY 40.075 billion. Construction began in May 2025 and is scheduled for completion in June 2027; the disclosure does not state the resulting capacity increase.Food & BeverageAtsugi, Kanagawa¥40.1BBuilding
2026.08.05Meiji Holdings Co., Ltd.2269Meiji to build dairy-products production plant in Shibetsu, HokkaidoMeiji Holdings plans a 46.87 billion yen investment in a dairy-products production plant in Shibetsu District, Hokkaido. Construction began in April 2024 and is scheduled for completion in March 2028; the disclosure does not state the additional production capacity.Food & BeverageHokkaido¥46.9BBuilding
2026.08.05Meito Co., Ltd.2207Meito to install dextran sulfate sodium manufacturing equipment in KiyosuMeito plans to install manufacturing equipment for dextran sulfate sodium at its facility in Kiyosu, Aichi. The project has a total planned investment of JPY 3.393 billion, with construction starting in October 2025 and completion scheduled for March 2027.Materials & ChemicalsKiyosu, Aichi¥3.4BBuilding
2026.08.05Miyaji Engineering Group Co., Ltd.3431Miyaji Engineering Group to invest ¥7.005 billion in production equipment at Chiba plantMiyaji Engineering Group plans a total ¥7.005 billion investment in production equipment and related facilities at Miyaji Engineering's Chiba Plant in Ichihara, Chiba. Construction began in February 2020 and is scheduled for completion in May 2027; the disclosure does not specify additional capacity.Other ManufacturingIchihara, Chiba¥7BBuilding
2026.08.05Miyaji Engineering Co., Ltd.3431Miyaji Engineering to establish new Kansai equipment center in KasaiMiyaji Engineering plans to establish a new Kansai equipment center in Kasai, Hyogo, for erection equipment and related facilities. Construction began in November 2023 and is scheduled for completion in March 2027, with total planned investment of ¥587 million.Machinery & RoboticsKasai, Hyogo¥587MBuilding
2026.08.05Morinaga Milk Industry Co., Ltd.2264Morinaga Milk Industry to construct manufacturing building at Hokkaido Eniwa PlantMorinaga Milk Industry plans to build a manufacturing building at its Hokkaido Eniwa Plant in Eniwa, Hokkaido. The project has a total planned investment of ¥14.72 billion, with construction scheduled to run from April 2025 through January 2029.Food & BeverageEniwa, Hokkaido¥14.7BPlanned
2026.08.05Morinaga Milk Industry Co., Ltd.2264Morinaga Milk Industry to expand yogurt production equipment at Tone PlantMorinaga Milk Industry plans a ¥3.95 billion investment in yogurt production equipment at its Tone Plant in Joso, Ibaraki. Construction began in January 2025 and completion is scheduled for August 2027; no post-completion capacity increase is disclosed.Food & BeverageJoso, Ibaraki¥4BBuilding
2026.08.05Morinaga Milk Industry Co., Ltd.2264Morinaga Milk Industry to install yogurt production equipment at Kobe plantMorinaga Milk Industry plans to invest JPY 5.55 billion in yogurt production equipment at its Kobe plant in Nada Ward, Kobe, Hyogo. Construction is scheduled to begin in April 2026 and finish in April 2028; the disclosure does not state the resulting capacity increase.Food & BeverageKobe, Hyogo¥5.6BPlanned
2026.08.05Morinaga Milk Industry Co., Ltd.2264Morinaga Milk to expand frozen-dessert production equipment at Kobe plantMorinaga Milk Industry plans to invest JPY 18.782 billion in frozen-dessert manufacturing equipment at its Kobe plant in Nada Ward, Kobe, Hyogo. Construction began in October 2023 and is scheduled for completion in January 2027, funded through internal funds and borrowings.Food & BeverageKobe, Hyogo¥18.8BBuilding
2026.08.05Morinaga Milk Industry Co., Ltd.2264Morinaga Milk to upgrade logistics and powdered milk production equipment at Saroma PlantMorinaga Milk Industry plans a ¥3.2 billion investment at its Saroma Plant in Hokkaido to address logistics constraints and install powdered milk manufacturing equipment. Construction is scheduled to begin in September 2025 and finish in May 2029; no post-completion capacity increase is disclosed.Food & BeverageSaroma, Hokkaido¥3.2BPlanned
2026.08.05NF Circuit Design Block Co., Ltd.6864NF Circuit Design Block to expand R&D and production equipment at Yokohama headquartersNF Circuit Design Block plans to invest JPY 160 million in research and production machinery at its headquarters in Yokohama, Kanagawa. The equipment investment is intended to increase research and development and production capacity, with work scheduled from April 2026 through March 2027.Semiconductors & ElectronicsYokohama, Kanagawa¥160MPlanned
2026.08.05Nihon Kohden Corporation6849Nihon Kohden plans production equipment and mold investment at Tomioka facilityNihon Kohden plans to invest ¥530 million in production equipment and molds at a leased facility in Tomioka, Gunma. The disclosure does not specify the construction schedule or additional production capacity.Pharma & MedicalTomioka, Gunma¥530MPlanned
2026.08.05Nihon Kohden Corporation6849Nihon Kohden plans R&D and other facility investments in TokorozawaNihon Kohden plans to invest in research and development equipment and other facilities at its Comprehensive Technology Development Center and other sites in Tokorozawa, Saitama. The filing discloses a total planned investment of JPY 2.412 billion, but does not specify the construction schedule or incremental capacity.R&D FacilitiesTokorozawa, Saitama¥2.4BPlanned
2026.08.05Nihon Kohden Corporation6849Nihon Kohden to invest in additional equipment at Tokyo headquartersNihon Kohden plans to invest ¥354 million in additional equipment at its headquarters in Shinjuku, Tokyo. The project is scheduled to start in April 2026 and finish in March 2027, funded internally; the disclosure does not specify the equipment or capacity increase.Pharma & MedicalShinjuku, Tokyo¥354MPlanned
2026.08.05Nippon Chuzo5609Nippon Chuzo to renew casting equipment at its Kawasaki plantNippon Chuzo plans to invest in business-efficiency improvements and casting-related manufacturing equipment at its head office Kawasaki plant in Kawasaki, Kanagawa. The renewal is intended to replace aging equipment and will not increase production capacity; construction is scheduled from April 2026 through March 2027.Steel & Non-ferrous MetalsKawasaki, Kanagawa¥551MPlanned
2026.08.05Nippon Concrete Industries Co., Ltd.5269Nippon Concrete Industries to install precast manufacturing equipment at Noboribetsu plantNippon Concrete Industries plans to invest JPY 1.498 billion in new precast concrete product manufacturing equipment at its Noboribetsu plant in Hokkaido. The project is scheduled to begin in December 2025 and be completed in November 2026, funded with internal resources.Other ManufacturingNoboribetsu, Hokkaido¥1.5BBuilding
2026.08.05Nomi Bosai Ltd.6744Nomi Bosai to expand fire-alarm equipment manufacturing facilities at Menuma FactoryNomi Bosai plans a ¥7.715 billion investment in manufacturing equipment and related facilities for fire alarm devices at its Menuma Factory in Kumagaya, Saitama. Construction is scheduled to run from June 2026 through October 2027 and will be funded internally.Other ManufacturingKumagaya, Saitama¥7.7BPlanned
2026.08.05Ohkawa Corporation3036Ohkawa Corporation to build new precision metal-processing plant in FukushimaOhkawa Corporation, an Alconix Group company, will build its third facility in Fukushima City to produce precision metal-processing components for aerospace and semiconductor manufacturing equipment. The new plant is expected to more than double current production capacity and begin operations in the second half of FY2028.Other ManufacturingFukushima, Fukushima¥7.5BPlanned
2026.08.05Okamoto Co., Ltd.5122Okamoto to install industrial materials and medical daily-use product equipment at Ibaraki plantOkamoto plans to invest ¥1.07 billion in production equipment for industrial materials, medical products and daily-use goods at its Ibaraki Plant in Ryugasaki, Ibaraki. Construction is scheduled to begin in April 2026 and finish in March 2027, funded internally.Other ManufacturingRyugasaki, Ibaraki¥1.1BPlanned
2026.08.05Okamoto Industries, Inc.5122Okamoto to install production equipment at Fukushima PlantOkamoto plans to invest JPY 638 million in production equipment at its Fukushima Plant in Iwaki, Fukushima. The equipment will support production of plastic film, medical and daily-use products, and apparel and sporting goods, with work scheduled from April 2026 through March 2027.Other ManufacturingIwaki, Fukushima¥638MPlanned
2026.08.05Okamoto Industries, Inc.5122Okamoto to install production equipment at Shizuoka plantOkamoto plans to invest ¥1.6 billion in production equipment for plastic films, wallpaper and industrial materials at its Shizuoka plant in Yoshida, Shizuoka. Construction is scheduled from April 2026 through March 2027, funded internally.Materials & ChemicalsYoshida, Shizuoka¥1.6BPlanned
2026.08.05Okaya Electric Industries Co., Ltd.6926Okaya Electric Industries to install research equipment at Nagano facilityOkaya Electric Industries plans to install research equipment at its Nagano facility in Okaya, Nagano. The company expects to invest ¥113 million using internal funds and borrowings, with work scheduled from April 2026 through March 2027.R&D FacilitiesOkaya, Nagano¥113MPlanned
2026.08.05Okaya Electric Industries Co., Ltd.6926Okaya Electric Industries to invest in production and research equipment at Saitama facilityOkaya Electric Industries plans to invest ¥46 million in production and research equipment at its Saitama facility in Gyoda, Saitama. Construction or installation is scheduled to begin in April 2026 and finish by March 2027, funded by internal funds and borrowings.Semiconductors & ElectronicsGyoda, Saitama¥46MPlanned
2026.08.05OKM Co., Ltd.6229OKM to establish second-phase research and development center in YasuOKM plans the second-phase construction of its headquarters and research and development center in Yasu, Shiga. The planned investment amount, construction schedule, and post-completion capacity increase have not been disclosed; JPY 28.4 million has already been paid.R&D FacilitiesYasu, Shiganot disclosedPlanned
2026.08.05Power X, Inc.485APower X to begin mass production of Mega Power 4000 grid-scale battery systemsPower X announced the Mega Power 4000 series, a liquid-cooled LFP battery storage system for grid-scale storage projects, with nominal capacities of up to 4,680 kWh per 20-foot container. Mass production is scheduled to begin in May 2027 in Tamano, Okayama, followed by production in Tomakomai, Hokkaido, from January 2028; the system is intended for Japan and overseas markets including Australia and Southeast Asia.Power & EnergyTamano, Okayamanot disclosedPlanned
2026.08.05Qualips, Inc.4894Qualips to build CLiC-1 cell-culture processing facility in MinohQualips plans to establish CLiC-1, a cell-culture processing facility in Minoh, Osaka. The project has a planned total investment of ¥600 million, funded by subsidies and the company's own funds, with construction scheduled from March to July 2027.Pharma & MedicalMinoh, Osaka¥600MPlanned
2026.08.05Quolibis Co., Ltd.4894Quolibis to build pilot-scale plant at Nakanoshima Cross in OsakaQuolibis plans to establish a pilot-scale plant at Nakanoshima Cross in Osaka, Japan. The project has a planned total investment of ¥560 million, funded by subsidies and internal funds, with construction scheduled from January to December 2026.Pharma & MedicalOsaka, Osaka¥560MPlanned
2026.08.05San-Etsu Metal Co., Ltd.5757San-Etsu Metal to expand second factory at Tonami plantSan-Etsu Metal plans to expand the second factory at its Tonami Plant in Toyama Prefecture for its copper and copper-alloy business. The company expects to invest ¥1.14 billion, begin construction in July 2026, and complete the expansion in May 2027 using internal funds.Materials & ChemicalsTonami, Toyama¥1.1BPlanned
2026.08.05Sansei Co., Ltd.6307Sansei to install new production equipment at Shimonoseki factorySansei plans to install production equipment at its Shimonoseki factory in Yamaguchi, supporting its marine-related business. The project is scheduled to begin in March 2026 and be completed in September 2030, with total planned investment of JPY 760 million.Other ManufacturingShimonoseki, Yamaguchi¥760MPlanned
2026.08.05Sawayaka Club Co., Ltd.6059Sawayaka Club to build 70-bed care facility in AbikoSawayaka Club plans to build the Sawayaka Abiko Nibankan care facility in Abiko, Chiba, adding 70 beds. The project is scheduled to start in September 2026 and be completed in July 2027, with total planned investment of JPY 1.125376 billion funded by internal funds and borrowings.OtherAbiko, Chiba¥1.1BPlanned
2026.08.05Sawayaka Club Co., Ltd.6059Sawayaka Club to build new 80-bed care facility in KumagayaSawayaka Club plans to build the Sawayaka Kumagaya Nibankan care facility in Kumagaya, Saitama, adding 80 beds. Construction began in November 2025 and is scheduled for completion in March 2027, funded through internal funds and borrowings.OtherKumagaya, Saitama¥832.6MBuilding
2026.08.05Sawayaka Club Co., Ltd.6059Sawayaka Club to build new Sawayaka Ranzan care facility in SaitamaSawayaka Club plans to develop the provisional Sawayaka Ranzan facility in Ranzan, Saitama, for its nursing-care business. The project is budgeted at JPY 76.215 million, with construction scheduled from October 2026 to November 2027 and capacity for 60 beds after completion.OtherRanzan, Saitama¥76.2MPlanned
2026.08.05Seiren Advanced Materials Co., Ltd.3569Seiren Advanced Materials to build new factory and install equipment in FukuiSeiren Advanced Materials will construct a new factory and install production equipment in Fukui City, Fukui, for its electronics business. The project is expected to increase thermal oxidation thick-film production by 80% and SOI wafer production by 120%, with completion scheduled for June 2027.Semiconductors & ElectronicsFukui, Fukui¥4.4BPlanned
2026.08.05Sumitomo Osaka Cement Co., Ltd.5232Sumitomo Osaka Cement to expand semiconductor-material production capacity at Ichikawa siteSumitomo Osaka Cement plans to expand production capacity for electronic materials used in semiconductor manufacturing equipment by constructing a new production building and related facilities at its Shin Materials Division in Ichikawa, Chiba. The total planned investment is ¥13.105 billion, with construction scheduled from July 2023 through March 2027.Semiconductors & ElectronicsIchikawa, Chiba¥13.1BBuilding
2026.08.05Sumitomo Osaka Cement Co., Ltd.5232Sumitomo Osaka Cement to install cement storage and shipping equipment at Naoetsu PortSumitomo Osaka Cement plans to install storage, shipping and related equipment at its Naoetsu Port service station in Joetsu, Niigata. The project has a total planned investment of ¥2.791 billion, with construction scheduled from August 2025 through January 2028.Logistics FacilitiesJoetsu, Niigata¥2.8BPlanned
2026.08.05Sumitomo Osaka Cement Co., Ltd.5232Sumitomo Osaka Cement to refurbish Shibaura service station and cement plant facilitiesSumitomo Osaka Cement plans a ¥3.823 billion refurbishment project covering its Shibaura service station and Tokyo SOC's Shibaura plant facilities in Minato, Tokyo. Construction started in November 2025 and is scheduled for completion in September 2027.Materials & ChemicalsMinato, Tokyo¥3.8BBuilding
2026.08.05Sumitomo Osaka Cement Co., Ltd.5232Sumitomo Osaka Cement to renew and extend Akiyoshi Mine ship-loading berthSumitomo Osaka Cement is investing in the renewal and extension of the ship-loading berth at Akiyoshi Mine in Mine, Yamaguchi. Construction began in February 2023 and is scheduled for completion in August 2026, supporting the mine's mineral shipping infrastructure.Materials & ChemicalsMine, Yamaguchi¥6.2BBuilding
2026.08.05Sumitomo Osaka Cement Co., Ltd.5232Sumitomo Osaka Cement to renew flue-gas treatment equipment at Gifu plantSumitomo Osaka Cement will renew the flue-gas treatment equipment serving Kiln No. 2 at its Gifu Plant in Motosu, Gifu. The project has a total planned investment of ¥1.296 billion, with construction scheduled from July 2025 through September 2027.Materials & ChemicalsMotosu, Gifu¥1.3BBuilding
2026.08.05Takara Tomy Co., Ltd.7867Takara Tomy to invest ¥3.946 billion in molds at Tokyo headquartersTakara Tomy plans a ¥3.946 billion investment in molds at its headquarters in Katsushika, Tokyo. The company expects to begin the investment in April 2026 and complete it by March 2027, funded internally.Other ManufacturingKatsushika, Tokyo¥3.9BPlanned
2026.08.05Tomy Company, Ltd.7867Takara Tomy to invest ¥673 million in molds at Tomytec headquarters in TochigiTakara Tomy plans to invest ¥673 million in molds at Tomytec's headquarters facility in Mibu, Tochigi. The investment is scheduled to begin in April 2026 and be completed by March 2027, funded internally.Other ManufacturingMibu, Tochigi¥673MPlanned
2026.08.05Toho Chemical Industry Co., Ltd.4409Toho Chemical Industry to expand electronic-material resin production equipment at Chiba plantToho Chemical Industry will invest JPY 2.35 billion to expand resin production equipment for electronic materials at its Chiba Plant in Sodegaura, Chiba. Construction began in March 2023 and is scheduled for completion in November 2026, adding 90 tonnes per year of capacity.Materials & ChemicalsSodegaura, Chiba¥2.4BBuilding
2026.08.05Toho Pharmaceutical Co., Ltd.8129Toho Pharmaceutical to build TBC Tokai distribution facility in KomakiToho Pharmaceutical plans to construct buildings and equipment for the new TBC Tokai facility in Komaki, Aichi, supporting its pharmaceutical wholesale business. The project has a planned investment of ¥6 billion, with construction scheduled from June 2026 to February 2028.Logistics FacilitiesKomaki, Aichi¥6BPlanned
2026.08.05Toho Holdings8129Toho Pharmaceutical to consolidate Takasaki and Maebashi offices at new Takasaki facilityToho Pharmaceutical plans to relocate and consolidate its Takasaki and Maebashi sales offices into a new building and related facilities in Takasaki, Gunma. The project is intended to support its pharmaceutical wholesale operations, with total planned investment of JPY 720 million and completion scheduled for March 2027.Logistics FacilitiesTakasaki, Gunma¥720MPlanned
2026.08.05Toho Pharmaceutical Co., Ltd.8129Toho Pharmaceutical to consolidate three sales offices into a new Saitama facilityToho Pharmaceutical plans to consolidate and relocate its Omiya, Koshigaya, and Urawa-Kawaguchi sales offices into a facility in Midori Ward, Saitama City. The project covers buildings and equipment for the pharmaceutical wholesale business, with construction scheduled from March 2026 to March 2027 and a total planned investment of ¥1.054 billion.Logistics FacilitiesSaitama, Saitama¥1.1BPlanned
2026.08.05Toho Pharmaceutical Co., Ltd.8129Toho Pharmaceutical to consolidate Tochigi and Sano offices at new Tochigi facilityToho Pharmaceutical plans to relocate and consolidate its Tochigi and Sano sales offices into a new building and associated facilities in Tochigi City, Tochigi. The project has a total planned investment of JPY 545 million, with construction scheduled from October 2026 to July 2027.Logistics FacilitiesTochigi, Tochigi¥545MPlanned
2026.08.05Toho Pharmaceutical Co., Ltd.8129Toho Pharmaceutical to relocate and upgrade its Nara Sales OfficeToho Pharmaceutical plans to invest in buildings and equipment for the relocation of its Nara Sales Office in Nara, Nara. The project is scheduled to begin in November 2025 and be completed in October 2026, with total planned investment of ¥820 million.Logistics FacilitiesNara, Nara¥820MBuilding
2026.08.05Toho Holdings Co., Ltd.8129Toho Pharmaceutical to relocate Ishinomaki sales office with new building and equipmentToho Pharmaceutical plans to relocate its Ishinomaki sales office in Miyagi, investing JPY 547 million in a new building and equipment. Construction began in September 2025 and is scheduled for completion in June 2026; the disclosure reports no increase in capacity after completion.Logistics FacilitiesIshinomaki, Miyagi¥547MBuilding
2026.08.05Toho Pharmaceutical Co., Ltd.8129Toho Pharmaceutical to relocate Morioka pharmaceutical distribution officeToho Pharmaceutical plans to invest ¥675 million in a building and related facilities for relocating its Morioka sales office in Morioka, Iwate. Construction is scheduled to begin in July 2026, while the completion date has not been determined; the investment will support its pharmaceutical wholesale operations.Logistics FacilitiesMorioka, Iwate¥675MPlanned
2026.08.05Tohoku Okaya Co., Ltd.6926Tohoku Okaya to install production equipment at Iwate and Fukushima factoriesTohoku Okaya plans to invest in production equipment at its head factory in Ichinoseki, Iwate, and its Fukushima factory in Adachi District, Fukushima. The project will support production of capacitor, display and lighting, and sensor products, with construction planned from April 2026 through March 2027.Semiconductors & ElectronicsIchinoseki; Adachi District, Iwate; Fukushima¥32MPlanned
2026.08.05TOPPAN Holdings Inc.7911TOPPAN Holdings to build Gunma Reiwa film plantTOPPAN Holdings subsidiary Tamapoly is developing the Gunma Reiwa Plant, a new film manufacturing facility in Oizumi, Gunma. The project includes film production equipment, land and buildings, with total planned investment of ¥25.291 billion; construction began in December 2024 and is scheduled for completion in October 2026.Materials & ChemicalsOizumi, Gunma¥25.3BBuilding
2026.08.05Toso Co., Ltd.5956Toso to renew production equipment at Mitsukaido factoryToso plans to invest in production-related equipment at its Mitsukaido factory in Joso, Ibaraki. The investment is intended mainly for rationalization and renewal, with little expected increase in production capacity.Other ManufacturingJoso, Ibaraki¥88.3MPlanned
2026.08.05Toso Co., Ltd.5956Toso to renew production equipment at Tsukuba plantToso plans to invest ¥74.1 million in production-related equipment at its Tsukuba plant in Tsukubamirai, Ibaraki. The investment is intended to rationalize and renew existing equipment, with little expected increase in production capacity.Other ManufacturingTsukubamirai, Ibaraki¥74.1MPlanned
2026.08.05Vertex Corporation5290Vertex Corporation to renew machinery and formwork at Chiba and other plantsVertex Corporation plans a JPY 2.16 billion renewal program for machinery and formwork at its Chiba and other concrete-business plants. The work is scheduled from April 2026 through March 2027 and is expected to add little capacity because it primarily replaces existing equipment.Other ManufacturingChiba¥2.2BPlanned
2026.08.04AIRMAN Co., Ltd.6364AIRMAN to renew and rationalize production equipment at Tsubame factoryAIRMAN plans to invest in the renewal and rationalization of production equipment at its headquarters and factory in Tsubame, Niigata. The project is scheduled to start in April 2026 and be completed by March 2027, with funding from internal funds and borrowings; no increase in production capacity is expected.Machinery & RoboticsTsubame, Niigata¥2.6BPlanned
2026.08.04Akita Shindengen Co., Ltd.6844Akita Shindengen to install semiconductor production equipment at Oura Plant and other sitesAkita Shindengen plans to invest JPY 1.25 billion in semiconductor production equipment and related facilities at its Oura Plant and other sites in Yurihonjo, Akita. Construction and installation are scheduled from April 2026 through March 2027, funded by internal funds, borrowings from the parent company, and leasing.Semiconductors & ElectronicsYurihonjo, Akita¥1.3BPlanned
2026.08.04Asahi Rubber Incorporated5162Asahi Rubber to install industrial rubber equipment at Shirakawa FactoryAsahi Rubber plans to invest in industrial rubber-related equipment at its Shirakawa Factory in Shirakawa, Fukushima. Construction is scheduled to begin in July 2026 and finish in February 2027, increasing capacity by 6%.Materials & ChemicalsShirakawa, Fukushima¥199.5MPlanned
2026.08.04Asahi Seiki Co., Ltd.6111Asahi Seiki to install manufacturing equipment at its Owari-Asahi headquarters plantAsahi Seiki plans to invest ¥578 million in manufacturing equipment at its headquarters plant in Owari-Asahi, Aichi. The project is scheduled to begin in April 2026 and be completed by March 2027, funded internally.Machinery & RoboticsOwariasahi, Aichi¥578MPlanned
2026.08.04Awa Paper Co., Ltd.3896Awa Paper to expand paper-processing equipment at Shin-Komatsushima plantAwa Paper plans to invest ¥666 million in paper-processing equipment at its Shin-Komatsushima Plant in Komatsushima, Tokushima. The project will expand production capacity and improve productivity for supports used in reverse-osmosis (RO) membranes, with construction scheduled from December 2025 through June 2027.Paper & PulpKomatsushima, Tokushima¥666MBuilding
2026.08.04Carmate Co., Ltd.7297Carmate plans mold and related equipment investment at Yuki FactoryCarmate plans to invest in molds and related equipment at its Yuki Factory in Yuki, Ibaraki. The investment is scheduled during fiscal 2026, funded internally, with no post-completion capacity increase disclosed.Automotive & TransportYuki, Ibaraki¥300MPlanned
2026.08.04Chemicon Higashi-Nihon Co., Ltd.6997Chemicon Higashi-Nihon to expand capacitor manufacturing equipment in Yabuki, FukushimaChemicon Higashi-Nihon plans to invest in capacitor manufacturing equipment at its facility in Yabuki, Fukushima. The project is scheduled to begin in October 2025 and be completed in November 2026, increasing capacity by 61%.Semiconductors & ElectronicsYabuki, Fukushima¥766MBuilding
2026.08.04Chubu Foods Co., Ltd.9956Chubu Foods to build new food plant in NakatsugawaChubu Foods plans to establish a new factory in Nakatsugawa, Gifu, to increase manufacturing capacity for its supermarket business. The project has a planned total investment of ¥2.13 billion, funded through internal funds and borrowings; construction and completion dates were not disclosed.Food & BeverageNakatsugawa, Gifu¥2.1BPlanned
2026.08.04Daito Chemix Corporation4366Daito Chemix to install pilot chemical production equipment at Fukui PlantDaito Chemix plans to install chemical product pilot-production equipment at its Fukui Plant in Fukui, Fukui Prefecture. The project has a planned investment of ¥2 billion, with work scheduled from January through September 2026, funded by internal funds and borrowings.Materials & ChemicalsFukui, Fukui¥2BPlanned
2026.08.04Dentas Co., Ltd.6174Dentas subsidiary to acquire mass-production mold for New KISSYOU ion toothbrushesDentas' consolidated subsidiary Ionic will acquire a mass-production molding die for the renewed New KISSYOU ion toothbrush, strengthening product competitiveness and supporting sales expansion. The mold will be installed at Union Gosei's Nasushiobara plant in Tochigi, with operation scheduled to begin in November 2026.Other ManufacturingNasushiobara, Tochigi¥32.7MPlanned
2026.08.04Eku Energy JapanEku Energy Japan completes installation of major equipment at Hirohara Battery Storage FacilityEku Energy Japan has completed delivery and installation of the major equipment, including 32 Tesla Megapack 2 XL battery systems, at the Hirohara Battery Storage Facility in Miyazaki, Miyazaki. Construction, equipment connection work and testing will continue toward planned operation in January 2027; Tokyo Gas will operate the facility under a 20-year offtake agreement.Power & EnergyMiyazaki, Miyazakinot disclosedBuilding
2026.08.04EnBio C Energy Co., Ltd.6092EnBio C Energy to develop solar power facility in NaritaEnBio C Energy, a subsidiary of EnBio Holdings, is developing a solar power generation facility in Narita, Chiba. The project has a total planned investment of JPY 251 million, with construction scheduled from December 2025 to June 2026 and funded through borrowings.Power & EnergyNarita, Chiba¥251MBuilding
2026.08.04Enbio C-West GK6092Enbio C-West to build solar power facility in AtsugiEnbio C-West GK, a subsidiary of Enbio Holdings, plans to install a solar power generation facility in Atsugi, Kanagawa. The project has a total planned investment of ¥68 million, with construction scheduled to begin in October 2026 and finish in January 2027.Power & EnergyAtsugi, Kanagawa¥68MPlanned
2026.08.04EnBio C-West LLC6092EnBio C-West to build solar power facility in KyotanabeEnBio C-West LLC plans to construct a solar power generation facility in Kyotanabe, Kyoto. The project has a total planned investment of ¥531 million, with construction scheduled from September 2026 through January 2027.Power & EnergyKyotanabe, Kyoto¥531MPlanned
2026.08.04EnBio Holdings6092Enbio C-West to install solar power-generation equipment in NagoyaEnbio C-West plans to install solar power-generation equipment in Nagoya, Aichi, with a total planned investment of JPY 253 million. Construction is scheduled to begin in May 2026 and finish in September 2026; funding will be provided through borrowing.Power & EnergyNagoya, Aichi¥253MPlanned
2026.08.04Enbio Holdings, Inc.6092Enbio Holdings to install solar power generation equipment in KawagoeEnbio C-West LLC, a subsidiary of Enbio Holdings, plans to install solar power generation equipment in Kawagoe, Saitama, as part of its renewable energy business. The project has a total planned investment of ¥62 million, with construction scheduled from January to July 2026 and financed through borrowings.Power & EnergyKawagoe, Saitama¥62MBuilding
2026.08.04Fuji Television4676Fuji Television to renew studio equipment at its Tokyo headquartersFuji Television plans to renew studio equipment and related facilities at its headquarters in Minato, Tokyo. The JPY 13.72 billion project is scheduled to start in April 2026 and finish in March 2031, strengthening production capacity and equipment reliability.OtherMinato, Tokyo¥13.7BPlanned
2026.08.04Fujishoji Co., Ltd.6257Fujishoji to invest ¥620 million in molds at Ichinomiya facilityFujishoji plans to invest ¥620 million in molds at its Nagoya facility in Ichinomiya, Aichi, for its gaming-machine business. Construction or installation is scheduled to begin in April 2026 and finish by March 2027, funded internally.Machinery & RoboticsIchinomiya, Aichi¥620MPlanned
2026.08.04Fukuyama Transporting9075Fukuyama Transporting to build truck terminal at AizuwakamatsuFukuyama Transporting subsidiary Minami-Tohoku Fukuyama Transport is investing JPY 1.59 billion to build a truck terminal at its Aizu Sales Office in Aizuwakamatsu, Fukushima. Construction began in March 2025 and is scheduled for completion in October 2026, with post-completion capacity expected to increase by 3,732.Logistics FacilitiesAizuwakamatsu, Fukushima¥1.6BBuilding
2026.08.04Fukuyama Transporting Co., Ltd.9075Fukuyama Transporting to install warehouse automation equipment at Chiba Yachiyo branchFukuyama Transporting plans to install warehouse automation equipment at its Chiba Yachiyo branch in Yachiyo, Chiba. The project has a total planned investment of ¥1.076 billion, with construction beginning in February 2025 and completion scheduled for October 2026.Logistics FacilitiesYachiyo, Chiba¥1.1BBuilding
2026.08.04Furukawa Electric Co., Ltd.5801Furukawa Electric to expand optical-fiber and cable production across four countriesFurukawa Electric will invest approximately JPY 100 billion in manufacturing equipment, land and buildings in the United States, Brazil, Japan and India to expand optical-fiber and rollable ribbon-cable production. The projects are scheduled to begin mass production sequentially from the second half of fiscal 2028, with rollable ribbon-cable capacity expected to approximately double from the end of fiscal 2025, driven by data-center and generative-AI demand.TelecomUnited States; Brazil; Japan; India¥100BPlanned
2026.08.04Geomatec Co., Ltd.6907Geomatec to install manufacturing equipment at Tokyo factoryGeomatec plans to invest JPY 143 million in new manufacturing equipment at its Tokyo factory in Ota, Tokyo. Construction is scheduled to begin in June 2026 and finish in January 2027; the disclosure does not specify the resulting capacity increase.Other ManufacturingOta, Tokyo¥143MPlanned
2026.08.04Geomatec Co., Ltd.6907Geomatec to install new manufacturing equipment at Ako FactoryGeomatec plans to install new manufacturing equipment at its Ako Factory in Ako, Hyogo. The project has a total planned investment of JPY 124.16 million, with work scheduled from April 2026 through March 2027; no capacity increase is disclosed.Other ManufacturingAko, Hyogo¥124.2MPlanned
2026.08.04GEOMATEC Co., Ltd.6907GEOMATEC to install new manufacturing equipment at Kanari FactoryGEOMATEC plans to install manufacturing equipment at its Kanari Factory in Kurihara, Miyagi. The project has a total planned investment of ¥530.75 million, with construction scheduled from April 2026 through March 2027 and financed through borrowings.Semiconductors & ElectronicsKurihara, Miyagi¥530.8MPlanned
2026.08.04Hagoromo Foods Co., Ltd.2831Hagoromo Foods to install packaged cooked-rice production equipment at Sunrise PlantHagoromo Foods plans a JPY 4.5 billion investment in packaged cooked-rice production equipment at its Sunrise Plant in Yaizu, Shizuoka. Construction is scheduled to start in October 2025, with completion planned for January 2027; the disclosure does not specify the resulting capacity increase.Food & BeverageYaizu, Shizuoka¥4.5BBuilding
2026.08.04Higashine Shindengen Co., Ltd.6844Higashine Shindengen to install semiconductor production equipment at Yamagata factoryHigashine Shindengen plans to invest in semiconductor production equipment and related facilities at its factory in Higashine, Yamagata. The investment is scheduled to begin in April 2026 and be completed by March 2027, supporting its power-device business.Semiconductors & ElectronicsHigashine, Yamagata¥411MPlanned
2026.08.04Hokuetsu Corporation3865Hokuetsu Corporation to renew No. 7 recovery boiler furnace panels at Niigata millHokuetsu Corporation plans to renew the furnace evaporation-tube panels of the No. 7 recovery boiler at its Niigata mill. The project is budgeted at JPY 1.95 billion, with work scheduled from October 2025 through December 2027 and funded internally.Paper & PulpNiigata, Niigata¥2BBuilding
2026.08.04IKK Co., Ltd.3435IKK to install manufacturing equipment at its Numazu headquarters facilityIKK plans to install manufacturing equipment at its headquarters facility in Numazu, Shizuoka. The JPY 69.8 million investment is lease-financed, with installation scheduled from November to December 2026.Other ManufacturingNumazu, Shizuoka¥69.8MPlanned
2026.08.04Japan Oil Transportation Co., Ltd.9074Japan Oil Transportation to lease 97 tanker vehicles for transport-capacity expansion and replacementJapan Oil Transportation plans to invest JPY 2.045 billion in leased tanker assets for Enex's Kanto branch and other sites in Ichikawa, Chiba, and elsewhere. The investment will expand and replace transport capacity by 97 vehicles, with deployment planned from April 2026 through March 2027.Logistics FacilitiesIchikawa, Chiba¥2BPlanned
2026.08.04Japan Petroleum Transportation Co., Ltd.9074Japan Petroleum Transportation to expand and replace tanker truck fleet in ChibaJapan Petroleum Transportation plans to invest JPY 405 million in tanker trucks operated by Enex branches and other facilities in Ichikawa, Chiba, and elsewhere. The project will expand and replace transport capacity by eight vehicles, with work planned from April 2026 through March 2027.Logistics FacilitiesIchikawa, Chiba¥405MPlanned
2026.08.04Zeon Corporation4205Japan Zeon to expand high-performance resin production at Tokuyama PlantJapan Zeon plans to invest approximately ¥78.0 billion in high-performance resin production equipment at its Tokuyama Plant in Shunan, Yamaguchi. Construction began in the second half of 2025, with completion scheduled for the second half of 2028; the project is expected to add approximately 12,000 tonnes per year of capacity.Materials & ChemicalsShunan, Yamaguchi¥78BBuilding
2026.08.04Kanto Denka Kogyo Co., Ltd.4047Kanto Denka Kogyo expands fluorine and battery-material production at Mizushima PlantKanto Denka Kogyo is installing and expanding manufacturing equipment for fluorine-based products and battery-material products at its Mizushima Plant in Kurashiki, Okayama. Construction began in March 2022 and completion is scheduled for December 2027, with total planned investment of ¥17.983 billion.Materials & ChemicalsKurashiki, Okayama¥18BBuilding
2026.08.04Key Coffee Inc.2594Key Coffee to install roasting machine at Chubu Factory in KasugaiKey Coffee plans to invest JPY 2.033 billion in a roasting machine at its Chubu Factory in Kasugai, Aichi. Construction began in March 2025 and completion is scheduled for October 2027, funded with the company's own funds.Food & BeverageKasugai, Aichi¥2BBuilding
2026.08.04Kinki Petroleum Transportation Co., Ltd.9074Kinki Petroleum Transportation to expand and replace tanker-truck fleet in YokkaichiKinki Petroleum Transportation plans a ¥247 million investment in tanker trucks at its Yokkaichi, Mie facility. The project will increase petroleum transport capacity and replace 11 vehicles, with work scheduled from April 2026 through March 2027.Logistics FacilitiesYokkaichi, Mie¥247MPlanned
2026.08.04KOKUSAI ELECTRIC CORPORATION6525KOKUSAI ELECTRIC to develop semiconductor equipment at Toyama facilityKOKUSAI ELECTRIC is investing in development and evaluation facilities for batch deposition equipment and single-wafer plasma treatment equipment at its Toyama site. The project began in November 2023 and is scheduled for completion in March 2027, with total planned investment of ¥9.817 billion.Semiconductors & ElectronicsToyama, Toyama¥9.8BBuilding
2026.08.04Kurimoto5602Kurimoto to install lightweight steel pipe manufacturing equipment at Koga factory and other sitesKurimoto plans a total investment of ¥2.317 billion in lightweight steel pipe manufacturing equipment at its Koga factory and other locations. Construction began in April 2024 and is scheduled for completion in March 2027, funded with internal resources.Steel & Non-ferrous MetalsKoga, Ibaraki¥2.3BBuilding
2026.08.04Kurimoto, Ltd.5602Kurimoto to install Polycon and FRP pipe manufacturing equipment at Koto plant and other sitesKurimoto Iron Works plans to invest ¥4.117 billion in Polycon and FRP pipe manufacturing equipment at its Koto plant in Higashiomi, Shiga, and other locations. Construction began in April 2024 and is scheduled for completion in March 2027, funded with internal resources.Materials & ChemicalsHigashiomi, Shiga¥4.1BBuilding
2026.08.04MARS Group Holdings Corporation6419MARS Group Holdings to install product manufacturing equipment at Higashi-Fuji FactoryMARS Group Holdings plans to invest JPY 362.12 million in product manufacturing equipment at its Higashi-Fuji Factory in Gotemba, Shizuoka. Construction or installation began in October 2025 and is scheduled for completion in December 2026, funded internally.Other ManufacturingGotemba, Shizuoka¥362.1MBuilding
2026.08.04Meiko Trans Co., Ltd.9357Meiko Trans to build Kisosaki Logistics Center warehouse in MieMeiko Trans plans to build the Kisosaki Logistics Center warehouse in Kisosaki, Mie, to expand its port transportation-related logistics facilities. The project has a total planned investment of JPY 5.207 billion, with construction scheduled from January 2026 through March 2027.Logistics FacilitiesKisosaki, Mie¥5.2BBuilding
2026.08.04Meiko Trans Co., Ltd.9357Meiko Trans to develop Nishihama logistics facility in TobishimaMeiko Trans plans a warehouse logistics facility at Nishihama in Tobishima, Aichi, for its port transportation and related businesses. Construction began in January 2026, while the total planned investment and completion date were not disclosed.Logistics FacilitiesTobishima, Aichinot disclosedBuilding
2026.08.04MIRAIT ONE CorporationMIRAIT ONE installs liquid-cooled container data center for AI infrastructure validationMIRAIT ONE has installed a 20-foot water-cooled container data center at its Shinkiba building in Tokyo, equipped with Delta Electronics' Liquid-to-Air Coolant Distribution Unit (LTA CDU). The facility will validate high-performance GPU servers and IOWN-enabled next-generation AI infrastructure, with operations scheduled to begin from September 2026.Data CentersKoto, Tokyonot disclosedCompleted
2026.08.04Mitsubishi Paper Mills3864Mitsubishi Paper Mills to relocate and renovate Kyoto R&D CenterMitsubishi Paper Mills plans to relocate and renovate its Kyoto R&D Center in Nagaokakyo, Kyoto. The project has a total planned investment of ¥430 million, with work scheduled from October 2025 through July 2026.R&D FacilitiesNagaokakyo, Kyoto¥430MBuilding
2026.08.04Mitsubishi Paper Mills Limited3864Mitsubishi Paper Mills to renew coal-boiler tertiary superheater at Hachinohe millMitsubishi Paper Mills plans a partial renewal of the tertiary superheater in the coal boiler at its Hachinohe mill in Hachinohe, Aomori. The project has a total planned investment of JPY 1.76 billion, with work scheduled from March 2026 through March 2028.Power & EnergyHachinohe, Aomori¥1.8BPlanned
2026.08.04Nagano Keiki Co., Ltd.7715Nagano Keiki to renew and improve pressure-gauge and Bourdon-tube production equipment at Ueda plantNagano Keiki plans to invest ¥160.073 million to renew and improve production equipment for pressure gauges and Bourdon tubes at its Ueda Measuring Instruments Factory in Ueda, Nagano. Construction is scheduled from April 2026 through March 2027 and will be funded with internal funds and borrowings.Other ManufacturingUeda, Nagano¥160.1MPlanned
2026.08.04Nihon Seiko Co., Ltd.5729Nihon Seiko to expand antimony processing capacity at Nakase SmelterNihon Seiko plans to invest in production equipment at its Nakase Smelter in Yabu, Hyogo, to increase capacity for specially processed antimony trioxide products by approximately 20%. Construction is scheduled from April 2026 through March 2027 and will be funded internally.Materials & ChemicalsYabu, Hyogo¥213.8MPlanned
2026.08.04Nippon Chutetsu Kan Co., Ltd.5612Nippon Chutetsu Kan to expand ductile iron pipe capacity at Kuki plantNippon Chutetsu Kan plans to install capacity-expansion equipment for ductile iron straight pipes at its Kuki Plant in Kuki, Saitama. The project began in March 2025, with completion planned for the second half of fiscal 2026; funding will come from borrowings.Steel & Non-ferrous MetalsKuki, Saitama¥2.7BBuilding
2026.08.04Nippon Denko Co., Ltd.5729Nippon Denko to renew production equipment at Nakase Smelter in YabuNippon Denko plans to invest ¥15.89 million in production equipment at its Nakase Smelter in Yabu, Hyogo. The company will fund the project internally, with work scheduled from April 2026 through March 2027; the investment is not expected to materially increase production capacity.Materials & ChemicalsYabu, Hyogo¥15.9MPlanned
2026.08.04Nippon Kinzoku Co., Ltd.5491Nippon Kinzoku to install stainless steel strip manufacturing equipment at Itabashi plantNippon Kinzoku plans to invest ¥1.355 billion in stainless steel strip manufacturing equipment at its Itabashi plant in Tokyo. Construction is scheduled to start in April 2026 and finish in March 2027, funded internally.Steel & Non-ferrous MetalsItabashi, Tokyo¥1.4BPlanned
2026.08.04Nippon Oil Transportation Co., Ltd.9074Nippon Oil Transportation to procure containers to expand transport capacityNippon Oil Transportation plans to invest in containers at its Shinagawa, Tokyo operation to expand and replace transport capacity. The project is scheduled to begin in April 2026 and be completed by March 2027, adding or replacing 193 containers.Logistics FacilitiesShinagawa, Tokyo¥581MPlanned
2026.08.04Nippon Petroleum Transportation Co., Ltd.9074Nippon Petroleum Transportation to lease containers to expand transport capacityNippon Petroleum Transportation plans a ¥244 million investment in leased containers at its Shinagawa, Tokyo operation. The project will expand and replace transport capacity by 150 containers, with implementation scheduled from April 2026 through March 2027.Logistics FacilitiesShinagawa, Tokyo¥244MPlanned
2026.08.04Nippon Seiko Co., Ltd.5729Nippon Seiko to install production equipment at Noda metal-powder plantNippon Seiko plans to install production equipment at the Noda Head Office Factory of its subsidiary Nippon Atomized Metal Powders Corporation in Noda, Chiba. The ¥49.09 million investment is scheduled to begin in February 2025 and be completed in February 2027; the company says it will not materially affect production capacity.Materials & ChemicalsNoda, Chiba¥49.1MBuilding
2026.08.04Nippon Sharyo Manufacturing Co., Ltd.7102Nippon Sharyo to renew horizontal machining center at Narumi WorksNippon Sharyo Manufacturing will renew a horizontal machining center at its Narumi Works in Nagoya, Aichi, for its construction machinery segment. The JPY 155 million project is scheduled to start in September 2025 and be completed in September 2026, funded internally.Machinery & RoboticsNagoya, Aichi¥155MBuilding
2026.08.04Nippon Transcity9310Nippon Transcity to develop warehouse facilities in Kisosaki, MieNippon Transcity plans a ¥3.0 billion warehouse-equipment investment at its logistics site in Kisosaki, Mie. Construction began in September 2025 and is scheduled for completion in March 2027; the disclosure does not state the resulting capacity increase.Logistics FacilitiesKisosaki, Mie¥3BBuilding
2026.08.04Nippon Yamamura Glass5210Nippon Yamamura Glass to renew and modify production equipment at Tokyo PlantNippon Yamamura Glass will invest JPY 592 million to maintain and modify production equipment at its Tokyo Plant in Sagamihara, Kanagawa. The project is scheduled to begin in March 2026 and finish in March 2027, maintaining production capacity while improving labor efficiency in its glass-bottle business.Materials & ChemicalsSagamihara, Kanagawa¥592MPlanned
2026.08.04Nippon Yamamura Glass Co., Ltd.5210Nippon Yamamura Glass to renew production equipment at Harima plantNippon Yamamura Glass plans a ¥1.469 billion renewal and modification project for production equipment at its Harima plant in Kako District, Hyogo. Construction began in January 2025 and is scheduled for completion in March 2027; the disclosure states no increase in capacity after completion.Materials & ChemicalsHyogo¥1.5BBuilding
2026.08.04Nissin Foods Co., Ltd.Nissin Foods to build new Cup Noodles factory in TsukubamiraiNissin Foods will build the Tsukubamirai Factory in Ibaraki Prefecture as a dedicated Cup Noodles production facility. Construction is scheduled to begin in May 2027, with operations planned to start during fiscal 2029; the factory will incorporate heat-recovery and reuse equipment to reduce manufacturing CO2 emissions by more than 10%.Food & BeverageTsukubamirai, Ibaraki¥70BPlanned
2026.08.04Nitto Kogyo Corporation6651Nitto Kogyo to expand production equipment at Kikugawa plantNitto Kogyo plans to invest ¥1.139 billion in production equipment for switchboards, cabinets and related products at its Kikugawa plant in Shizuoka. Construction is scheduled to run from April 2026 through March 2027.Other ManufacturingKikugawa, Shizuoka¥1.1BPlanned
2026.08.04Nitto Kogyo Corporation6651Nitto Kogyo to expand production equipment at Seto FactoryNitto Kogyo plans to invest JPY 698 million in production equipment for switchboards, cabinets, circuit breakers and switches, parts, and related products at its Seto Factory in Seto, Aichi. Construction is scheduled to run from April 2026 through March 2027.Machinery & RoboticsSeto, Aichi¥698MPlanned
2026.08.04Nitto Kogyo Corporation6651Nitto Kogyo to install system-rack production equipment at Nogi Tochigi PlantNitto Kogyo plans to invest in production equipment for system racks and related products at its Nogi Tochigi Plant in Nogi, Tochigi. The project is scheduled to start in April 2026 and be completed by March 2027, with total planned investment of ¥554 million.Semiconductors & ElectronicsNogi, Tochigi¥554MPlanned
2026.08.04NKK Switches Co., Ltd.6943NKK Switches Pionics to build new switch production facility in YokohamaNKK Switches Pionics is investing in a new factory and switch production equipment at its facility in Totsuka Ward, Yokohama. Construction began in June 2023 and is scheduled for completion in March 2027, with total planned investment of ¥2.427 billion.Semiconductors & ElectronicsYokohama, Kanagawa¥2.4BBuilding
2026.08.04Oriental Land Co., Ltd.4661Oriental Land to renew Space Mountain and surrounding area at Tokyo DisneylandOriental Land plans a 70.5 billion yen renewal of Space Mountain and the surrounding area at Tokyo Disneyland in Urayasu, Chiba. Construction began in April 2022 and is scheduled for completion in 2027, with funding from internal resources and other sources.OtherUrayasu, Chiba¥70.5BBuilding
2026.08.04Origin Co., Ltd.6513Origin to install power-equipment research facilities at its Saitama headquarters siteOrigin plans to invest in research facilities and related equipment for power devices at its headquarters site in Sakura Ward, Saitama City. The project is scheduled to begin in March 2026 and be completed in September 2026, funded through internal funds and borrowings.R&D FacilitiesSaitama, Saitama¥23MPlanned
2026.08.04Origin Company, Limited6513Origin to install precision mechanical component production and research equipment at Mamada PlantOrigin plans to invest JPY 245 million in production equipment and research facilities for precision mechanical components at its Mamada Plant in Oyama, Tochigi. The project started in September 2023 and is scheduled for completion in March 2027, funded through internal funds and borrowings.Machinery & RoboticsOyama, Tochigi¥245MBuilding
2026.08.04Origin Co., Ltd.6513Origin to install synthetic resin coating production and research equipment at Mizuho PlantOrigin plans to invest in synthetic resin coating production equipment and related research facilities at its Mizuho Plant in Mizuho, Tokyo. The project is scheduled to begin in March 2026 and be completed in March 2027, funded through internal resources and borrowings.Materials & ChemicalsMizuho, Tokyo¥87MPlanned
2026.08.04Sankei Building Co., Ltd.4676Sankei Building develops Kitamatsudo logistics facility in MatsudoSankei Building is developing the Kitamatsudo logistics facility in Matsudo, Chiba, as part of Fuji Media Holdings' urban development and tourism business. Construction began in March 2024 and is scheduled for completion in June 2027, with total planned investment of ¥16.177 billion.Logistics FacilitiesMatsudo, Chiba¥16.2BBuilding
2026.08.04Sanko Techno Co., Ltd.3435Sanko Techno to build logistics center at Nagareyama siteSanko Techno plans to establish a logistics center at its Nagareyama business site in Chiba, Japan. The project has a total planned investment of ¥2 billion, with construction scheduled to begin in November 2024 and completion planned for July 2026.Logistics FacilitiesNagareyama, Chiba¥2BBuilding
2026.08.04Shimojima Co., Ltd.7482Shimojima to build logistics center in Kasai, HyogoShimojima plans to invest ¥14.911 billion in logistics equipment at its Kasai Logistics Center in Kasai, Hyogo. Construction began in December 2025 and is scheduled for completion in June 2028, increasing capacity by 25%.Logistics FacilitiesKasai, Hyogo¥14.9BPlanned
2026.08.04Shindengen Electric Manufacturing Co., Ltd.6844Shindengen Electric Manufacturing to install semiconductor production equipment at Hadano facilitiesShindengen Electric Manufacturing plans to invest ¥145 million in semiconductor production equipment and related facilities at Hadano Shindengen and other sites in Hadano, Kanagawa. Construction and installation are scheduled from April 2026 through March 2027, funded by internal funds, parent-company borrowing and leasing.Semiconductors & ElectronicsHadano, Kanagawa¥145MPlanned
2026.08.04Shindengen Electric Manufacturing Co., Ltd.6844Shindengen Electric Manufacturing to invest ¥3.605 billion in production and R&D equipmentShindengen Electric Manufacturing plans to invest ¥3.605 billion in production equipment and research and development facilities at its Asaka site and other locations in Japan. The investment is scheduled to begin in April 2026 and be completed by March 2027, funded by internal resources, borrowings and leases.Semiconductors & ElectronicsAsaka, Saitama¥3.6BPlanned
2026.08.04Shindengen Three E Co., Ltd.6844Shindengen Three E to install power-supply production equipment in Hanno and elsewhereShindengen Three E plans to install power-supply production equipment and related facilities at its Ashikariba plant in Hanno, Saitama, and other locations. The project has a total planned investment of JPY 229 million, with work scheduled from April 2026 through March 2027.Power & EnergyHanno, Saitama¥229MPlanned
2026.08.04Tagawa Co., Ltd.4093Tagawa to renew large ice-making equipment factory in KatoriTagawa plans to invest in its head factory in Katori, Chiba, to address aging facilities and improve productivity for large ice-making equipment production. Construction is scheduled to begin in September 2026 and finish in May 2027; the investment amount has not been disclosed.Machinery & RoboticsKatori, Chibanot disclosedPlanned
2026.08.04Tempearl Industrial Co., Ltd.6651Tempearl Industrial to install switchboard and circuit-breaker production equipment at Kabe FactoryTempearl Industrial plans to invest JPY 162 million in production equipment for distribution boards, circuit breakers and related products at its Kabe Factory in Hiroshima, Japan. The project is scheduled to begin in April 2026 and finish in March 2027.Power & EnergyHiroshima, Hiroshima¥162MPlanned
2026.08.04Tempearl Industry Co., Ltd.6651Tempearl Industry to install distribution-board and circuit-breaker production equipment at Ozu factoryTempearl Industry plans to invest JPY 961 million in production equipment for distribution boards, circuit breakers and related products at its head office and Ozu factory in Hiroshima City. Construction or installation is scheduled to begin in April 2026 and be completed in March 2027.Other ManufacturingHiroshima, Hiroshima¥961MPlanned
2026.08.04Toho Acetylene Co., Ltd.4093Toho Acetylene to build food-additive gas filling plant in ShiroiToho Acetylene plans to invest JPY 539 million in a food-additive gas filling plant at its Kanto sales office in Shiroi, Chiba. The facility is scheduled to be completed in October 2026 and is expected to increase supply capacity by 70%.Materials & ChemicalsShiroi, Chiba¥539MPlanned
2026.08.04Tokyo Kikai Seisakusho6335Tokyo Kikai Seisakusho to build parts warehouse at Kazusa Techno CenterTokyo Kikai Seisakusho plans to invest JPY 420 million in a parts warehouse at its Kazusa Techno Center in Kisarazu, Chiba. Construction began in January 2026 and is scheduled for completion in June 2026, funded internally.Logistics FacilitiesKisarazu, Chiba¥420MBuilding
2026.08.04Tokyu LandTokyu Land completes and starts operating agrivoltaic solar power plant in KumagayaTokyu Land and Saitama Fukko developed and completed the ReENE Solar Farm Kumagaya agrivoltaic power plant in Kumagaya, Saitama, with operations beginning on April 1, 2026. The facility consolidates 35 agricultural parcels covering approximately 4 hectares, grows wheat beneath elevated solar panels, and supplies electricity to Tokyu Land-owned offices and commercial facilities through an off-site PPA.Power & EnergyKumagaya, Saitamanot disclosedCompleted
2026.08.04Trusco Nakayama Corporation9830Trusco Nakayama commissions Skypod warehouse automation system at Planet AichiTrusco Nakayama began full-scale operation of a 3D high-speed Skypod picking system at its new Planet Aichi logistics center in Kitanagoya, Aichi. The center began operations on May 18, 2026 and has approximately 89,162 sqm of floor space; the automation system supports higher-density storage, labor saving and faster picking for tools and other industrial supplies.Logistics FacilitiesKitanagoya, Aichinot disclosedCompleted
2026.08.04Ukai Co., Ltd.7621Ukai to develop confectionery production complex in HachiojiUkai plans to invest JPY 2.18 billion in Atelier Ukai Cafe & Factory HACHIOJI, a multi-purpose complex centered on a confectionery manufacturing workshop. The facility is scheduled for completion from mid-August 2026 onward.Food & BeverageHachioji, Tokyo¥2.2BPlanned
2026.08.04UMC Electronics Co., Ltd.6615UMC Electronics to install manufacturing equipment at Hadano FactoryUMC Electronics plans to invest JPY 335 million in manufacturing equipment at its Hadano Factory in Hadano, Kanagawa. The project is scheduled to begin in April 2026 and be completed by March 2027, supporting the company's electronics manufacturing services business.Semiconductors & ElectronicsHadano, Kanagawa¥335MPlanned
2026.08.04UMC Electronics Co., Ltd.6615UMC Electronics to invest ¥1.322 billion in manufacturing facilities across four Japanese factoriesUMC Electronics plans a total investment of ¥1.322 billion in manufacturing equipment, building-related facilities, and software at its Saitama, Miyazaki, Saga, and Hadano factories. Construction and installation are scheduled from April 2026 through March 2027, supporting its electronics manufacturing services business.Semiconductors & ElectronicsSaitama; Miyazaki; Saga; Kanagawa¥1.3BPlanned
2026.08.04Ushio Inc.6925Ushio Electric to install production equipment at Harima facilityUshio Electric plans to invest ¥1.524 billion in production equipment at its Harima facility in Himeji, Hyogo. Construction is scheduled from April 2026 through March 2027, funded internally; no capacity increase is disclosed.Other ManufacturingHimeji, Hyogo¥1.5BPlanned
2026.08.04Ushio Inc.6925Ushio to install production equipment at its Gotemba facilityUshio Inc. plans to install production equipment at its Gotemba facility in Gotemba, Shizuoka, for its Industrial Process business. The project is scheduled to begin in April 2026 and be completed by March 2027, with planned investment of ¥2.527 billion funded internally.Other ManufacturingGotemba, Shizuoka¥2.5BPlanned
2026.08.04Valor Holdings Co., Ltd.9956Valor Holdings to build new Nakatsugawa factory in GifuValor Holdings plans to build a new factory in Nakatsugawa, Gifu, for its supermarket business. The project is expected to increase manufacturing capacity, with total planned investment of JPY 279 million; construction and completion dates were not disclosed.Food & BeverageNakatsugawa, Gifu¥279MPlanned
2026.08.04Yamada Holdings Co., Ltd.9831Yamada Holdings to develop waste-incineration power-generation facility in GunmaYamada Holdings is developing a waste-incineration power-generation facility in Gunma Prefecture. Construction began in April 2024 and completion is scheduled for December 2026; the disclosure does not state the total planned investment or generating capacity.Power & EnergyGunmanot disclosedBuilding
2026.08.04Yotai Co., Ltd.5357Yotai to install a large high-pressure press at its Mizunami PlantYotai plans to install a large high-pressure press at its Mizunami Plant in Mizunami, Gifu, to support its refractories business. The project is scheduled to start in January 2026 and be completed in June 2026, with total planned investment of JPY 200 million funded internally.Materials & ChemicalsMizunami, Gifu¥200MPlanned
2026.08.04Yotai Co., Ltd.5357Yotai to install mixing equipment at its Nissei plant in BizenYotai plans to install mixing equipment at its Nissei Plant in Bizen, Okayama, for its refractory-products business. The project has a total planned investment of ¥150 million, began in May 2025, and is scheduled for completion in December 2026.Materials & ChemicalsBizen, Okayama¥150MBuilding
2026.08.03Ahresty Corporation5852Ahresty Kumamoto to install new die-casting production equipment in UkiAhresty Kumamoto plans to invest JPY 270 million in die-casting production equipment and related facilities at its site in Uki, Kumamoto. Construction or installation is scheduled to begin in April 2026 and finish in March 2027, funded through internal funds and borrowings.Automotive & TransportUki, Kumamoto¥270MPlanned
2026.08.03Ahresty Corporation5852Ahresty to install die-casting production equipment at Tokai PlantAhresty plans to invest in die-casting production equipment and related facilities at its Tokai Plant in Toyohashi, Aichi. The company expects to spend ¥2.71 billion, with work scheduled from April 2026 through March 2027, funded by internal funds and borrowings.Automotive & TransportToyohashi, Aichi¥2.7BPlanned
2026.08.03Ahresty Corporation5852Ahresty Tochigi to install new die-casting production equipment in TochigiAhresty Tochigi plans to invest in die-casting production equipment and related facilities at its plant in Mibu, Tochigi. The project is scheduled to start in April 2026 and be completed by March 2027, funded through internal funds and borrowings.Automotive & TransportMibu, Tochigi¥1.3BPlanned
2026.08.03Ahresty Corporation5852Ahresty Yamagata to install new die-casting production equipmentAhresty Yamagata plans to invest JPY 350 million in die-casting production equipment and related facilities at its plant in Shirataka, Yamagata. Construction is scheduled to begin in April 2026 and be completed by March 2027, funded through internal funds and borrowings.Automotive & TransportShirataka, Yamagata¥350MPlanned
2026.08.03Akechi Ceramics Co., Ltd.5363Akechi Ceramics to install refractory production equipment at Ena facilityAkechi Ceramics Co., Ltd., a subsidiary of TYK Corporation, plans to invest ¥440.8 million in new refractory production equipment at its facility in Ena, Gifu. Construction is scheduled to run from April 2026 through March 2027 and will be funded internally.Materials & ChemicalsEna, Gifu¥440.8MPlanned
2026.08.03AuBEX Corporation3583AuBEX Corporation to install medical-device production equipment at Tokyo headquartersAuBEX Corporation plans to invest in medical-device production equipment at its headquarters in Sumida, Tokyo. Construction is scheduled to start in April 2026 and finish by March 2027, funded through internal funds and borrowings.Pharma & MedicalSumida, Tokyo¥80MPlanned
2026.08.03AuBEX Corporation3583AuBEX Corporation to install sign-pen production equipment at Chiba facilityAuBEX Corporation plans a ¥140 million investment in new sign-pen production equipment at its Core Center in Shiroi, Chiba. Construction is scheduled to begin in April 2026 and finish in March 2027, funded through internal funds and borrowings.Other ManufacturingShiroi, Chiba¥140MPlanned
2026.08.03AuBEX Medical Inc.3583AuBEX Medical to install medical-device production equipment at Kagoshima PlantAuBEX Medical Inc. plans to install medical-device production equipment at its Kagoshima Plant in Aira, Kagoshima. The project is scheduled to begin in April 2026 and be completed by March 2027, funded through internal resources.Pharma & MedicalAira, Kagoshima¥60MPlanned
2026.08.03Chuo Malleable Iron Co., Ltd.5607Chuo Malleable Iron to install casting equipment at Gifu Kujiri PlantChuo Malleable Iron plans to install casting equipment at its Gifu Kujiri Plant in Toki, Gifu. The equipment is a replacement investment with no increase in production capacity; construction is scheduled from March 2026 to March 2027 and will be funded internally.Steel & Non-ferrous MetalsToki, Gifu¥84.4MPlanned
2026.08.03Chuo Malleable Iron Co., Ltd.5607Chuo Malleable Iron to install casting equipment at Nisshin PlantChuo Malleable Iron plans to invest in casting equipment at its Nisshin Plant in Nisshin, Aichi. The equipment is scheduled for installation from March 2026 through March 2027 and will replace existing equipment without increasing capacity.Steel & Non-ferrous MetalsNisshin, Aichi¥828.8MPlanned
2026.08.03Chuo Malleable Iron Co., Ltd.5607Chuo Malleable Iron to install casting equipment at Toki siteChuo Malleable Iron Co., Ltd. plans to invest JPY 52.018 million in casting equipment at its Toki, Gifu site. The equipment will replace existing assets, so no capacity increase is expected; construction is scheduled from April 2026 through March 2027.Steel & Non-ferrous MetalsToki, Gifu¥52MPlanned
2026.08.03Chuo Malleable Iron Co., Ltd.5607Chuo Malleable Iron to install processing equipment at Kumamoto plantChuo Malleable Iron plans to invest in processing equipment at its Kumamoto plant in Ozu, Kumamoto. The equipment will replace existing equipment, with no increase in production capacity; construction is scheduled from March 2026 to March 2027.Steel & Non-ferrous MetalsOzu, Kumamoto¥123.1MPlanned
2026.08.03Dai Nippon Color & Composite4116Dai Nippon Color & Composite to install manufacturing equipment at Kazo siteDai Nippon Color & Composite plans to invest ¥62 million in manufacturing equipment at its Kazo manufacturing facility in Kazo, Saitama. Construction began in September 2025, with completion scheduled for October 2026; the disclosure does not state the resulting capacity increase.Materials & ChemicalsKazo, Saitama¥62MBuilding
2026.08.03Daihatsu Infinearth6023Daihatsu Infinearth to install internal-combustion-engine manufacturing development and testing equipmentDaihatsu Infinearth plans to install development and testing equipment for internal-combustion-engine manufacturing at its Moriyama First and Second Plants in Shiga, Japan. Total planned investment is ¥12.01 billion per the facility plan table.Automotive & TransportMoriyama, Shiga¥12BPlanned
2026.08.03Daihatsu Infinearth6023Daihatsu Infinearth to install internal-combustion-engine manufacturing equipment at Himeji plantDaihatsu Infinearth plans a new investment in internal-combustion-engine manufacturing equipment at its Himeji plant in Hyogo, Japan. Work is scheduled to begin in April 2026; the filing does not disclose the investment amount, capacity increase, or completion date. Total planned investment is ¥3.66 billion per the facility plan table.Automotive & TransportHimeji, Hyogo¥3.7BPlanned
2026.08.03Dainichiseika Color & Chemicals Mfg. Co., Ltd.4116Dainichiseika Color & Chemicals to install manufacturing equipment at Hitech Chem in NaritaDainichiseika Color & Chemicals plans to install manufacturing equipment at Hitech Chem's facility in Narita, Chiba. The project has a total planned investment of ¥121 million, with construction starting in December 2025 and completion scheduled for May 2027.Materials & ChemicalsNarita, Chiba¥121MBuilding
2026.08.03Dainichiseika Color & Chemicals Co., Ltd.4116Dainichiseika Color & Chemicals to install manufacturing equipment at Tokai siteDainichiseika Color & Chemicals plans to install manufacturing equipment at its Tokai Manufacturing Site in Iwata, Shizuoka. The project began in April 2025 and is scheduled for completion in July 2026, funded through internal resources and other sources.Materials & ChemicalsIwata, Shizuoka¥48MBuilding
2026.08.03Dainichiseika Color & Chemicals Mfg. Co., Ltd.4116Dainichiseika Color & Chemicals to install production and testing equipment at Tokyo siteDainichiseika Color & Chemicals plans to invest in new production and testing equipment at its Tokyo Manufacturing Site in Adachi, Tokyo. The ¥148 million project is scheduled to run from October 2025 through October 2026 and will be funded with internal funds and other sources.Materials & ChemicalsAdachi, Tokyo¥148MBuilding
2026.08.03Dainichiseika Color & Chemicals Mfg. Co., Ltd.4116Dainichiseika to build buildings and testing facilities at Bando siteDainichiseika Color & Chemicals plans to invest in buildings and testing facilities at its Bando Manufacturing Site in Bando, Ibaraki. The project is scheduled to start in January 2026 and be completed in December 2027, funded through internal funds and other sources.Materials & ChemicalsBando, Ibaraki¥2.2BPlanned
2026.08.03Daishinku Corp.6962Daishinku to install new production equipment at Tokushima facilityDaishinku plans to invest ¥2.2 billion in new production equipment at its Tokushima facility in Yoshinogawa, Tokushima. Construction is scheduled to run from April 2026 through March 2027, funded by internal funds, borrowings and subsidies.Semiconductors & ElectronicsYoshinogawa, Tokushima¥2.2BPlanned
2026.08.03Daishinku Corp.6962Daishinku to install new production equipment at Tottori facilityDaishinku plans to invest JPY 900 million in new production equipment at its Tottori facility in Tottori, Japan. Construction or installation is scheduled to begin in April 2026 and be completed by March 2027, funded through internal funds, borrowings, and subsidies.Semiconductors & ElectronicsTottori, Tottori¥900MPlanned
2026.08.03Daiwa Energy Co., Ltd.1925Daiwa Energy completes largest-ever repowering of DREAM Solar Hyogo ToyookaDaiwa Energy, a subsidiary of Daiwa House Industry, completed its largest-ever repowering project at the DREAM Solar Hyogo Toyooka solar power plant in Toyooka, Hyogo. The project replaced the existing solar panels and power conditioners, with first-year planned generation and electricity-sale revenue expected to increase by up to approximately 40%.Power & EnergyToyooka, Hyogonot disclosedCompleted
2026.08.03Hitech Chem Co., Ltd.4116Hitech Chem to invest in a building at its Narita siteHitech Chem, a subsidiary of Dainichiseika Color & Chemicals, plans to invest in a building at its facility in Narita, Chiba. Construction is scheduled to start in January 2026 and finish in October 2026, with a total planned investment of JPY 185 million funded by internal resources and other means.Other ManufacturingNarita, Chiba¥185MPlanned
2026.08.03Sanix Holdings Co., Ltd.4651Hokkaido Sanix Environment to install plastic shredding equipment in TomakomaiHokkaido Sanix Environment plans to install a plastic shredding machine at its facility in Tomakomai, Hokkaido. The project has a total planned investment of ¥628 million and is expected to increase processing capacity by 30%; work is scheduled from January through September 2026.Other ManufacturingTomakomai, Hokkaido¥628MPlanned
2026.08.03Isewan Terminal Service Co., Ltd.9359Isewan Terminal Service to build Nishina-Minato No. 3 warehouse in TobishimaIsewan Terminal Service plans to construct the Nishina-Minato No. 3 Warehouse in Tobishima, Aichi, for storing import and export cargo. The project has a total planned investment of ¥7.4 billion, with construction scheduled from March 2026 to January 2028 and funded by internal resources and bank borrowings.Logistics FacilitiesTobishima, Aichi¥7.4BPlanned
2026.08.03Kasumigaseki Capital Co., Ltd.3498Kasumigaseki Capital starts construction of frozen automated warehouse LOGI FLAG TECH Miyoshi IIKasumigaseki Capital has begun construction of LOGI FLAG TECH Miyoshi II, an automated frozen warehouse in Miyoshi, Saitama. The facility will include chilled and frozen storage areas, automated rack systems, natural-refrigerant equipment, and rooftop solar panels, with capacity for 21,846 pallets.Logistics FacilitiesMiyoshi, Saitamanot disclosedBuilding
2026.08.03Menicon Co., Ltd.7780Menicon to add three daily disposable contact-lens production lines at Kakamigahara PlantMenicon plans to invest JPY 3.447 billion in production-line molds and related equipment at its Kakamigahara Plant in Kakamigahara, Gifu. The project will expand capacity by adding three production lines for daily disposable contact lenses; construction began in June 2023, while no completion date is disclosed.Pharma & MedicalKakamigahara, Gifu¥3.4BBuilding
2026.08.03Mitsubishi Chemical Group Corporation4188Mitsubishi Chemical starts operating floating solar power facility at Hiroshima plantMitsubishi Chemical has begun using electricity from a floating solar power facility installed at the regulating pond of its Hiroshima plant under an onsite power purchase agreement. Kyowalak Co., Ltd. installed, owns and operates the facility, which supplies part of the site's electricity without using the external transmission grid.Power & EnergyHiroshimanot disclosedCompleted
2026.08.03Mitsubishi Kakoki Kaisha6331Mitsubishi Kakoki Kaisha to expand factory and offices at Kawasaki headquartersMitsubishi Kakoki Kaisha plans new factory and office facilities at its headquarters and Kawasaki Works in Kawasaki, Kanagawa. The project is scheduled for completion in December 2028; the planned investment amount and capacity increase were not disclosed.Machinery & RoboticsKawasaki, Kanagawanot disclosedPlanned
2026.08.03Naikai Zosen Corporation7018Naikai Zosen to install two tower cranes and other equipment at Setoda ShipyardNaikai Zosen plans to invest JPY 2.7 billion in two tower cranes and other equipment at its Setoda Factory in Onomichi, Hiroshima. Construction began in March 2025 and is scheduled for completion in March 2028, funded internally.Machinery & RoboticsOnomichi, Hiroshima¥2.7BBuilding
2026.08.03Nihon Dengi Co., Ltd.1723Nihon Dengi to build research facility in Narashino, ChibaNihon Dengi plans to construct a research and related facility in Narashino, Chiba. Construction is scheduled to start in February 2028 and be completed in August 2029, funded with internal resources; the total planned investment amount is undisclosed.R&D FacilitiesNarashino, Chibanot disclosedPlanned
2026.08.03Nihon Parkerizing Co., Ltd.4095Nihon Parkerizing plans chemical manufacturing plant in KitakyushuNihon Parkerizing plans to establish a chemical manufacturing plant in Wakamatsu Ward, Kitakyushu, Fukuoka. The planned total investment is ¥10 billion; construction and completion dates have not yet been determined.Materials & ChemicalsKitakyushu, Fukuoka¥10BPlanned
2026.08.03Nippon Soda Co., Ltd.4041Nippon Soda to expand and modernize manufacturing equipment at Chiba PlantNippon Soda plans to invest JPY 951 million in manufacturing equipment expansion, rationalization, and maintenance renewal at its Chiba Plant in Ichihara, Chiba. Construction is scheduled from April 2026 through March 2027, funded internally.Materials & ChemicalsIchihara, Chiba¥951MPlanned
2026.08.03Nippon Soda Co., Ltd.4041Nippon Soda to install new boiler at Takaoka PlantNippon Soda plans to install a boiler at its Takaoka Plant in Takaoka, Toyama. The project has a total planned investment of JPY 1.23 billion, with construction starting in March 2025 and completion scheduled for May 2027.Materials & ChemicalsTakaoka, Toyama¥1.2BBuilding
2026.08.03Nippon Soda Co., Ltd.4041Nippon Soda to install pharmaceutical excipient production equipment at its Niigata plantNippon Soda plans to invest ¥10.45 billion in new pharmaceutical excipient production equipment at its Nihongi Plant in Joetsu, Niigata. Construction started in January 2023 and is scheduled for completion in August 2026, funded with internal resources.Pharma & MedicalJoetsu, Niigata¥10.5BBuilding
2026.08.03Nippon Soda Co., Ltd.4041Nippon Soda to upgrade and renew manufacturing equipment at Nihongi plant in NiigataNippon Soda plans reinforcement, rationalisation and renewal of manufacturing equipment at its Nihongi plant in Joetsu, Niigata. The facility plan discloses ¥1.83 billion, with work from April 2026 to March 2027, self-funded.Materials & ChemicalsJoetsu, Niigata¥1.8BPlanned
2026.08.03Nippon Soda Co., Ltd.4041Nippon Soda to upgrade and renew manufacturing equipment at Takaoka plant in ToyamaNippon Soda plans reinforcement, rationalisation and renewal of manufacturing equipment at its Takaoka plant in Takaoka, Toyama. The facility plan discloses ¥2.46 billion, with work from April 2026 to March 2027, self-funded.Materials & ChemicalsTakaoka, Toyama¥2.5BPlanned
2026.08.03Nipro Pharma Corporation8086Nipro Pharma to build general injectable drug facility in RittoNipro Pharma is constructing a general injectable drug manufacturing building and installing production equipment at its site in Ritto, Shiga. The project has a total planned investment of ¥37.08 billion, began in July 2022, and is scheduled for completion in August 2026, increasing capacity by 47.7 million units per year.Pharma & MedicalRitto, Shiga¥37.1BBuilding
2026.08.03Ogura Clutch Co., Ltd.6408Ogura Clutch to install manufacturing equipment at Daiichi Factory in KiryuOgura Clutch plans to install manufacturing equipment for general industrial products at its Daiichi Factory in Kiryu, Gunma. Construction is scheduled to begin in April 2026 and be completed by March 2027; the planned investment amount and capacity increase were not disclosed.Machinery & RoboticsKiryu, Gunmanot disclosedPlanned
2026.08.03Parker Processing Co., Ltd.4095Parker Processing to build new Kansai factory in Kasai, HyogoParker Processing Co., Ltd., a subsidiary of Nippon Parkerizing, plans to construct a new Kansai factory in Kasai, Hyogo, for its processing business. Construction began in August 2024 and is scheduled for completion in June 2026, with total planned investment of JPY 2.489 billion.Other ManufacturingKasai, Hyogo¥2.5BBuilding
2026.08.03Sanko Co., Ltd.6964Sanko to install mold-manufacturing equipment at Fukuoka Minoh FactorySanko plans to invest JPY 86 million in mold-manufacturing equipment and other facilities at its Fukuoka Minoh Factory in Kurume, Fukuoka. Construction or installation is scheduled to begin in June 2026, funded through internal resources; no capacity increase or completion date is disclosed.Machinery & RoboticsKurume, Fukuoka¥86MPlanned
2026.08.03Sanko Co., Ltd.6964Sanko to install mold manufacturing equipment at its Shiojiri headquarters factorySanko Co., Ltd. plans to invest ¥131 million in mold manufacturing equipment and related facilities at its headquarters factory in Shiojiri, Nagano. Construction or installation is scheduled to begin in April 2026, funded with internal resources; no completion date or capacity increase is disclosed.Machinery & RoboticsShiojiri, Nagano¥131MPlanned
2026.08.03SEMITEC Corporation6626SEMITEC to build new Yamaguchi factory in UbeSEMITEC plans to construct a new factory in Ube, Yamaguchi, to increase production capacity and strengthen business continuity. The project has a total planned investment of ¥2.945 billion, with construction scheduled from September 2026 through July 2027.Other ManufacturingUbe, Yamaguchi¥2.9BPlanned
2026.08.03Shizuki Electric Co., Ltd.6994Shizuki Electric to build headquarters production building in NishinomiyaShizuki Electric plans to construct a new production building at its headquarters in Nishinomiya, Hyogo. The project has a total planned investment of ¥2.1 billion, with construction scheduled from September 2025 to October 2027 and financed through internal funds and borrowings.Other ManufacturingNishinomiya, Hyogo¥2.1BBuilding
2026.08.03Showa Pax Co., Ltd.3954Showa Pax to build factory, warehouse and office facility in KitamotoShowa Pax plans to invest JPY 7.8 billion in a new factory, warehouse and office facility at its Tokyo Plant in Kitamoto, Saitama. Construction is scheduled to start in November 2026 and finish in June 2031, supporting the heavy-duty packaging bag segment.Paper & PulpKitamoto, Saitama¥7.8BPlanned
2026.08.03Showa Pax Co., Ltd.3954Showa Pax to install pinch-bag manufacturing line at Hofu factoryShowa Pax plans to install a pinch-bag manufacturing line at its Hofu factory in Hofu, Yamaguchi. The project has a total planned investment of JPY 823.498 million, began in December 2022, and is scheduled for completion in September 2026.Other ManufacturingHofu, Yamaguchi¥823.5MBuilding
2026.08.03Superbag Co., Ltd.3945Superbag to install paper shopping-bag production equipment at Tokorozawa PlantSuperbag plans to invest ¥80 million in paper shopping-bag production equipment at its Tokorozawa Plant in Tokorozawa, Saitama. Construction or installation began in November 2025 and is scheduled for completion in June 2026; the disclosure does not state an increase in capacity.Paper & PulpTokorozawa, Saitama¥80MBuilding
2026.08.03Symphonia Technology Co., Ltd.6507Symphonia Technology to install production equipment at Ise WorksSymphonia Technology plans to invest JPY 12.1 billion in production equipment at its Ise Works in Ise, Mie. Construction began in May 2025 and is scheduled for completion in August 2026, funded with the company's own funds.Machinery & RoboticsIse, Mie¥12.1BBuilding
2026.08.03Takaoka Toko Co., Ltd.6617Takaoka Toko to expand oil and gas transformer factory in HasudaTakaoka Toko plans to expand its oil and gas transformer factory at the Hasuda site in Saitama. The project has a total planned investment of JPY 1.61 billion, with construction scheduled from June 2025 through June 2027.Power & EnergyHasuda, Saitama¥1.6BPlanned
2026.08.03Takeyama Foundry Co., Ltd.5607Takeyama Foundry to install casting equipment at Kumamoto PlantTakeyama Foundry plans to invest in casting equipment at its Kumamoto Plant in Ozu, Kumamoto. The project is scheduled to start in April 2026 and be completed by March 2027; because it replaces existing equipment, no capacity increase is expected.Steel & Non-ferrous MetalsOzu, Kumamoto¥99.5MPlanned
2026.08.03TAOKE ENERGY Co., Ltd.TAOKE ENERGY completes grid connection for 2 MW battery storage facility in TaharaTAOKE ENERGY completed grid interconnection on July 31, 2026 for a new high-voltage battery storage facility in Mutsurecho, Tahara, Aichi. The facility has a rated output of 2 MW and storage capacity of 8.14 MWh, and is scheduled to enter Japan's primary reserve market in October 2026.Power & EnergyTahara, Aichinot disclosedCompleted
2026.08.03Tohbu Network Co., Ltd.9036Tohbu Network to build hazardous-materials warehouse in KikuchiTohbu Network plans to invest JPY 2.18 billion in a hazardous-materials warehouse in Kikuchi, Kumamoto, funded with internal resources. Construction began in December 2025 and is scheduled for completion in April 2027.Logistics FacilitiesKikuchi, Kumamoto¥2.2BBuilding
2026.08.03Toko Toshiba Meter Systems Co., Ltd.6617Toko Toshiba Meter Systems to install second-generation smart-meter production equipment in HasudaToko Toshiba Meter Systems plans to install production equipment for second-generation smart meters at its facility in Hasuda, Saitama. The project has a total planned investment of JPY 1.626 billion, with construction beginning in October 2024 and completion scheduled for September 2026.Semiconductors & ElectronicsHasuda, Saitama¥1.6BBuilding
2026.08.03Tokyo Yogyo Co., Ltd.5363Tokyo Yogyo to install new R&D equipment at Tajimi research instituteTokyo Yogyo Co., Ltd. (TYK Corporation) plans to invest in new research and development equipment at its research institute in Tajimi, Gifu. The project has a total planned investment of ¥168.802 million, funded internally, with work scheduled from April 2026 through March 2027.R&D FacilitiesTajimi, Gifu¥168.8MPlanned
2026.08.03Tokyo Yogyo Co., Ltd.5363Tokyo Yogyo to install refractory production equipment in TajimiTokyo Yogyo Co., Ltd. (TYK Corporation) plans to install refractory production equipment at its manufacturing plant in Tajimi, Gifu. The project has a total planned investment of ¥916.6 million, with construction scheduled from April 2026 through March 2027 and financed internally.Materials & ChemicalsTajimi, Gifu¥916.6MPlanned
2026.08.03Unitika Ltd.3103Unitika to renovate film manufacturing plant at Uji siteUnitika plans building renovation and related work at its film manufacturing plant in Uji, Kyoto. Construction began in October 2021 and is scheduled for completion in March 2032, with total planned investment of ¥6.269 billion.Materials & ChemicalsUji, Kyoto¥6.3BBuilding
2026.08.02Aiphone6718Aiphone to establish new headquarters and R&D facility in NagoyaAiphone will construct a new headquarters and research-and-development facility at its Nagoya site in Aichi Prefecture. The project, with planned investment of approximately 200 million yen, is scheduled to begin in December 2025 and complete by September 2027.R&D FacilitiesNagoya, Aichi¥2MPlanned
2026.08.02Chino Corporation6850Chino to enhance production efficiency and R&D capabilities at Tendo facility in YamagataChino Corporation plans to invest ¥257 million in production efficiency improvements and research and development expansion at its Tendo business site in Yamagata Prefecture. The project supports the company's measurement and control instrument sensor business segment.Other ManufacturingTendo, Yamagata¥257MPlanned
2026.08.02Chino Corporation6850Chino to enhance production efficiency at Fujioka facility in GunmaChino Corporation plans a capex investment to improve production efficiency and other upgrades at its Fujioka business site in Gunma Prefecture. The project is funded through internal resources and represents operational enhancement of the company's measurement and control equipment manufacturing facility.Machinery & RoboticsFujioka, Gunma¥54MPlanned
2026.08.02Chino Corporation6850Chino to enhance production efficiency at Kuki facility in SaitamaChino Corporation plans a capital investment of 49 million yen at its Kuki business site in Saitama Prefecture to improve production efficiency in the sensor instrumentation systems segment. The project scope and timeline details are not yet finalized.Machinery & RoboticsKuki, Saitama¥49MPlanned
2026.08.02Chuetsu Pulp & Paper Co., Ltd.3877Chuetsu Pulp & Paper to build high-function cellulose nanofiber pilot plant at Takaoka facilityChuetsu Pulp & Paper is investing ¥2.4 billion to construct a pilot plant for high-function cellulose nanofiber (CNF) production at its Takaoka facility in Toyama. The facility will produce 60 tonnes of CNF annually and is classified as part of the company's other business segment.Paper & PulpTakaoka, Toyama¥2.4BPlanned
2026.08.02Densan Co., Ltd.3640Densan to expand storage and equipment capacity at Nagano headquartersDensan plans to expand storage and related equipment at its headquarters in Nagano to support order growth. The project involves approximately ¥183.7 million in capital investment, with work beginning April 2026 and targeted completion by January 2027.OtherNagano, Nagano¥183.7MPlanned
2026.08.02Denyo6517Denyo to establish production facility for generators, welding machines, and compressors at Fukui plantDenyo will invest ¥411 million to build new production equipment for generators, welding machines, compressors and related products at its Fukui plant in Wakasa, Fukui Prefecture. Construction will run from April 2026 to March 2027, funded from internal resources.Machinery & RoboticsWakasa, Fukui¥411MPlanned
2026.08.02DMS Inc.9782DMS to install production equipment at Saitama business centerDMS will invest ¥510 million to install production equipment at its operations center in Sakura ward, Saitama city. The project, funded from internal resources, will begin in May 2026 and complete by March 2027, addressing replacement demand for production capacity.Other ManufacturingSaitama, Saitama¥510MPlanned
2026.08.02Ebara Food Industries2819Ebara Food Industries to construct new building at Tsuyama plantEbara Food Industries plans to build a new facility building at its Tsuyama plant in Okayama Prefecture. The project will be funded through internal resources, with construction scheduled to begin in September 2026 and complete by November 2026.Food & BeverageTsuyama, Okayama¥143MPlanned
2026.08.02Eidai Onahama Co., Ltd.7822Eidai Onahama to build new particle board production equipment at Iwaki facilityEidai Onahama, a subsidiary of Eidai Co., Ltd. (TSE: 7822), is investing ¥1.8 billion to install new particle board production equipment at its Iwaki, Fukushima site. Construction began December 2025 with completion targeted for October 2026.Materials & ChemicalsIwaki, Fukushima¥1.8BBuilding
2026.08.02Futaba Corporation6986Futaba Corporation to develop electronic equipment facilities at Chosei plantFutaba Corporation plans to invest ¥30 million in new development equipment for electronic devices at its Chosei plant in Chiba Prefecture. The project runs from April 2026 to March 2027 and will be financed through internal resources. The facilities will not materially increase existing product production capacity.Semiconductors & ElectronicsChosei, Chiba¥30MPlanned
2026.08.02Futaba Corporation6986Futaba Corporation to install mold material manufacturing equipment at Chosei plantFutaba Corporation is investing ¥602 million to install manufacturing equipment for mold materials at its Chosei plant in Chiba Prefecture. The project is expected to begin in April 2026 and complete by March 2027. The equipment will support existing product lines without adding new production capacity.Machinery & RoboticsChosei District, Chiba¥602MPlanned
2026.08.02Haseko Corporation1808Haseko Corporation to build construction materials manufacturing factory in Gojo, NaraHaseko Corporation is constructing a new construction materials manufacturing factory in Gojo, Nara Prefecture. The project represents a capex investment of 6.5 billion yen, with construction beginning in July 2025 and expected completion in February 2027.Other ManufacturingGojo, Nara¥6.5BPlanned
2026.08.02Hino Motors543AHino Motors to invest in production equipment at Tokyo Hino plantHino Motors plans to invest 35.5 billion yen in production equipment and related facilities at its Tokyo Hino site. The project will commence in April 2026 and is scheduled for completion by March 2027, funded through internal equity capital.Automotive & TransportHino, Tokyo¥35.5BPlanned
2026.08.02Kaken Pharmaceutical Co., Ltd.4521Kaken Pharmaceutical to expand agricultural chemical production capacity at Shizuoka facilityKaken Pharmaceutical is investing ¥12.3 billion to expand agricultural chemical production equipment at its Shizuoka plant in Fujieda. The project began in November 2025 and is scheduled for completion in fiscal year 2027 or later, targeting enhanced production capacity.Pharma & MedicalFujieda, Shizuoka¥12.3BBuilding
2026.08.02Kawaden Co., Ltd.6648Kawaden to build power distribution control equipment factory at Kaminoyama siteKawaden will construct a new manufacturing facility for power distribution control equipment at its Kaminoyama site in Yamagata Prefecture. The project is scheduled to begin in January 2027 and reach completion in January 2029. The company will fund the investment through internal resources and borrowed funds.Machinery & RoboticsKaminoyama, Yamagatanot disclosedPlanned
2026.08.02Kimura Chemical Plants Co., Ltd.6378Kimura Chemical Plants to upgrade building-attached equipment at Oita factoryKimura Chemical Plants is investing ¥77 million to upgrade building-attached equipment at its Oita factory in Oita Prefecture. The project, funded from internal resources, began in April 2026 and is scheduled for completion in July 2026. The upgrade is characterized as equipment renewal with minimal capacity increase.Machinery & RoboticsOita, Oita¥77MBuilding
2026.08.02Kitagawa Corporation6317Kitagawa Corporation to expand casting manufacturing and processing equipment at Fukuyama plantKitagawa Corporation is investing ¥134 million to expand casting manufacturing and processing equipment at its Fukuyama facility in Hiroshima. The project commenced in June 2025 and is scheduled for completion in June 2026, with funding from retained earnings and borrowings.Machinery & RoboticsFukuyama, Hiroshima¥134MBuilding
2026.08.02Kitazawa Sangyo Co., Ltd.9930Kitazawa Sangyo to rebuild headquarters in Shibuya, TokyoKitazawa Sangyo plans to rebuild its Tokyo headquarters in Shibuya Ward with total investment of ¥2.0 billion. Construction is scheduled to begin in November 2025 and complete in July 2028, funded by internal resources.OtherShibuya, Tokyo¥2BPlanned
2026.08.02Meiyo Electric Co., Ltd.6850Meiyo Electric to build new factory in Shimizu, ShizuokaMeiyo Electric, a subsidiary of Chino Corporation (a listed Japanese measurement-equipment manufacturer), plans to construct a new factory in Shimizu Ward, Shizuoka City. The project is budgeted at ¥2.2 billion and will expand sensor production capacity; ¥681 million has already been paid.Other ManufacturingShizuoka, Shizuoka¥2.2BPlanned
2026.08.02Mitsuboshi Belting Ltd.5192Mitsuboshi Belting to enhance belt manufacturing equipment at Ayabe Production Systems Development CenterMitsuboshi Belting will invest ¥453 million to expand and upgrade belt manufacturing equipment at its Ayabe Production Systems Development Center in Kyoto. Construction begins May 2025 and is scheduled for completion in October 2027.Machinery & RoboticsAyabe, Kyoto¥453MPlanned
2026.08.02Mitsuboshi Belting Ltd.5192Mitsuboshi Belting to enhance belt manufacturing equipment at Shiga plantMitsuboshi Belting plans to upgrade and enhance belt manufacturing equipment at its Shiga plant in Takashima. The project represents a capital investment in production capacity expansion at the company's domestic belt manufacturing facility.Machinery & RoboticsTakashima, Shiga¥1.2BPlanned
2026.08.02Mitsuboshi Belting Ltd.5192Mitsuboshi Belting to expand belt manufacturing equipment at Nagoya plantMitsuboshi Belting is investing ¥381 million to enhance belt manufacturing equipment at its Nagoya factory in Komaki, Aichi Prefecture. The capex project runs from July 2025 to July 2027, funded from internal resources.Machinery & RoboticsKomaki, Aichi¥381MPlanned
2026.08.02Mitsuboshi Belting Ltd.5192Mitsuboshi Belting to restructure Shikoku plant in Sanuki, KagawaMitsuboshi Belting is undertaking a factory restructuring project at its Shikoku facility in Sanuki, Kagawa Prefecture. The company plans to invest approximately 1.058 billion yen in total, with work commencing in September 2024 and completion targeted for April 2027.Machinery & RoboticsSanuki, Kagawa¥1.1BBuilding
2026.08.02Nakanishi Manufacturing Co., Ltd.5941Nakanishi Manufacturing to expand Gunma factoryNakanishi Manufacturing plans to expand its Gunma factory in Isesaki with a total investment of approximately 3.46 billion yen. Construction began in March 2025 with completion targeted for November 2026. The expansion supports the company's commercial kitchen equipment manufacturing business.Other ManufacturingIsesaki, Gunma¥3.5BBuilding
2026.08.02Nankai Plywood Co., Ltd.7887Nankai Plywood to install solar power generation system at Shido factoryNankai Plywood will construct a solar photovoltaic system at its Shido factory in Sanuki, Kagawa Prefecture. The investment of ¥130 million is funded from internal cash reserves, with installation to begin in December 2026 and completion targeted for August 2027.Power & EnergySanuki, Kagawa¥130MPlanned
2026.08.02Nippon Koki Co., Ltd.4403Nippon Koki to build new manufacturing equipment at Shirakawa plant in FukushimaNippon Koki, an industrial explosives and machinery manufacturer in the NOF group, is building new manufacturing equipment at its Shirakawa plant in Nishishirakawa, Fukushima. The facility plan discloses ¥18.03 billion of planned investment, with ¥4.75 billion already paid; work runs from January 2025 to September 2027.Materials & ChemicalsNishishirakawa, Fukushima¥18BBuilding
2026.08.02NOF Corporation4403NOF to build new manufacturing equipment at Nippon Koki site in Fukushima, completing 2027NOF Corporation is building a second tranche of new manufacturing equipment for its chemicals and explosives (kayaku) segment at the Nippon Koki site in Nishishirakawa, Fukushima. The facility plan discloses ¥44.58 billion, with ¥3.45 billion already paid; work runs from July 2025 to December 2027.Materials & ChemicalsNishishirakawa, Fukushima¥44.6BBuilding
2026.08.02NOF Corporation4403NOF to build new manufacturing equipment at Nippon Koki site in Fukushima, completing 2029NOF Corporation is building new manufacturing equipment for its chemicals and explosives (kayaku) segment at the Nippon Koki site in Nishishirakawa, Fukushima. The facility plan discloses ¥54.55 billion of planned investment, with ¥8.84 billion already paid; work runs from January 2025 to February 2029.Materials & ChemicalsNishishirakawa, Fukushima¥54.6BBuilding
2026.08.02NOF Corporation4403NOF to expand manufacturing equipment at Aichi business siteNOF (Aichi Business Office) is implementing a manufacturing equipment expansion at its Taketoyo facility in Chita District, Aichi Prefecture. The project is in the chemical products segment with 7,749 million yen already paid as of the disclosure date. Total planned investment is ¥23.40 billion per the facility plan table.Materials & ChemicalsTaketoyo, Aichi¥23.4BPlanned
2026.08.02Showa Kinzoku Kogyo4403Showa Kinzoku Kogyo to install new manufacturing equipment at Sakurakawa facilityShowa Kinzoku Kogyo, a subsidiary or affiliate of NOF Corporation (4403), plans to install new manufacturing equipment at its facility in Sakurakawa, Ibaraki Prefecture. The project is classified under the chemicals segment. No investment amount, construction timeline, or capacity increase has been disclosed. Total planned investment is ¥1.09 billion per the facility plan table.Materials & ChemicalsSakurakawa, Ibaraki¥1.1BPlanned
2026.08.02Soft99 Corporation4464Soft99 Corporation to build PVA sponge development and production equipment at Koga facilitySoft99 Corporation plans to invest ¥442 million to construct new PVA (polyvinyl alcohol) sponge development and production equipment at its Aion Kanto factory in Koga, Ibaraki. The equipment is expected to begin operation in the second half of fiscal 2027, supporting the company's porous materials business segment.Materials & ChemicalsKoga, Ibaraki¥442MPlanned
2026.08.02Soft99 Corporation4464Soft99 Corporation to invest in production equipment at Mita plant in HyogoSoft99 Corporation is investing 74 million yen in production equipment and software for its Mita facility in Hyogo Prefecture. The fine chemicals manufacturer plans to begin construction in H1 FY2027 and complete by H2 FY2027.Materials & ChemicalsMita, Hyogo¥74MPlanned
2026.08.02Tigers Polymer Corporation4231Tigers Polymer to acquire molds and equipment for resin molding at Amagasaki facilityTigers Polymer is investing in molds and production equipment for its resin molding operations at its Amagasaki purchasing department facility in Hyogo. The capex of ¥619 million will be funded from internal resources, with construction scheduled from April 2026 to March 2027.Other ManufacturingAmagasaki, Hyogo¥618.8MPlanned
2026.08.02Tigers Polymer Corporation4231Tigers Polymer to build industrial hose manufacturing equipment at Tochigi plantTigers Polymer is investing ¥270 million to install industrial hose manufacturing equipment at its Tochigi factory in Takanezawa, Shioya District. Construction began in April 2026 and is scheduled for completion by March 2027.Other ManufacturingTakanezawa, Tochigi¥270MPlanned
2026.08.02Tigers Polymer Corporation4231Tigers Polymer to install sheet and mat manufacturing equipment at Okayama plantTigers Polymer is investing ¥342.3 million to install new sheet and mat manufacturing equipment at its Okayama plant in Bizen. Construction runs from April 2026 to March 2027, funded through internal resources.Other ManufacturingBizen, Okayama¥342.3MPlanned
2026.08.02Togami Electric Mfg. Co., Ltd.6643Togami Electric to install CLK-15J automated assembly line at Saga facilityTogami Electric is investing ¥821 million to build an automated assembly line (CLK-15J) for industrial switchgear at its Saga plant. The project began in September 2022 and is scheduled for completion in September 2027, funded from internal resources.Machinery & RoboticsSaga, Saga¥821MBuilding
2026.08.02Topre Kyushu Co., Ltd.5975Topre Kyushu to expand automotive press die and production equipment at Kurume and Kanda plantsTopre Kyushu, a subsidiary of Topre Corporation (TSE: 5975), is expanding automotive press component dies and production equipment at its Kurume and Kanda facilities in Fukuoka Prefecture. The total investment is ¥5.897 billion, with construction underway since December 2024 and scheduled completion in August 2026.Machinery & RoboticsKurume, Fukuoka¥5.9BBuilding
2026.08.02Topre Corporation5975Topre to build new refrigerated truck factory at Tochigi siteTopre is constructing a sixth refrigerated truck factory at its Tochigi business site in Kamikawachi, Tochigi Prefecture as part of its temperature-controlled logistics business expansion. The project is budgeted at approximately 2.01 billion yen with completion planned for July 2026.Logistics FacilitiesKamikawachi, Tochigi¥2BBuilding
2026.08.02Topre Corporation5975Topre to expand automotive press component dies and production equipment at Sagamihara facilityTopre is expanding its Sagamihara plant in Kanagawa with new dies and production equipment for automotive press components. The 3.356 billion yen project began in April 2025 and is scheduled for completion by March 2027, funded through internal resources and borrowings.Automotive & TransportSagamihara, Kanagawa¥3.4BBuilding
2026.08.02Yamada Corporation6392Yamada Corporation to build warehouse building at Sagamihara plantYamada Corporation, a pump and fluid-equipment manufacturer, is constructing a new warehouse building at its Sagamihara plant in Kanagawa. The facility plan discloses ¥1.49 billion of planned investment, with ¥1.02 billion already paid; work runs from April 2025 to September 2026, self-funded.Logistics FacilitiesSagamihara, Kanagawa¥1.5BBuilding
2026.08.02Yamada Corporation6392Yamada Corporation to invest in mold equipment at Sagamihara plantYamada Corporation is executing a capital investment of approximately 301 million yen at its Sagamihara plant in Kanagawa Prefecture for mold and related equipment. The project, funded from internal resources, commenced in April 2026 and is scheduled for completion by March 2027.Machinery & RoboticsSagamihara, Kanagawa¥301MBuilding
2026.08.02Yamato Steel Co., Ltd.5444Yamato Steel to upgrade rolling and electrical equipment at Himeji headquartersYamato Steel, the domestic electric-furnace steelmaking subsidiary of Yamato Kogyo, is running a long-term equipment modernization programme at its Himeji headquarters in Hyogo Prefecture. The programme covers rolling mill replacement, electrical system renewal and related works, and is expected to raise production capacity by 20%. Total planned investment is ¥50 billion, of which ¥19.1 billion had been spent as of the filing. Work started in August 2021 and is scheduled to finish in FY2030.Steel & Non-ferrous MetalsHimeji, Hyogo¥50BBuilding
2026.08.02Yuken Kogyo Co., Ltd.6393Yuken Kogyo to install automatic lathes for fixed iron core and stopper processing at Sagami plantYuken Kogyo is investing ¥72 million to install automatic lathes for fixed iron core and stopper processing at its headquarters and Sagami facility in Ayase, Kanagawa. The equipment installation began in April 2026 and is self-funded.Machinery & RoboticsAyase, Kanagawa¥72MBuilding
2026.07.31Kohsoku Corporation7504Kohsoku to open Toyama sales office in TakaokaKohsoku, a Japanese logistics company, will open its Toyama sales office in Takaoka, Toyama Prefecture in August 2026. The 806 sqm facility will be the company's second sales base in the Hokuriku region (after Kanazawa) and will expand the company's logistics network from 54 to 55 nationwide locations.Logistics FacilitiesTakaoka, Toyamanot disclosedCompleted
2026.07.31Kyoei Steel5440Kyoei Steel raises Vinton Steel (US) mill investment to $437 millionKyoei Steel has increased total capex for its Vinton Steel LLC subsidiary in Texas from $327 million to $437 million, reflecting inflation, supply-chain cost pressures, and construction demand in the US. The project includes a new steelmaking facility (360,000 net tons/year capacity) and major renovation of the rolling mill, with construction commencing July 2026 and integrated production starting October 2027. This cornerstone North American facility will deploy world-first direct-cast billet welding-and-rolling technology.Steel & Non-ferrous MetalsVinton area, Texas$437MPlanned
2026.07.31Mitsubishi Materials Corporation5711Mitsubishi Materials to expand H.C. Starck tungsten recycling capacity at Goslar, Germany by about 50%Mitsubishi Materials will invest approximately EUR 50 million to expand tungsten scrap processing capacity at H.C. Starck's flagship Goslar, Germany facility from 5,000 tonnes/year to 7,000 tonnes/year. New equipment construction will begin in 2026 and be completed in 2028. Post-investment, the facility is expected to source virtually all its tungsten feedstock from recycled material, strengthening Europe's critical minerals supply chain resilience.Materials & ChemicalsGoslar, GermanyEUR 50MPlanned
2026.07.31RENOVA, Inc.9519RENOVA to develop 99.9 MW / 280 MWh battery storage facility in Fukuroi, ShizuokaRENOVA's project company R.Six Energy Storage LLC signed a project financing agreement with Mizuho Bank for a 99.9 MW / 280 MWh grid-scale battery storage facility in Ukari, Fukuroi, Shizuoka Prefecture. The loan is about JPY7.2 billion; the total project cost is not disclosed. Construction is scheduled for FY2026 with commercial operation in FY2029. It is RENOVA's second storage project to reach project financing, taking its operating and under-construction storage capacity to 452 MW.Power & EnergyFukuroi, Shizuokanot disclosedPlanned
2026.07.31Seal EngineeringSeal Engineering to develop 2MW grid-scale battery storage facility in SaitamaSeal Engineering, a subsidiary of listed Remix Point (3825), has developed a grid-scale battery storage facility in Ogano, Chichibu District, Saitama, which partner Fit Founder has sold to a customer company. The 2MW/8MWh facility is planned to begin operation in January 2027 and will support renewable energy integration and grid stability in Japan's energy transition.Power & EnergyOgano, Saitamanot disclosedBuilding
2026.07.31Tokyu Land CorporationTokyu Land to develop mixed-use redevelopment at JR Ashiya Station South DistrictAshiya City is advancing a redevelopment project in the JR Ashiya Station South District, targeting September 2026 groundbreaking with completion in August 2030. Tokyu Land is participating as the specified builder, with Taikensetsu handling basic and detailed design. The project includes an 11-story, 2-basement mixed-use building with 51 residential units, retail, offices, dining, and public facilities including a library function and citizen activity center on the third floor.OtherAshiya, Hyogonot disclosedPlanned
2026.07.30Higashi-Kanamachi 1-chome West District Urban Redevelopment AssociationHigashi-Kanamachi 1-chome West District Redevelopment to begin Phase II construction in November 2026The Higashi-Kanamachi 1-chome West District Urban Redevelopment Association is proceeding with Phase II of a major mixed-use redevelopment in Katsushika Ward, Tokyo, per Katsushika Ward's own project page. Phase II construction is scheduled to start in FY2026 and complete in October 2030; Phase I (completed 2025) included a 40-story, 900-unit residential and commercial tower.OtherKatsushika Ward, Tokyonot disclosedPlanned
2026.07.30Hokkaido Electric Power Company, Inc.9509Hokkaido Electric Power sets August 2027 completion date for Tomari Nuclear Power Station seawallHokkaido Electric Power has determined the completion date of the seawall installation project at Tomari Nuclear Power Station to be August 2027. The project, which began in March 2024 as a tsunami countermeasure, involves a rock-anchored concrete and cement-stabilized soil structure with a height of 19.0 m above sea level, extending approximately 1,200 m. Total construction cost is disclosed as 106.7 billion yen.Power & EnergyTomari, Hokkaido¥106.7BBuilding
2026.07.30J-Holdings Co., Ltd.2721J-Holdings to acquire Shokawa battery energy storage facility in Gifu PrefectureJ-Holdings's consolidated subsidiary J-Crest will acquire a grid-scale battery energy storage facility (Shokawa ESS) located in Takayama, Gifu Prefecture from Recharge Power as part of a capital and business partnership to expand the grid-scale battery storage business. The 2MW/8MWh facility is planned to be completed and grid-connected in December 2026, with operational commencement and market participation expected in early 2027.Power & EnergyTakayama, Gifu¥700MPlanned
2026.07.30Mazda Motor Corporation7261Mazda opens first Indonesian vehicle assembly plant in BogorMazda has opened its first Indonesian complete vehicle assembly factory in Citeureup, Bogor Regency, West Java, through local partner PT Eurokars Motor Indonesia (EMI) and PT Eurokars Produksi Pratama (EPP) on July 28, 2026. Mazda invested over IDR 400 billion to build the roughly 65,000 sqm facility, which will produce the CX-30 model for the Indonesian and regional markets.Automotive & TransportCiteureup, Bogor Regency, West JavaIDR 400BCompleted
2026.07.30Mitsubishi Electric Corporation6503Mitsubishi Electric to build data center cooling equipment factory in Ohio, USAMitsubishi Electric will establish MEHITS US, a new subsidiary in Mason, Ohio, in August 2026 to manufacture cooling systems for data centers. The company will invest approximately $30 million to refurbish and convert an existing automotive manufacturing facility, targeting production startup in April 2027 with planned annual capacity of approximately 6,000 units by 2030.Data CentersMason, Ohio, United States$30MPlanned
2026.07.30Mitsubishi Estate and Tokyu Land (joint project)Mitsubishi Estate and Tokyu Land to rebuild Harajuku Hakkakukan building in TokyoMitsubishi Estate and Tokyu Land will rebuild the Harajuku Hakkakukan building in Shibuya ward, Tokyo. The new structure will be a 6-story steel-frame building with total floor area of 2,920 sqm, featuring retail and dining facilities. Construction is scheduled to begin in early October 2026 with completion targeted for August 2030.OtherShibuya ward (Jingumae), Tokyonot disclosedPlanned
2026.07.30Nippon Chikudenchi Co., Ltd.Nippon Chikudenchi completes grid-scale battery storage facility in Toyooka, HyogoNippon Chikudenchi has completed construction of NC Toyooka Tajio Energy Storage Station, a 1,988 kW / 8,146 kWh grid-scale battery facility in Hyogo Prefecture. The facility began operation on 24 July 2026 and supports renewable energy integration, grid balancing, and disaster resilience through participation in wholesale electricity markets and capacity markets.Power & EnergyToyooka, Hyogonot disclosedCompleted
2026.07.30Nippon Parking Development Co., Ltd.2353Nippon Parking Development completes small-scale woody biomass power plant at former Hotaka ski resort site in KatashinaNippon Parking Development and subsidiary Smart Green Energy completed Japan's first woody biomass power plant built on a former ski resort site in Katashina village, Gunma Prefecture. The facility, commissioned July 20, 2026, will supply electricity generated from local wood waste primarily to municipal public facilities, demonstrating a regional energy circulation and decarbonization model combining renewable energy with rural regeneration.Power & EnergyKatashina village, Gunmanot disclosedCompleted
2026.07.30Shibusawa WarehouseShibusawa Warehouse opens new Matsudo distribution center for small-lot, multi-variety cargoShibusawa Warehouse has commenced operations of its new "Matsudo Warehouse No. 4" facility in Matsudo, Chiba Prefecture on July 30, 2026. The leased facility, with a contracted floor area of 8,843 sqm, supports the company's light-asset strategy for efficient capital deployment and rapid response to customer needs in small-lot, multi-variety logistics.Logistics FacilitiesMatsudo, Chibanot disclosedCompleted
2026.07.30Shikoku Kasei Industries Co., Ltd.Shikoku Kasei Industries to establish advanced semiconductor materials production facility in SakaideShikoku Kasei Industries will build a new advanced semiconductor materials manufacturing plant in Sakaide, Kagawa Prefecture to meet growing demand for high-performance semiconductors driven by AI and 5G adoption. The facility will introduce state-of-the-art production equipment and establish high-level quality management systems, with operations planned to begin July 2027 and 20 new employees.Semiconductors & ElectronicsSakaide, Kagawanot disclosedPlanned
2026.07.30Tokyu Real EstateTokyu Real Estate to develop wind power facility at Atsuta in Ishikari, HokkaidoTokyu Real Estate (Tokyo) is planning a wind power generation project in the Atsuta district of Ishikari City, Hokkaido. The Ishikari City Environmental Council submitted its advisory opinion on the environmental impact assessment to the mayor on July 30, 2026, noting potential effects on white-tailed eagles. The project is in the environmental review phase.Power & EnergyIshikari, Hokkaidonot disclosedPlanned
2026.07.29Daiichi Kogyo Seiyaku Co., Ltd.4461Daiichi Kogyo Seiyaku to invest ¥10bn to boost low-dielectric resin supply capacityDaiichi Kogyo Seiyaku decided on capital investment to strengthen its supply system for low-dielectric resin materials used in high-end servers, amid surging demand driven by data center and high-speed communication infrastructure expansion. The investment, targeting domestic and overseas production sites, totals approximately ¥10 billion and is planned to begin operation from fiscal 2027 onward.Materials & ChemicalsMultiple (Japan)¥10BPlanned
2026.07.29Hokkaido UniversityHokkaido University opens semiconductor prototyping lab for workforce trainingHokkaido University's Semiconductor Frontier Education and Research Organization (IFERS) held the opening ceremony for its 'Semiconductor Prototyping Lab' on the university campus in Sapporo on July 29, 2026, offering hands-on training in semiconductor manufacturing processes with an ISO Class 5/7 cleanroom. The lab is supported by the Cabinet Office's regional university and industry creation grant program together with Hokkaido, Sapporo and Chitose, with full fit-out expected by the end of fiscal 2027.R&D FacilitiesSapporo, Hokkaidonot disclosedCompleted
2026.07.29itsumo.inc.7694Itsumo opens TikTok Shop-dedicated fulfillment centers in Chiba and HyogoE-commerce support firm Itsumo has launched two new fulfillment centers dedicated to TikTok Shop: one in Noda, Chiba and one in Nishinomiya, Hyogo, both operational since April 2026. Combined the two raised-floor warehouses provide capacity for about 350,000 shipments per month, designed to handle the sudden order surges typical of live-commerce sales, with plans to expand further fulfillment sites nationwide.Logistics FacilitiesNoda, Chiba / Nishinomiya, Hyogo, Multiple (Japan)not disclosedCompleted
2026.07.29Nippon GLPNippon GLP and Gion to build 135,000-sqm logistics warehouse in SagamiharaGion GLP Sagamihara, a special-purpose joint venture between Sagamihara-based logistics firm Gion Co., Ltd. and developer Nippon GLP, will construct a new RC/steel five-story warehouse with total floor area of approximately 135,388 sqm on a 54,070 sqm site in Sagamihara City as part of an industrial land redevelopment project (the Asamizodai-Shin'izono district). Construction is scheduled to start in January 2027 and complete by end of March 2029, with design by Toa Corporation; the general contractor has not yet been determined.Logistics FacilitiesSagamihara, Kanagawanot disclosedPlanned
2026.07.29Nomura Real Estate Co., Ltd.Nomura Real Estate starts agrivoltaic solar demonstration in Kawajima, SaitamaNomura Real Estate began a demonstration project for agrivoltaic (farm-based) solar power generation on approximately 3,515 sqm of farmland in Kawajima, Saitama Prefecture, using sun-tracking solar panels installed above crops. The trial, part of the company's new Infrastructure & Industry business unit launched in FY2026, aims to diversify renewable energy procurement and will run for about three years starting July 2026, generating roughly 80MWh/year.Power & EnergyKawajima, Saitamanot disclosedCompleted
2026.07.28Hexa Energy Service LLCHexa Energy Service to build 49.7MW grid-scale battery storage plant in Fukushima, secures long-term offtake with Tokyo GasHexa Energy Service, a Japan-based unit of I Squared Capital, has signed a 20-year long-term offtake agreement with Tokyo Gas for a grid-scale battery storage facility it is developing in Fukushima Prefecture. Hexa will develop, own and maintain the facility while Tokyo Gas will operate it, trading in electricity markets; commercial operation is planned for FY2029.Power & EnergyFukushimanot disclosedPlanned
2026.07.28Nunome Denki Co., Ltd.Nunome Denki holds groundbreaking for new semiconductor equipment plant in Shirakawa, FukushimaNunome Denki held a groundbreaking (jichinsai) ceremony for a new factory to produce semiconductor manufacturing equipment in Shirakawa City, Fukushima Prefecture. The project adds to Japan's semiconductor equipment supply chain capacity in the Tohoku region.Semiconductors & ElectronicsShirakawa, Fukushimanot disclosedBuilding
2026.07.28Pacific Consultants Co., Ltd.Pacific Consultants to launch floating solar demonstration using perovskite panels at Nagano dam reservoirPacific Consultants will begin a demonstration project installing floating photovoltaic systems - including perovskite, thin-film silicon and conventional silicon modules - on a multipurpose dam reservoir in Nagano Prefecture. The project, selected under Japan's Ministry of the Environment FY2026 renewable energy demonstration program, aims to verify technical feasibility for design, construction and maintenance of floating solar on deep, water-level-fluctuating dam reservoirs, with potential future rollout to other multipurpose dams and unused water surfaces such as ports.Power & EnergyNaganonot disclosedPlanned
2026.07.28Resonac Holdings Corporation4004Resonac to invest ¥15 billion more in Singapore hard disk media plantResonac Holdings will make an additional investment of approximately ¥15 billion at its Resonac HD Singapore subsidiary to expand hard disk media production capacity, driven by growing AI and cloud-driven demand for datacenter storage. Combined with a prior May 2026 expansion announcement, total capacity will rise 44% from about 160 million disks to about 230 million disks per year, with production lines to be brought online progressively from 2029. Resonac, a key merchant supplier of hard disk media to HDD makers, has also agreed on a price revision with customers to reflect the investment.Semiconductors & ElectronicsSingapore¥15BPlanned
2026.07.28Shibahara Kogyo Co., Ltd.Shibahara Kogyo to launch new welding-consolidation plant next month, lifting output 30%Shibahara Kogyo will begin operating a new factory next month that consolidates its welding processes into a single site. The move is expected to increase production capacity by about 30%.Machinery & RoboticsIwata, Shizuokanot disclosedCompleted
2026.07.28TOWING Co., Ltd.TOWING completes biochar demonstration plant in Gunma using livestock manure carbonization equipmentTOWING, a Nagoya University-affiliated agritech startup, completed a demonstration plant in Numata City, Gunma Prefecture that converts livestock manure into high-functionality biochar 'Soratan' using large-scale carbonization equipment developed with Noritake's industrial furnace heating technology. The plant, TOWING's largest and third domestic site, reuses a disused municipal gymnasium and began operation in July 2026, with planned annual biomass input of 10,000 tons, one of Japan's largest capacities for biochar carbonization equipment.Materials & ChemicalsNumata, Gunmanot disclosedCompleted
2026.07.28Yamato SeisakushoYamato Seisakusho to build new plant near HQ in Hamamatsu, targeting late 2028 operationYamato Seisakusho, a manufacturer of motorcycle parts based in Hamamatsu, Shizuoka Prefecture, plans to build a new factory near its headquarters. The company is targeting operational start by the end of 2028.Automotive & TransportHamamatsu, Shizuokanot disclosedPlanned
2026.07.27LaSalle Investment ManagementLaSalle Investment Management to break ground on ~99,560 sqm multi-tenant logistics facility in FukuokaLaSalle Investment Management, through Hakata Island City special purpose company, will start construction on August 3, 2026 of 'LogiPort Fukuoka Island City', a 4-story multi-tenant logistics facility with 99,559.71 sqm total floor area in Fukuoka City's Higashi Ward. The facility will feature temperature-controlled cold storage (5C to -25C) on floors 1-2 and dry warehouse space on floors 3-4, targeting completion by end of October 2028, with Taisei Corporation as the construction contractor.Logistics FacilitiesFukuoka City, Fukuokanot disclosedPlanned
2026.07.27Nippon Chikudenchi Co., Ltd.Nippon Chikudenchi to build grid-scale battery storage station in Shirakawa, FukushimaNippon Chikudenchi Co., Ltd. signed a disaster-response agreement with Shirakawa City, Fukushima Prefecture, under which a grid-connected battery storage station it is installing in the city will supply emergency power during disasters. The facility has a planned rated capacity of about 8MWh (8,146kWh), enough to supply roughly 470 households for 72 hours in an emergency; the company plans to bring 70 such storage sites online nationwide by 2028.Power & EnergyShirakawa, Fukushimanot disclosedPlanned
2026.07.27Tadano Ltd.6395Tadano subsidiary starts operation of new aerial work platform plant in Nagano, boosting output 1.5xTadano's wholly owned subsidiary Tadano Utility began operations in July at its newly built Yahata Plant in Chikuma City, Nagano Prefecture, a facility for assembling and painting large self-propelled aerial work platforms (18m+ working height). Combined with the existing Chikuma and Omi plants, the new plant expands Tadano Utility's production capacity by 1.5x, supporting the company's mid-term strategy to grow overseas sales of large aerial work platforms.Machinery & RoboticsChikuma, Nagano¥3.5BCompleted
2026.07.25Nippon Steel Corporation5401Nippon Steel starts construction to convert Yawata works to large electric arc furnace processNippon Steel held the groundbreaking ceremony on 15 April 2026 for converting its Kyushu Works Yawata district from the blast-furnace to the electric-arc-furnace process, targeting the world's first integrated production and mass-production system for high-grade steel using a large electric arc furnace. The Yawata conversion carries an investment of JPY630.2 billion for about 2 million tonnes/year of capacity, with electric-arc-furnace production scheduled to start in the second half of fiscal 2029. It is the largest of three district conversions under the company's Carbon Neutral Vision 2050.Steel & Non-ferrous MetalsKitakyushu, Fukuoka¥630.2BBuilding
2026.07.25Rakunou Nyugyo Co., Ltd.Rakunou Nyugyo to build new dairy processing plant in Koriyama, Fukushima with Norinchukin/JFC financingNorinchukin Bank and the Japan Finance Corporation announced financing support for Rakunou Nyugyo's new dairy processing plant in Koriyama, Fukushima Prefecture. The project, with total capex of JPY 17.6 billion, aims to help balance raw milk supply and demand amid aging dairy plant infrastructure nationwide.Food & BeverageKoriyama, Fukushima¥16BPlanned
2026.07.25Tower SemiconductorTower Semiconductor to build new 300mm fab in Uozu, Japan, part of ~$3bn expansionIsraeli chipmaker Tower Semiconductor will build an additional 300mm manufacturing facility next to its Fab 7 in Uozu, Toyama Prefecture, Japan, as "Track Two" of a broader expansion. Total investment is approximately $3 billion, of which the Government of Japan is providing about $1 billion in grants (net investment ~$2 billion). The new fab targets a multi-fold increase in Silicon Photonics and Silicon Germanium capacity and is expected to be accretive from 2029. The expansion is run through TPSCo (Tower Panasonic Semiconductor Company), 51% owned by Tower.Semiconductors & ElectronicsUozu, Toyama$3BPlanned
2026.07.24Getworks Co., Ltd.Getworks and Tohoku Electric Power complete container-type 'Miyagi AI Data Center' in ShichigahamaGetworks, in collaboration with Tohoku Electric Power, has completed construction of a new container-type data center called 'Miyagi AI Data Center' on idle land owned by Tohoku Electric Power in Shichigahama, Miyagi Prefecture. The facility will offer housing services for next-generation high-performance GPU servers starting July 31, 2026, supporting generative AI infrastructure demand across the Tohoku region.Data CentersShichigahama, Miyaginot disclosedCompleted
2026.07.24Hoshizaki Corporation6465Hoshizaki affiliate Fogel opens new commercial refrigerator plant in GuatemalaFogel, an equity-method affiliate of Japan's Hoshizaki Corporation, held an opening ceremony on July 23, 2026 for its new commercial refrigerator factory in Villa Canales, Guatemala. The new plant, built since October 2023, has 1.8x the annual capacity of the existing facility (400,000 units/year at full operation) and will support expanded sales across Latin America; Hoshizaki plans to raise its stake in Fogel to 51% to make it a consolidated subsidiary.Other ManufacturingVilla Canales, Guatemalanot disclosedCompleted
2026.07.24JX Advanced Metals Corporation5016JX Advanced Metals to double sputtering target processing capacity in South Korea amid AI chip demandJX Advanced Metals will invest about JPY 4 billion to expand processing capacity for sputtering targets used in advanced logic, HBM, and 3D-NAND chips at its South Korean subsidiary JX Korea. The investment introduces new processing equipment accumulated across the group's Japanese sites, roughly doubling the site's processing capacity versus FY2025 levels, with phased startup expected from FY2027 to meet booming AI data center-driven semiconductor demand.Materials & ChemicalsSouth Korea¥4BPlanned
2026.07.24Mitsui Fudosan8801Mitsui Fudosan to invest over ¥600bn in data centers, expanding into 'industrial developer' roleMitsui Fudosan announced plans to expand beyond logistics facilities into data centers and automated logistics, positioning itself as an 'industrial developer.' The company plans total investment of about ¥600bn across data center projects nationwide, with roughly ¥300bn already invested; new development is underway in the Kansai-Hokusetsu and Kanto-Tama areas, part of 7 facilities in progress nationwide, targeting completion of the full investment plan by FY2035.Data CentersMultiple (Japan)¥600BBuilding
2026.07.24Nakashima Health Force Co., Ltd.Nakashima Health Force to relocate and build new headquarters/factory in Akaiwa, OkayamaOrthopedic medical device maker Nakashima Health Force will relocate its head office and factory to a new site in the Iwata district of Akaiwa City, Okayama Prefecture, investing approximately JPY 10 billion. The new facility will triple floor space versus the current plant, adding labor-saving/automation equipment and metal 3D printers, plus solar power, backup generators and water tanks for disaster resilience.Pharma & MedicalAkaiwa, Okayama¥10BPlanned
2026.07.24Shinko Kogyo Co., Ltd.Shinko Kogyo builds new 'Innovation Center' plant and office in Soja CityAuto parts maker Shinko Kogyo has constructed a new base called the 'Innovation Center' at its existing Soja City (Okayama Prefecture) site, combining head office functions and a factory. The facility aims to prototype and mass-produce higher value-added drivetrain components, boosting profitability; it also includes an on-site nursery.Automotive & TransportSoja, Okayamanot disclosedCompleted
2026.07.23Accrete Inc.4395Accrete to deploy container-type AI data center with Dell water-cooled GPU servers in NiigataAccrete signed agreements with Getworks and Dell Technologies to acquire a new container-type data center in Yuzawa, Niigata Prefecture, equipped with Dell water-cooled NVIDIA B300 GPU servers and quantum-resistant encryption from its subsidiary Forward Edge-AI Japan. The facility leverages secured power and cold climate/well water cooling advantages, with completion and handover expected September 30, 2026 and leasing to begin October 1, 2026.Data CentersYuzawa, Niigatanot disclosedBuilding
2026.07.23Fujifilm Holdings Corporation4901Fujifilm signs MoU with Indian government to build semiconductor materials plant in IndiaFujifilm and its India subsidiary FUJIFILM India signed a non-binding MoU with the Indian government on July 3, 2026 to explore establishing a semiconductor materials manufacturing facility in India. The move aims to strengthen collaboration with Japanese and Indian industry to build a robust local semiconductor supply chain, supporting India's 'Make in India' initiative.Semiconductors & ElectronicsDholera, Gujaratnot disclosedPlanned
2026.07.23Meiko Electronics Co., Ltd.6787Meiko to inject $20M into Vietnam subsidiary to build third PCB factoryJapan's Meiko Corporation (Ayase, Kanagawa) will inject USD 20 million (about JPY 3.26 billion) into its Hanoi-based consolidated subsidiary Meiko Electronics Quang Minh (MKQC), raising its capital to USD 30 million. The funds will be used to build a third factory at MKQC's Quang Minh industrial park site as part of Meiko's mid-term growth investment plan, with the capital injection due August 25.Semiconductors & ElectronicsHanoi, Hanoi$20MPlanned
2026.07.23MonotaRO Co., Ltd.3064MonotaRO installs rooftop solar power system at Ibaraki logistics centerMonotaRO began operating a self-consumption solar power system at its Ibaraki Chuo Satellite Center in Ibaraki Prefecture, with 531.2kW capacity expected to generate about 534,000 kWh annually, covering roughly 25% of the facility's power consumption. The project supports the company's climate target of cutting CO2 emissions 50% by 2030 versus 2020 levels.Logistics FacilitiesIbaraki-machi, Ibarakinot disclosedCompleted
2026.07.23Kyogamo Co., Ltd.Kyogamo builds new factory and relocates HQ in Uji, KyotoA company that raises, processes, and sells aigamo (domesticated duck) meat has built a new factory in Uji City, Kyoto Prefecture, and relocated its headquarters there. The move is aimed at expanding its market reach, though specific investment figures were not disclosed.Food & BeverageUji, Kyotonot disclosedCompleted
2026.07.22Daiwa CorporationDaiwa Corporation completes 34,000-sqm cold storage logistics facility in KawasakiDaiwa Corporation completed its 'Kawasaki Office' facility in the Higashi-Ogishima area of Kawasaki, Kanagawa, converting its former 40-year-old logistics site into a BTS-type frozen/refrigerated facility for food logistics. The seven-story facility spans 33,602 sqm and is expected to begin operations on August 17, 2026, serving the greater Tokyo and eastern Japan region.Logistics FacilitiesKawasaki, Kanagawanot disclosedCompleted
2026.07.22Furuya Metal Co., Ltd.7826Furuya Metal to complete new Chitose plant for semiconductor materialsFuruya Metal, a leading platinum-group-metal (PGM) processor, is building a new plant in Chitose, Hokkaido to produce thermal management substrates (quartz-based temperature sensors) for semiconductor manufacturing equipment such as diffusion furnaces. The plant, costing about JPY 4.5 billion and equipped with automated production systems, is scheduled for completion in July 2026, boosting capacity and supporting BCP resilience alongside its Tsukuba (Chikusei, Ibaraki) plant.Semiconductors & ElectronicsChitose, Hokkaido¥4.5BCompleted
2026.07.22JR East Logistics Co., Ltd.JR East Logistics opens new 33,000 sqm multi-temperature warehouse in Ichikawa, ChibaJR East Logistics opened the 'Ichikawa Distribution Center (JREL Ichikawa DC)', a four-temperature-zone warehouse with about 33,000 sqm of floor space in Ichikawa City, Chiba Prefecture, on June 30. The facility, which will begin phased operations from October, consolidates temperature-segregated logistics functions for JR East's ekinaka (in-station) store supply chain and features advanced material handling equipment including automated storage systems, picking robots, and rooftop solar power generation.Logistics FacilitiesIchikawa, Chibanot disclosedCompleted
2026.07.22Meiji Yakuhin Co., Ltd.Meiji Yakuhin to build new pharmaceutical plant in Toyama, operational July 2028Meiji Yakuhin, a Toyama-based pharmaceutical and health food manufacturer, broke ground on a new factory within its headquarters site on July 17, 2026. The plant is intended to meet growing demand from mail-order/e-commerce sales, with investment of JPY12.5 billion and operations expected to start in July 2028.Pharma & MedicalToyama, Toyama¥12.5BBuilding
2026.07.22OKI Electric Industry Co., Ltd.6703OKI to build new production building at Numazu Plant for defense underwater acousticsOKI will construct a new three-story production building at its Numazu Plant in Shizuoka Prefecture, which manufactures underwater acoustic systems and sensors, to strengthen production capacity for expanding defense demand and dual-use civilian applications such as ocean resource development. The investment is approximately JPY 3 billion, with the new building increasing production of sonar and sonobuoys by about 50% versus FY2023 levels while incorporating energy-saving and solar power facilities targeting ZEB/ZEH standards.Other ManufacturingNumazu, Shizuoka¥3BPlanned
2026.07.22TheNewGate Inc.TheNewGate opens Singapore subsidiary and local warehouse for cross-border e-commerceJapanese cross-border e-commerce support firm TheNewGate has established a wholly-owned subsidiary, TheNewGate Asia Pacific Pte. Ltd., in Singapore and opened a local warehouse to provide local fulfillment services for Shopee sellers. The facility will handle storage and reshipment of goods, including cancelled/returned items, to reduce cross-border logistics costs for small Japanese exporters.Logistics FacilitiesSingapore, Singaporenot disclosedCompleted
2026.07.22Tokyu Fudosan Holdings Corporation3289Tokyu Fudosan completes green data center in Ishikari, Hokkaido, powered by 100% renewable energyGodo Kaisha Ishikari Saiene Data Center No.1, jointly invested by Tokyu Fudosan, Flower Communications, and Agility Asset Advisors, completed construction of a data center in Ishikari City, Hokkaido on March 27, 2026. The facility will run entirely on Ishikari's renewable energy and will begin partial data hall operations in August 2026, connected to Tokyo's Otemachi via NTT East's IOWN All-Photonics Network for low-latency, high-speed connectivity.Data CentersIshikari, Hokkaidonot disclosedCompleted
2026.07.22Yaskawa Electric Corporation6506Yaskawa Electric starts operations at new Plant No.5 for robot production in KitakyushuYaskawa Electric's Yahatanishi facility in Kitakyushu, Fukuoka Prefecture began operating its new Plant No.5 in July 2026, a highly automated site covering motor manufacturing through robot assembly under Yaskawa's 'i3-Mechatronics' concept. The plant has adopted YE DIGITAL's MMLogiStation warehouse execution system (WES) to unify control of automated equipment and support flexible, high-mix production.Machinery & RoboticsKitakyushu, Fukuokanot disclosedCompleted
2026.07.21Aida Engineering, Ltd.6118Aida Engineering to build new automation equipment factory in the USAida Engineering will build a new factory in Auburn Hills, Michigan, consolidating the production bases of its subsidiaries Dallas Industries and HMS Products to establish integrated press-line supply in North America. Investment is approximately $33 million (about JPY 5.3 billion); completion is planned for end-2027 with operation starting during FY2028.Machinery & RoboticsAuburn Hills, Michigan¥5.3BPlanned
2026.07.21Glome Holdings, Inc.8938Glome Holdings starts trial operation of grid-connected battery storage 'Toyooka No.1' in HyogoGlome Holdings Inc. announced that its grid-connected battery energy storage system (BESS) 'Toyooka No.1' in Toyooka City, Hyogo Prefecture has begun trial operation, ahead of planned handover and commercial operation on August 1, 2026. The facility has a maximum receiving power of 1,988kW and connects to Kansai Electric Power's grid, forming part of the company's entry into the grid-scale battery storage business announced in April 2026.Power & EnergyToyooka, Hyogonot disclosedBuilding
2026.07.21Green Energy FrontierGreen Energy Frontier breaks ground on new Central Power Substation at Narita AirportGreen Energy Frontier began construction on April 1, 2026 of a new central power substation serving Narita International Airport, the first full renewal of the facility since the airport opened. The new substation will expand receiving capacity by about 1.5x to accommodate future demand from Narita's runway expansion and terminal reconstruction project, and will feature AI-based energy demand forecasting and space for the company's headquarters relocation; completion is planned for FY2028.Power & EnergyNarita, Chibanot disclosedBuilding
2026.07.21Konoike Transport Co., Ltd.9025Konoike Transport's Vietnam unit Anpha-AG starts new ambient/chilled warehouse in Tay NinhAnpha-AG Joint Stock, a Vietnamese subsidiary of Japan's Konoike Transport group, began operating a new ambient and chilled warehouse adjacent to its existing facility in Tay Ninh Province, southern Vietnam, investing JPY 527 million. The new facility handles food products and ingredients, integrating with the existing cold storage to create a three-temperature-zone logistics system, raising combined storage capacity to 26,600 pallets across 15,676 sqm of floor space.Logistics FacilitiesCan Giuoc Commune, Tay Ninh Province¥527MCompleted
2026.07.21Mitsubishi Cable Industries, Ltd.Mitsubishi Cable Industries completes new Kumagaya No. 2 plant for next-gen seal productsMitsubishi Cable Industries has completed construction of a new 'Kumagaya No. 2 Plant' at its Kumagaya site in Saitama Prefecture to strengthen production of high-value-added seal products for semiconductor manufacturing equipment and pneumatic devices. The plant, built at a cost of JPY 4.35 billion, completed construction on March 31, 2026 and is scheduled to begin mass production in July 2026, complementing the No. 1 plant that began operations in 2023.Semiconductors & ElectronicsKumagaya, Saitama¥4.4BCompleted
2026.07.21MK Co., Ltd.MK Taxi installs Japan's first vanadium-ion battery energy storage system at Kyoto HQMK Group's taxi operator MK Co. installed Standard Energy's vanadium-ion battery energy storage system (VIB ESS) at its Kyoto headquarters garage to support EV rapid-charging infrastructure, marking the technology's first deployment in Japan. The system, supplied by South Korea's Standard Energy and distributed via LB Hunet with support from Mitsubishi Corp's Korea unit, will undergo a one-year demonstration from July 2026 before a decision on full-scale rollout, aiming to reduce peak electricity demand charges as MK expands its EV taxi fleet toward full ZEV conversion by 2030.Power & EnergyKyoto, Kyotonot disclosedCompleted
2026.07.21Murata Manufacturing Co., Ltd.6981Murata completes new MLCC production building at Izumo Murata plant in ShimaneIzumo Murata Manufacturing, a production subsidiary of Murata Manufacturing, has completed a new production building at its Izumo, Shimane Prefecture site for multilayer ceramic capacitors (MLCCs). Construction began in March 2024 on the 10-story steel-frame building, with total investment including production equipment reaching approximately JPY 47 billion, as Murata continues to diversify MLCC production across Japan, ASEAN, and China to build a flexible, resilient supply chain.Semiconductors & ElectronicsIzumo, Shimane¥47BCompleted
2026.07.21Okura Yusoki Co., Ltd.Okura Yusoki completes new R&D facility 'MIRAI Lab' in Kakogawa, HyogoOkura Yusoki has completed a new research and development facility called 'MIRAI Innovation Lab' on the site of its head office plant in Kakogawa City, Hyogo Prefecture. The facility will accelerate development of next-generation material handling systems integrating AI and robotics for warehouse and factory automation, and is intended to serve as a future open-innovation hub with universities, research institutes and startups.Machinery & RoboticsKakogawa, Hyogonot disclosedCompleted
2026.07.21Resahl Kosan Co., Ltd.Resahl Kosan completes new Kamikawa plant, boosts CalsNC-R output 1,000-foldResahl Kosan Co., Ltd., a Saitama-based maker of microbial soil-improvement products, marked the one-year anniversary of its new Kamikawa Plant (Saitama Prefecture), built in March 2025 with roughly double the floor space of its previous factory. Automation of the production line allowed output of its flagship 'CalsNC-R' soil conditioner to surge from about 20 bags/month pre-pandemic to an average of 20,000 bags/month (peak 26,400 bags), driven by demand spikes from gardening YouTube coverage.Materials & ChemicalsKamikawa, Saitamanot disclosedCompleted
2026.07.21Riken Vitamin Co., Ltd.4526Riken Vitamin acquires 48,000 sqm plant site in Anpachi, Gifu to relocate Kyoto plantRiken Vitamin has acquired about 48,000 square metres in Anpachi, Gifu for approximately ¥3.6 billion, to build a plant that will take over from its Kyoto plant. The site will make colour products including crocetin and gardenia blue pigment, expanding production capacity. The sale contract was signed in June 2026, ownership transfers in autumn 2027, and the company is targeting operation in fiscal 2030.Food & BeverageAnpachi, Gifu¥3.6BPlanned
2026.07.21Sanyu SeisakushoSanyu Seisakusho brings new plant online to consolidate medical analyzer parts assemblySanyu Seisakusho has started operations at a new facility called Integra Center, which serves as a hub for assembly operations and warehouse functions to build a more stable production system. The company's core business is precision assembly for medical analysis equipment, though the announcement itself does not explicitly name that product line; financial details were not disclosed.Pharma & MedicalIbarakinot disclosedCompleted
2026.07.21Toyota Motor Corporation7203Toyota to build new vehicle plant in Toyota City, AichiToyota Motor Corporation has decided to acquire land in the Sadataka area of Toyota City, Aichi Prefecture, to establish a new vehicle factory, aiming to begin operations in the early 2030s. Which vehicles it will produce has not yet been determined. Toyota will proceed with the project in cooperation with Aichi Prefecture, Toyota City and local residents.Automotive & TransportToyota, Aichinot disclosedPlanned
2026.07.21UHA Mikakuto Co., Ltd.UHA Mikakuto to build new plant in Kagoshima for sweet potato processingUHA Mikakuto (Osaka) signed a location agreement with Kanoya City, Kagoshima Prefecture to establish a new plant that will process and freeze-slice sweet potatoes, the key raw material for its 'Osatsu Doki' snack. The facility will move into an existing building formerly used by another company, with operations planned to start in September 2027, investing about JPY 680 million and creating 23 new jobs.Food & BeverageKanoya, Kagoshima¥680MPlanned
2026.07.21Yasuda Warehouse Co., Ltd.9324Yasuda Warehouse breaks ground on new logistics warehouse in IndonesiaYasuda Warehouse's local subsidiary PT. JAYA YASUDA INDONESIA held a groundbreaking ceremony on July 7, 2026 and began construction of a new warehouse in the MM2100 Industrial Estate, Bekasi, West Java, Indonesia. The project supports the company's mid-term plan to expand its logistics network in Southeast Asia and enter Indonesia's domestic distribution market, leveraging the site's proximity to Jakarta for import/export cargo handling.Logistics FacilitiesBekasi, West Javanot disclosedBuilding
2026.07.21Sanyo Trading Co., Ltd.Yokote Power Plant, wood-biomass facility in Akita, begins commercial operationYokote-Yuzawa Forest Cycle, a joint venture of Tohoku Electric Power, Kitanihon Sakudo, Sanyo Trading and Taihei Dengyo, started commercial operation of its Yokote wood-biomass power plant (1,980kW output) in Akita Prefecture on June 30, with a completion ceremony held July 16. A second facility, the Yuzawa plant, is scheduled to begin operation at end-October. The plants use locally sourced Akita timber, supporting regional forestry, resource circulation and decarbonization goals.Power & EnergyYokote, Akitanot disclosedCompleted
2026.07.20Oval Corporation7727Oval completes new flow-meter factory in Hefei, China via subsidiaryOval Corporation has completed construction of a new factory for its consolidated subsidiary Hefei Oval Instrument in Hefei, Anhui Province, China. The plant, with a site area of about 3,300 sqm and total floor area of about 6,400 sqm, will produce flow meters to meet steady demand in the Chinese market driven by lithium-ion battery, marine, chemical, and energy sectors, complementing existing plants and optimizing the group's global production network.Machinery & RoboticsHefei, Anhuinot disclosedCompleted
2026.07.20Power X, Inc.485APower X to build new battery storage system factory in Tomakomai, HokkaidoPower X Inc. will open a new plant, 'Power Base Hokkaido,' in Tomakomai, Hokkaido, to produce large-scale grid storage battery systems, supporting renewable energy adoption in Hokkaido and Tohoku. The facility will convert an existing building and start production of the 'Mega Power 2500' container-type battery system in June 2027, with total project cost of JPY 3 billion.Power & EnergyTomakomai, Hokkaido¥3BPlanned
2026.07.19Asahi Kasei Corporation3407Asahi Kasei completes new photosensitive dry film resist plant in TaiwanAsahi Kasei's Taiwan subsidiary Hua Xu Technology has completed a new slitting facility in the Guantian Industrial Park, Tainan, for its Sunfort photosensitive dry film resist used in advanced semiconductor packaging, at an investment of about JPY 2 billion. The plant expands Hua Xu's overall slitting capacity by roughly 1.4x, with a design allowing expansion up to about 2x current capacity to meet growing demand tied to AI-driven chip packaging.Semiconductors & ElectronicsTainan, Taiwan¥2BCompleted
2026.07.19Furusato Netsuden Co., Ltd.Furusato Netsuden starts commercial operation of Waita No.2 geothermal power plant in Oguni, KumamotoWaita Dai-2 Chinetsu Hatsuden, backed by Furusato Netsuden, began commercial operation of the Waita No.2 Geothermal Power Plant in Oguni, Kumamoto Prefecture, built in partnership with the local Waita community. The plant has a capacity of 4,995 kW and is expected to generate about 35 million kWh annually, enough for roughly 8,950 households; Tokyo Gas Engineering Solutions served as EPC contractor.Power & EnergyOguni, Kumamotonot disclosedCompleted
2026.07.19Kobayashi Pharmaceutical Co., Ltd.4967Kobayashi Pharmaceutical starts operations at new Sendai pharmaceutical plant in MiyagiKobayashi Pharmaceutical's wholly-owned subsidiary Sendai Kobayashi Pharmaceutical has begun full operation of a new pharmaceutical plant at the Sendai Kita Core Industrial Park in Taiwa-cho, Miyagi Prefecture. The facility, built to PIC/S GMP international standards with an investment of about JPY 26 billion, will produce liquid bandages, eye drops, and topical anti-inflammatory products, with total annual capacity of about 35 million units across all products.Pharma & MedicalTaiwa, Miyagi¥26BCompleted
2026.07.18Central Japan Railway Company (JR Tokai)9022JR Tokai and Shizuoka Prefecture sign agreement enabling Maglev construction to start in Shizuoka sectionJR Central (JR Tokai) signed an agreement with Shizuoka Prefecture under the prefecture's nature conservation ordinance, satisfying the final requirement to begin construction of the Shizuoka section of the Chuo Shinkansen maglev line. This was the last unstarted section between Tokyo/Shinagawa and Nagoya, and construction could begin within the year, resolving a years-long standoff over water resource protection for the Oi River.Automotive & TransportShizuokanot disclosedPlanned
2026.07.18Kaishin Digital Infrastructure Co., Ltd.Kaishin Digital Infrastructure to build 350 MW AI data center in Satsumasendai, KagoshimaKaishin Digital Infrastructure, a joint venture set up by Taiwan's CDIB Capital Group and Shin-Etsu Kagaku Sangyo, signed a location agreement with Satsumasendai City on 18 July 2026 to build an AI data center on the Circular Park Kyushu site, the former Sendai thermal power station. Planned investment is approximately ¥850 billion for a cumulative 350 MW of capacity, which the city describes as among the largest in Japan. The site will start with a demonstration phase and expand in stages. The city expects a further ¥2 trillion of AI server-related investment across the wider park. The company was incorporated on 20 January 2026; a five-party memorandum with Kagoshima Prefecture, Circular Park Kyushu and Kyushu Electric Power followed on 12 February 2026.Data CentersSatsumasendai, Kagoshima¥850BPlanned
2026.07.17Daiwa House Industry Co., Ltd.1925Daiwa House starts construction of multi-tenant logistics facility 'DPL Morioka Minami'Daiwa House Industry has broken ground on a new multi-tenant logistics facility named DPL Morioka Minami in Iwate Prefecture. The project adds distribution capacity in the Tohoku region, though financial details were not disclosed.Logistics FacilitiesMorioka, Iwatenot disclosedBuilding
2026.07.17Datasection Inc.3905Datasection begins GPU server installation at Japan's first AI data centerData Section began moving NVIDIA B300 GPU servers into what it calls Japan's first dedicated AI data center, in Inzai, Chiba - relocated from an originally planned Osaka site to cut latency for customers. Built inside a data-center facility in Inzai, it is being brought online in stages between May and July 2026. The company has committed about ¥50.9bn to acquire the B300 server fleet for the cluster.Data CentersInzai, Chiba¥50.9BBuilding
2026.07.17EIZO Corporation6737EIZO to build new factory near Mumbai, India for monitor productionEIZO, a major monitor maker headquartered in Ishikawa Prefecture, plans to construct a new factory near Mumbai, India, with shipments expected to start as early as July 2028. The plant will target medical, aviation control, and video production monitor markets, and will house the headquarters functions of EIZO's Mumbai sales subsidiary established in 2023.Semiconductors & ElectronicsMumbai, Maharashtranot disclosedPlanned
2026.07.17Environmental Friendly Holdings Co., Ltd.3777Environmental Friendly Holdings' Tomakomai AI data center Phase I gets MOU with Finland's Verda Cloud for lease priority talksEnvironmental Friendly Holdings' subsidiary AI Tech Tomakomai signed a preferential negotiation MOU with Finnish AI cloud provider Verda Cloud Oy for a definitive colocation lease covering the full 10MW Phase I capacity of the Tomakomai AI data center in Hokkaido. The MOU includes a $5 million reservation deposit and marks the first concrete demand-side milestone for the project, which also plans a 50MW Phase II expansion via new 66kV substation infrastructure.Data CentersTomakomai, Hokkaidonot disclosedBuilding
2026.07.17Green Battery Co., Ltd.Green Battery starts construction of grid-scale battery storage project in YamanashiGreen Battery Co., Ltd. has begun construction of a 2MW/8MWh grid-connected battery storage facility in Otsuki City, Yamanashi Prefecture, aimed at providing balancing capacity for the power grid amid growing renewable energy adoption. The facility is expected to begin operations in August 2026, participating in Japan's balancing, wholesale, and capacity markets.Power & EnergyOtsuki, Yamanashinot disclosedBuilding
2026.07.17NHK Spring Co., Ltd.5991NHK Spring (Nippon Hatsujo) to build new plant in Thailand for HDD suspension componentsNHK Spring (Nippon Hatsujo) plans to invest approximately JPY 15 billion in a new production building at its Thai subsidiary NHK Spring (Thailand)'s Wellgrow plant in Chachoengsao to increase production capacity for HDD suspensions, a key component. The building is scheduled for completion in December 2027, and will raise the site's HDD suspension capacity by up to 1.6x; the company plans roughly JPY 35 billion in total investment across further phases to meet rising demand from AI-related data centers.Semiconductors & ElectronicsChachoengsao, Thailand¥15BPlanned
2026.07.17RemixPoint Inc.3825RemixPoint's Shirakawa grid-scale battery storage facility begins balancing market operationsRemixPoint Inc. has completed grid interconnection of its 'NC Shirakawa Hyogo Bansawa' grid-scale battery storage facility in Fukushima Prefecture (1,998kW / 8,146kWh, using CATL batteries and TMEIC power conditioning systems) and started operating it in Japan's balancing (demand-supply adjustment) market as of July 17, 2026. This is the company's second facility to enter the balancing market, part of a mid-term plan to develop 32 grid-scale storage sites by FY2029, with over 20 to be company-owned.Power & EnergyShirakawa, Fukushimanot disclosedCompleted
2026.07.17Sagawa Express Co., Ltd.9143Sagawa Express brings its 87,000 sqm Kanto Hub Center in Koto, Tokyo onlineSagawa Express (SG Holdings group) is bringing its new Kanto Hub Center in Koto, Tokyo into full operation from July 21, 2026 - an approx. 87,000 sqm relay hub with 162 truck berths and sorting capacity of 50,000 parcels per hour. The hub consolidates freight to raise load efficiency and optimize large-truck runs across the Kanto network; the building itself (SG Realty Shinsuna) was completed in January 2026. Kansai (Amagasaki, Feb 2027) and Kyushu (Fukuoka, 2028) hubs are planned to follow.Logistics FacilitiesKoto, Tokyonot disclosedCompleted
2026.07.17Yo-Ho Brewing CompanyYo-Ho Brewing opens new craft beer brewery in Izumisano, OsakaCraft beer maker Yo-Ho Brewing (Karuizawa, Nagano) opened a new brewery in Izumisano, Osaka on July 23, with the full JPY 3.8 billion construction cost funded by furusato nozei (hometown tax) donations raised by the city. The facility, located in Rinku Town, is a unique case of a capex project financed entirely through crowdfunding-style local tax donations rather than corporate investment.Food & BeverageIzumisano, Osaka¥3.8BCompleted
2026.07.16Megmilk Snow Brand Co., Ltd.2270Megmilk Snow Brand starts operations at new processed cheese plant in VietnamMegmilk Snow Brand's Vietnamese subsidiary held an opening ceremony and began operations at its newly built processed cheese plant in Tay Ninh Province (formerly Long An Province), southern Vietnam. The 1.5-hectare facility supports the company's mid-term plan to strengthen overseas expansion, targeting Vietnam's growing cheese market driven by rising incomes and Westernizing diets, with plans to later expand into neighboring countries.Food & BeverageTay Ninh, Vietnamnot disclosedCompleted
2026.07.16Taiwan Semiconductor Manufacturing CompanyTSMC to accelerate construction of Kumamoto second fabTSMC reported record quarterly profit driven by AI-related chip demand and said it will speed up the launch of new plants in Japan. The comments are seen as referring to accelerating construction of its second Kumamoto fab (Kikuyo Town), targeting mass production start in 2028.Semiconductors & ElectronicsKikuyo, Kumamotonot disclosedBuilding
2026.07.15Matsuya Co., Ltd.Matsuya starts operation of new rice flour products plant in Niigata CityMatsuya has begun full operation of a new plant in Niigata City, Niigata Prefecture, built to expand production capacity for its mainstay rice flour-based products. The facility will produce baby food, disaster stockpile food, care food, and chip snacks, targeting growing demand from an aging population and disaster preparedness needs.Food & BeverageNiigata, Niigatanot disclosedCompleted
2026.07.15Syla Holdings Co., Ltd.8887Syla Solar to acquire grid-connected battery storage facility in TochigiSyla Holdings' subsidiary Syla Solar resolved to acquire land and a grid-connected battery storage facility in Oyama City, Tochigi Prefecture, with 2MW receiving capacity and 8MWh storage capacity. The purchase price is undisclosed but confirmed to be less than 30% of the company's consolidated net assets as of FY2026/5. Contract signing is planned for July 17, 2026, with settlement and delivery expected November 1, 2026.Power & EnergyOyama, Tochiginot disclosedPlanned
2026.07.14Daichu Co., Ltd.Daichu completes new large-parts machining plant in Nagahama, ShigaDaichu, a Nagahama, Shiga metalworking manufacturer covering casting, fabrication, machining, painting and assembly, completed its new 'No. 6 Plant' on its headquarters grounds on March 5, 2026. The 525 sqm building is dedicated to large-parts machining, equipped with a 5-face gantry machining center (Okuma MCR-A5CII), a 10-ton crane and welding equipment, expanding capacity for large diesel-engine components and large fabricated parts amid growing orders.Machinery & RoboticsNagahama, Shiganot disclosedCompleted
2026.07.13Acecook Co., Ltd.Acecook starts operations at new ¥27bn Kanto plant in Kawagoe, SaitamaInstant noodle maker Acecook began operations at its new Kanto plant in Kawagoe, Saitama on May 11, 2026 - a roughly ¥27bn investment covering land, building and equipment on a 78,000 sqm site. The plant becomes the core production and distribution hub for mainstay brands including 'Super Cup' and 'Wakame Ramen', strengthening supply capacity for eastern Japan; the company calls 2026 its 'first year of new manufacturing'.Food & BeverageKawagoe, Saitama¥27BCompleted
2026.07.13GC CorporationGC Corporation to build new biomaterials plant at Fuji-Oyama siteDental materials maker GC Corporation is constructing a new biomaterials factory at its Fuji-Oyama plant site in Oyama Town, Shizuoka Prefecture, to expand production of bone graft materials and resorbable membranes. Chiyoda Ex-One Engineering is handling design and EPC construction with partners Kajima Corporation, Techno Ryowa, and Kandenko; construction began in June 2026 with completion targeted by November 30, 2027.Pharma & MedicalOyama, Shizuokanot disclosedBuilding
2026.07.13Hitachi Zosen Marine Engine Co., Ltd.Hitachi Zosen Marine Engine to add ammonia fuel supply and storage equipment at Nagasu plantHitachi Zosen Marine Engine Co., Ltd. signed a location agreement with Nagasu Town, Kumamoto Prefecture, to install ammonia fuel supply equipment and ammonia storage tanks at its site, supporting production of next-generation zero-emission vessels including ammonia-fueled ships. The investment is approximately JPY 2.4 billion, with operations expected to begin sequentially from around April 2028 and about 15 new jobs planned.Automotive & TransportNagasu, Kumamoto¥2.4BPlanned
2026.07.13Joyfull Co., Ltd.9942Joyfull to build new Aichi Toyohashi plant for approx. JPY 7.5bnRestaurant chain operator Joyfull will construct a new food production plant in Toyohashi, Aichi Prefecture, as part of a factory network rebuild addressing aging facilities, natural disaster risk, and rising production volume needs. Investment is approximately JPY 7.5 billion including building and machinery, with completion scheduled for February 2028.Food & BeverageToyohashi, Aichi¥7.5BPlanned
2026.07.13Kanken Techno Co., Ltd.Kanken Techno to expand exhaust gas treatment equipment factory in Tamana CityKanken Techno signed a location agreement with Tamana City, Kumamoto Prefecture, to expand its factory producing exhaust gas treatment and air pollution control equipment used in semiconductor manufacturing. The expansion aims to double production capacity in response to semiconductor market demand, with investment of approximately JPY 1.363 billion and about 48 new jobs planned.Semiconductors & ElectronicsTamana, Kumamoto¥1.4BPlanned
2026.07.13Micron Memory JapanMicron Memory Japan holds groundbreaking for Hiroshima fab expansionMicron broke ground on a new cleanroom building at its Hiroshima fab (Higashihiroshima) to scale production of advanced memory for AI, committing about ¥1.5 trillion in total across the phased build-out. Phase I covers roughly 28,000 sqm; Fujita Corporation is the general construction partner, with production equipment move-in slated for late 2028. The fab - Japan's only DRAM manufacturing site, rooted in the former Elpida operation - will produce next-generation memory including EUV-based 1-gamma DRAM. The project is backed by up to ¥536bn of METI support announced in September 2025.Semiconductors & ElectronicsHigashihiroshima, Hiroshima¥1.5TBuilding
2026.07.13Seed Co., Ltd.7743Seed revises plans for Konosu Research Center Building No.4 Phase IISeed Co., a contact lens manufacturer, disclosed a partial change to the previously announced acquisition of fixed assets related to the second-phase construction of Building No. 4 at its Konosu Research Center. Specific revised terms were not detailed in the available text.Pharma & MedicalKonosu, Saitamanot disclosedPlanned
2026.07.12CSK CorporationCSK completes new plate-processing plant in Gunma, consolidating operationsCSK has completed construction of a new factory for thick steel plate processing in Gunma Prefecture, consolidating its regional business bases into a single site. The facility emphasizes automation for improved safety, productivity, and quality control, with automated/unmanned forklifts planned for introduction this autumn.Steel & Non-ferrous MetalsChiyoda, Gunmanot disclosedCompleted
2026.07.12Birdman Inc.7063Birdman to acquire grid-connected battery storage facilityG-Birdman announced the acquisition of fixed assets related to a grid-connected battery storage system. Details on investment amount, location, and timeline were not disclosed in the available notice.Power & Energynot disclosedPlanned
2026.07.12TechnosTechnos completes new Tottori factory to expand into semiconductor, aerospace partsPrecision parts machining company Technos (Soja City) has completed a new factory in Tottori City, equipping it with multiple large machining centers to handle larger components. The facility targets order growth in advanced sectors such as semiconductors and aerospace, with future plans to leverage AI in production.Machinery & RoboticsTottori City, Tottorinot disclosedCompleted
2026.07.11Ninomiya Co., Ltd.Ninomiya to build new casting plant at Nishio headquarters site, doubling capacityAuto parts casting maker Ninomiya (Nishio, Aichi) has constructed a new factory on its headquarters site, set to begin full operation this autumn. Combined with the existing plant, production capacity will more than double, supporting diversification into construction machinery and semiconductor equipment parts to reduce automotive dependency to around 70%.Automotive & TransportNishio, Aichinot disclosedCompleted
2026.07.10Kawai Musical Instruments Manufacturing Co., Ltd.7952Kawai Musical Instruments completes new electronic piano plant in IndonesiaKawai Musical Instruments Mfg. announced completion of a new third factory in Karawang Regency, West Java, Indonesia, built by its local subsidiary Kawai Indonesia to produce electronic pianos. The plant, with a total investment of JPY 4 billion, introduces labor-saving and automation equipment to boost production capacity and quality, supporting Kawai's mid-term plan to raise its global electronic piano market share to 24.4% by 2035.Other ManufacturingKarawang, West Java¥4BCompleted
2026.07.09KOSE Corporation4922KOSE starts operation of new Minami-Alps plant in Yamanashi with hydrogen-powered energy modelKOSE Corporation began full operation of its new Minami-Alps plant in Yamanashi Prefecture on July 9, 2026, marking the company's third domestic production base and coinciding with its 80th founding anniversary. The plant leverages Yamanashi's water resources and adopts green hydrogen and hydroelectric power to build a local energy production-consumption model, with planned employment of up to 300 workers.Other ManufacturingMinami-Alps, Yamanashi¥27.5BCompleted
2026.07.07Japan Blood Products OrganizationJapan Blood Products Organization to build new plasma-fractionation plant in Chitose, HokkaidoThe Japan Blood Products Organization announced a plan to strengthen its production base for plasma-derived products, centred on building a new manufacturing plant on newly acquired land in Chitose, Hokkaido, at a scale of about JPY200 billion. The plan also refurbishes its two existing domestic sites (Chitose, Hokkaido and Fukuchiyama, Kyoto), doubling current plasma processing capacity. Japan's self-sufficiency rate for these products fell from near 100% in FY2015 to 59.4% in FY2025, and the expansion is aimed at restoring domestic supply.Pharma & MedicalChitose, Hokkaido¥200BPlanned
2026.07.06Toyota Motor Corporation7203Toyota to build new plant building in Texas, shifting large truck production from MexicoToyota Motor North America announced construction of a new plant building at its Texas vehicle plant, set to begin operations in 2030. The facility will handle part of the production of the Tacoma pickup truck, currently strong in US demand, shifting output from Mexico. Total investment is $3.6 billion (approx. JPY 580 billion).Automotive & TransportSan Antonio, Texas$3.6BPlanned
2026.07.01Yaskawa Electric Corporation6506Yaskawa builds new European logistics center and expands robotics plant in SloveniaYaskawa Electric's European robotics subsidiary will build a new logistics facility (ERDC) in Kocevje, Slovenia, and relocate/expand its YASKAWA Ristro production and development operations to the same site. The investment aims to strengthen Europe's robotics business by consolidating logistics, reducing delivery lead times and costs, and expanding manipulator production capacity to up to 850 units, while broadening application coverage to construction and agricultural machinery beyond automotive.Machinery & RoboticsKocevje, Slovenia¥5BPlanned
2026.06.26Daikokuten Bussan Co., Ltd.Daikokuten Bussan to build new food processing center in KagawaDiscount store operator Daikokuten Bussan will construct a new process center in Kannonji City, Kagawa Prefecture, for food manufacturing, processing, and distribution. The facility aims to expand product supply capacity, reduce logistics costs, and improve freshness for the company's 251-store discount chain network, with operations expected to begin September 2027 and 251 new jobs created.Food & BeverageKannonji, Kagawanot disclosedPlanned
2026.06.23Rot Service Co., Ltd.Rot Service to build new Takamatsu Kanan branch for freight warehousing and transportRot Service Co., Ltd., a Takamatsu-based general freight trucking company, will construct a new branch facility in Takamatsu's Kanan area for storage and transport of consigned freight across Shikoku. The project has been designated for subsidies under Kagawa Prefecture's corporate investment incentive ordinance, with operations slated to begin April 2027.Logistics FacilitiesTakamatsu, Kagawa¥550MPlanned
2026.06.19Samson Co., Ltd.Samson to build new R&D building at Kannonji headquartersSamson Co., Ltd., a Kagawa-based maker of boilers and food processing equipment, will construct a new R&D/testing facility at its Kannonji, Kagawa headquarters site to develop new food equipment products and labor-saving robots for food factories amid labor shortages. The company has been designated as eligible for subsidies under Kagawa Prefecture's corporate investment ordinance, with operations expected to begin in April 2027.Machinery & RoboticsKannonji, Kagawanot disclosedPlanned
2026.06.12Kyowa Dambouru Co., Ltd.Kyowa Dambouru to build combined manufacturing-logistics plant in Ena, GifuKyowa Dambouru Co., Ltd., a corrugated cardboard manufacturer headquartered in Ena City, has signed a location agreement with Ena City to build a combined manufacturing and logistics base at the Ena Nishi Industrial Park. The site spans approximately 3.1 hectares, with operations expected to start around 2028.Other ManufacturingEna, Gifunot disclosedPlanned
2026.06.04Hattendo Co., Ltd.Hattendo to build new factory at Hattendo Village near Hiroshima AirportHattendo Co., Ltd. (Mihara, Hiroshima), known for its chilled cream bread, will break ground on June 5, 2026 for a new factory within its 'Hattendo Village' food theme park near Hiroshima Airport. The facility will expand its bread and confectionery lineup for gift/souvenir products, pursue FSSC22000 food safety certification, and include a visitor experience facility, with completion expected in June 2027.Food & BeverageMihara, Hiroshimanot disclosedBuilding
2026.05.08Sony Semiconductor Solutions CorporationSony Semiconductor and TSMC to add next-gen image-sensor line at ¥180bn Kumamoto fabSony Semiconductor Solutions and TSMC signed a basic agreement toward a strategic partnership on next-generation image sensors, considering a joint venture and development/production lines at Sony's new fab under construction in Koshi, Kumamoto. Total investment is about ¥180bn for roughly 10,000 wafers/month (300mm-equivalent), with supply from May 2029; the project is eligible for up to ¥60bn of METI support.Semiconductors & ElectronicsKoshi, Kumamoto¥180BBuilding
2026.04.24NGK Insulators, Ltd.5333NGK Insulators to build ¥70bn semiconductor-ceramics plant in Nomi, IshikawaNGK Insulators will invest about ¥70bn to build a new production site in Nomi, Ishikawa for ceramics used in semiconductor manufacturing equipment. Output will be handled by subsidiary NGK Ceramic Device, with mass production targeted from October 2029, to meet demand growth driven by AI-era chip investment.Semiconductors & ElectronicsNomi, Ishikawa¥70BPlanned
2026.04.17NTT DATA Group Corporation9613NTT Data starts development of ~250MW Inzai-Shiroi data center campus, among Japan's largestNTT Data Group, through NTT Global Data Centers, launched development of the 'Tokyo TKY12' data center campus in the Inzai-Shiroi area of Chiba - a roughly 250MW, six-building campus that will rank among Japan's largest. First-phase service is planned for 2030 onward, with a high-efficiency, expandable design built for growing cloud and AI demand.Data CentersShiroi, Chibanot disclosedPlanned
2026.04.09Allied Material Corporation5541Allied Material to build new tungsten powder plant in Toyama, boosting capacity 1.5xAllied Material Corporation, a Sumitomo Electric group company, will invest about ¥15.9bn to build a new plant near its Toyama Works (Iwase-Koshimachi, Toyama City) to strengthen stable supply of tungsten powder and tungsten carbide powder - materials essential for cemented carbide tools, semiconductor circuit wiring and electronic components amid global supply concerns. On a roughly 40,000 sqm site about 1km from the existing plant, the facility will raise reduction and carbonization capacity by about 1.5x, with operations targeted for H1 FY2028. The project is certified under METI's critical-minerals supply-security program and is eligible for a subsidy.Materials & ChemicalsToyama, Toyama¥15.9BPlanned
2026.03.19Honda Motor Co., Ltd.7267Honda to invest ~¥25bn in a third line at its Tapukara, India motorcycle plantHonda Motorcycle & Scooter India will invest about ¥25bn (approx. INR 15 billion / Rs 1,500 crore) to add a third production line at its second plant in Tapukara, Alwar district, Rajasthan, on newly acquired adjacent land of about 74,000 sqm. The line will build 125cc and 160cc scooters and light motorcycles with annual capacity of 670,000 units - lifting the plant's total capacity to about 2.01 million units - create roughly 2,000 jobs, and start operation in 2028.Automotive & TransportTapukara, Rajasthan¥25BPlanned

Phase colours run planned → building → completed. Looking for one company's whole footprint? See companies. Looking by place? See regions.